Permit Application Status

PRPWFC20173802


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRPWFC20173802
Public Works Infrastructure Permit - Commercial
Final Acceptance
GILLESPIE KENNETH W & MARIJA N
DEVELOPMENT COMPLETE
Residences at Echelon - Public Water line
11/21/2017
12/04/2017
01/11/2024
09/08/2021
Locations
Contacts
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
KAT EXCAVATION INC, Address:309 N OAK, Phone:(816) 690-4611  
GILLESPIE KENNETH W & MARIJA N, Address:1105 N HUNDLEY  
ALDERSGATE METHODIST CHURCH, Address:350 SW M 150 HWY  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Insp Fee $2,475.96 $2,475.96 Paid 11/21/2017
Water Test Fee $600.00 $600.00 Paid 11/21/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous PWORKS Inspection Passed 4/2/2018 at 8:00 AM 04/02/2018
PW-Misc
Informational
04/02/2018
I drove out to this work site this morning, it was snowy and wet. No work was going on today.Steve Robbins 04/02/2018 3:47 PM
Site Visit Partial 4/9/2018 at 10:50 AM 04/09/2018
PW-Misc
Informational
04/09/2018
Matt Munger 04/09/2018 11:00 AM No work was being done on site. I spoke with TJ and he stated KAT will return Wednesday to work on the storm sewer and possibly start on water.
Water - Material Verification Partial 4/12/2018 at 9:20 AM 04/12/2018
Informational
04/12/2018
Matt Munger 04/12/2018 9:32 AM I looked over the C900 water pipe that was delivered on the site (approx. 1260ft). I did not see any defects in the pipe. The pipe was stampedC900 DR 18 PC 235 with a manufactured date of November 17'.
Water - Material Verification Partial 4/12/2018 at 3:00 PM 04/12/2018
Informational
04/12/2018
Matt Munger 04/12/2018 3:10 PM The correct Kennedy Hydrants were on site as well as epoxy coated fittings. The hydrants were marked 5 1/4 and 250 CWP.
Water Line - Construction Inspection Partial 4/26/2018 at 8:55 AM 04/26/2018
PW-Main inspection
Informational
04/26/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
Retention Basin Partial 4/30/2018 at 9:24 AM 04/30/2018
PW-Misc
Informational
04/30/2018
Matt Munger 04/30/2018 9:42 AM Spoke with the foreman that works for MSE that is going to be building the retaining walls throughout the site. I informed him that we will need the certifications from the 3rd party inspector and will be verifying that they are present and doing the inspections. The third party inspector was not on site when I arrived.
Water Line - Construction Inspection Partial 5/3/2018 at 9:15 AM 05/03/2018
PW-Main inspection
Informational
04/26/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
05/03/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
Water Line - Construction Inspection Partial 6/5/2018 at 1:15 PM 06/05/2018
PW-Main inspection
Informational
05/03/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
05/03/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
06/05/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
Water Line - Construction Inspection Partial 6/14/2018 at 1:45 PM 06/14/2018
PW-Main inspection
Informational
06/05/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
06/05/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
06/05/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
06/14/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
Water Line - Hydrostatic Test Partial 6/18/2018 at 10:05 AM 06/18/2018
PW-Misc
Informational
06/18/2018
John DiMauro 06/18/2018 10:34 AM The KAT Excavation crew is filling the line along the new Cheddington Dr to prepare for the hydrostatic pressure test. I will return this afternoon to inspect and observe the test.
Water Line - Construction Inspection Partial 6/18/2018 at 1:15 PM 06/19/2018
PW-Main inspection
Informational
06/14/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
06/14/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
06/14/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
06/14/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
06/19/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
Water Line - Hydrostatic Test Partial 6/19/2018 at 9:00 AM 06/20/2018
PW-Misc
Informational
06/18/2018
John DiMauro 06/18/2018 10:34 AM The KAT Excavation crew is filling the line along the new Cheddington Dr to prepare for the hydrostatic pressure test. I will return this afternoon to inspect and observe the test.
