Summary
PRRES20140030
Building Permit - Residential
Closed
TALBOT GREGORY J & KATHLEEN VIRGINIA
ALTERATION OTHER RES
PHOTOVOLTAIC SYSTEM - ROOF MOUNTED AND GROUND MOUNTED - SOLAR - 26.0 KW
01/14/2014
01/28/2014
02/18/2021
Locations
Contacts
TALBOT GREGORY J & KATHLEEN VIRGINIA, Address:4050 SE DOC HENRY RD, Phone:(816) 830-8827  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Rejected 01/17/2014 01/16/2014
Jim Eden
Misc
Resolved
01/27/2014

Provide a complete drawing of the of the roof structure including slope, along with the locations of conduits, inverters, and shut-offs for the entire project.
Misc
Corrective Action Required
01/27/2014

605.11.1 Marking. Marking is required on interior and exterior direct-current (DC) conduit, enclosures, raceways, cable assemblies, junction boxes, combiner boxes and disconnects. 605.11.1.1 Materials. The materials used for marking shall be reflective, weather resistant and suitable for the environment. Marking as required in Sections 605.11.1.2 through 605.11.1.4 shall have all letters capitalized with a minimum height of 3/8 inch (9.5 mm) white on red background. 605.11.1.2 Marking content. The marking shall containthe words “WARNING: PHOTOVOLTAIC POWER SOURCE.” 605.11.1.3 Main service disconnect. The marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated. 605.11.1.4 Location of marking. Marking shall be placed on interior and exterior DC conduit, raceways, enclosures and cable assemblies every 10 feet (3048 mm), within 1 foot (305 mm) of turns or bends and within 1 foot (305 mm) above and below penetrations of roof/ceiling assemblies, walls or barriers.
Misc
Resolved
01/27/2014

605.11.3.3.1 Access. There shall be a minimum 6- foot-wide (1829 mm) clear perimeter around the edges of the roof. Exception: Where either axis of the building is 250 feet (76 200 mm) or less, there shall be a minimum 4-foot-wide (1290 mm) clear perimeter around the edges of the roof. Provide the appropriate perimeter around the array.
Planning Review (FW) Approved 01/15/2014 01/15/2014
Codes Admin
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Add/Alter Other $68.20 $68.20 Paid 01/28/2014
$68.20
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Residential Passed 4/10/2014 (9:30) 4/10/2014 at 12:00 AM 04/10/2014
Electrical Service Inspection Passed 6/5/2014 6/5/2014 at 12:00 AM 06/05/2014
Investigation Inspection Complete 4/28/2019 02/18/2021
Miscellaneous Inspection Passed 2/18/2021 02/18/2021
Miscellaneous Correction
Corrective Action Required
02/18/2021
No final inspection performed No action taken, permit closed
Documents & Images
Date Uploaded File Type Document Name
01/22/2014 Letter Codes Plan Review Conditions
01/27/2014 Letter Codes Plan Review Conditions
01/28/2014 Letter Codes Building Permit
02/05/2014 Letter Fire Building Plan Review
04/10/2014 Letter Inspection Summary
06/05/2014 Letter Inspection Summary
02/18/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home