Summary
PRPWRW20252484
Public Works Right of Way Permit
Issued
AHMED AHMED AHMED IBRAHLM & MOHAMED AHMED MAHA MAHMOUD
PW ROW Cable or Fiber
Section 3 Bore 7910 Feet to install Fiber Cable and Conduit Red Barn to Heartland the small subdivision to the West. M&A Drilling should be the sub for this job.
06/16/2025
06/30/2025
08/29/2025
Locations
Contacts
ERVIN CABLE CONSTRUCTION LLC, Address:PO BOX 10, Phone:(270) 333-3366  
AHMED AHMED AHMED IBRAHLM & MOHAMED AHMED MAHA MAHMOUD, Address:2010 SW RED BARN LN  
Amie Logan, Address:909 TROOST AVE, Phone:(913) 972-2332  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
ROW Length of Boring $1,020.00 $1,020.00 Paid 06/30/2025
ROW Street Crossing $1,360.00 $1,360.00 Paid 06/30/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
06/16/2025 Map
06/16/2025 MCI137-E-LSM147-4PERMIT - COMBINED
06/16/2025 MCI137-E-LSM147-4 PERMIT (1) section 3
06/30/2025 Certificate/License PW ROW Permit
06/30/2025 Receipt Receipt for transaction:2025-005030
07/02/2025 IMG_4033
07/02/2025 IMG_4030
07/02/2025 IMG_4031
07/02/2025 Letter PW ROW Inspections Report
07/08/2025 Letter PW ROW Inspections Report
07/09/2025 Letter PW ROW Inspections Report
07/24/2025 Letter PW ROW Inspections Report
07/24/2025 Possible damage at 2813 SW Heartland curb and Storm box
07/24/2025 Possible damage at 2813 SW Heartland curb and storm box0
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home