PW-Misc
Informational
06/20/2018
6/19/2018 A hydrostatic pressure test was performed on the new water main installed along Hollywood Dr. for this project. I observed the gauge hold 200psi for two hours. The Kat Excavation crew plans to do the hydro test on the line that runs along Cheddington Dr. this week.
Fire Line - Hydrostatic Test Passed 6/21/2018 at 10:15 AM 06/21/2018
PW-Misc
Informational
06/21/2018
John DiMauro 06/21/2018 12:18 PM The Kat Excavation crew performed the hydrostatic pressure test on the fire line from the backflow preventer through the entire fire line. I observed the gauge hold at 200 psi for two hours. Test passed.
Water Line - Hydrostatic Test Partial 6/20/2018 at 8:30 AM 06/22/2018
PW-Misc
Informational
06/20/2018
John DiMauro 06/18/2018 10:34 AM The KAT Excavation crew is filling the line along the new Cheddington Dr to prepare for the hydrostatic pressure test. I will return this afternoon to inspect and observe the test.
PW-Misc
Informational
06/20/2018
6/19/2018 A hydrostatic pressure test was performed on the new water main installed along Hollywood Dr. for this project. I observed the gauge hold 200psi for two hours. The Kat Excavation crew plans to do the hydro test on the line that runs along Cheddington Dr. this week.
PW-Misc
Informational
06/20/2018
John DiMauro 06/20/2018 11:15 AM The KAT Excavation crew performed the hydrostatic pressure test on the water main along the new Cheddington Dr. I observed the gauge hold 160 psi for two hours. The test passed.
Water Line - Hydrostatic Test Passed 6/22/2018 at 9:00 AM 06/22/2018
PW-Misc
Informational
06/22/2018
John DiMauro 06/18/2018 10:34 AM The KAT Excavation crew is filling the line along the new Cheddington Dr to prepare for the hydrostatic pressure test. I will return this afternoon to inspect and observe the test.
PW-Misc
Informational
06/22/2018
6/19/2018 A hydrostatic pressure test was performed on the new water main installed along Hollywood Dr. for this project. I observed the gauge hold 200psi for two hours. The Kat Excavation crew plans to do the hydro test on the line that runs along Cheddington Dr. this week.
PW-Misc
Informational
06/22/2018
John DiMauro 06/20/2018 11:15 AM The KAT Excavation crew performed the hydrostatic pressure test on the water main along the new Cheddington Dr. I observed the gauge hold 160 psi for two hours. The test passed.
PW-Misc
Informational
06/22/2018
John DiMauro 06/22/2018 1:07 PM The KAT Excavation crew performed the hydrostatic pressure test for the private domestic 4" water line. The initial test failed with a 10 psi drop in the 2 hour time. The crew made corrections and flushed air out of the line and retest. I observed the line hold at 150 psi for 2 hours. Test passed.
Water Line - Construction Inspection Partial 6/22/2018 at 1:30 PM 06/22/2018
PW-Main inspection
Informational
06/19/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
06/19/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
06/19/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
06/19/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
06/19/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
06/22/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
Water Line - Construction Inspection Partial 6/25/2018 at 9:00 AM 06/25/2018
PW-Main inspection
Informational
06/22/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
06/22/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
06/22/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
06/22/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
06/22/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
06/22/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
06/25/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
Water Line - Coliform Test 1 Partial 6/26/2018 at 10:40 AM 06/26/2018
PW-Misc
Informational
06/26/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
Water Line - Coliform Test 2 Partial 6/27/2018 at 1:00 PM 07/02/2018
PW-Misc
Informational
07/02/2018
We collected and delivered the day 2 samples for the water line A.
Water Line - Coliform Test 1 Failed 7/3/2018 07/02/2018
PW-Misc
Informational
06/26/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/02/2018
The day 1 samples for the water line B and the domestic water line failed.
Water Line - Coliform Test 2 Failed 7/2/2018 07/02/2018
PW-Misc
Informational
07/02/2018
We collected and delivered the day 2 samples for the water line A.
PW-Misc
Informational
07/02/2018
The day 2 samples for the water line A failed.
Water Line - Construction Inspection Partial 7/2/2018 at 11:00 AM 07/02/2018
PW-Main inspection
Informational
06/25/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
06/25/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
06/25/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
06/25/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
06/25/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
06/25/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
06/25/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
PW-Main inspection
Informational
07/02/2018
John DiMauro 07/02/2018 1:29 PM KAT Excavation crews are on site re-chlorinating the water lines preparing for bacteria samples. I verified the chlorine residual on the test strips.
Water Line - Construction Inspection Partial 7/3/2018 at 1:00 PM 07/03/2018
PW-Main inspection
Informational
07/02/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
07/02/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
07/02/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
07/02/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
07/02/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
07/02/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
07/02/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
PW-Main inspection
Informational
07/02/2018
John DiMauro 07/02/2018 1:29 PM KAT Excavation crews are on site re-chlorinating the water lines preparing for bacteria samples. I verified the chlorine residual on the test strips.
PW-Main inspection
Informational
07/03/2018
John DiMauro 07/03/2018 4:02 PM The KAT Excavation crew flushed the water lines to prepare for water samples later this week.
Water Line - Coliform Test 1 Partial 7/5/2018 at 7:30 AM 07/05/2018
PW-Misc
Informational
07/02/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/02/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
07/05/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
Water Line - Coliform Test 1 Partial 7/6/2018 07/06/2018
PW-Misc
Informational
07/05/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/05/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
07/05/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
07/06/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
Water Line - Coliform Test 2 Partial 7/6/2018 at 9:45 AM 07/06/2018
PW-Misc
Informational
07/02/2018
We collected and delivered the day 2 samples for the water line A.
PW-Misc
Informational
07/02/2018
The day 2 samples for the water line A failed.
PW-Misc
Informational
07/06/2018
John DiMauro 07/06/2018 2:16 PM Collected the day 2 samples for water line A and delivered to blue valley labs.
Water Line - Coliform Test 1 Partial 7/10/2018 at 11:00 AM 07/10/2018
PW-Misc
Informational
07/06/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/06/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
07/06/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
07/06/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
07/10/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
Water Line - Coliform Test 1 Partial 7/11/2018 07/11/2018
PW-Misc
Informational
07/10/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/10/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
07/10/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
07/10/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
07/10/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
PW-Misc
Informational
07/11/2018
John DiMauro 07/11/2018 3:49 PM This round of day 1 for the fire line on line B failed. The day 1 line A samples passed.
Water Line - Coliform Test 2 Partial 7/11/2018 at 1:30 PM 07/11/2018
PW-Misc
Informational
07/06/2018
We collected and delivered the day 2 samples for the water line A.
PW-Misc
Informational
07/06/2018
The day 2 samples for the water line A failed.
PW-Misc
Informational
07/06/2018
John DiMauro 07/06/2018 2:16 PM Collected the day 2 samples for water line A and delivered to blue valley labs.
PW-Misc
Informational
07/11/2018
John DiMauro 07/11/2018 3:51 PM We collected this round of day 2 samples for the water line A and delivered them to Blue Valley Labs.
Water Line - Coliform Test 2 Partial 7/17/2018 07/17/2018
PW-Misc
Informational
07/11/2018
We collected and delivered the day 2 samples for the water line A.
PW-Misc
Informational
07/11/2018
The day 2 samples for the water line A failed.
PW-Misc
Informational
07/11/2018
John DiMauro 07/06/2018 2:16 PM Collected the day 2 samples for water line A and delivered to blue valley labs.
PW-Misc
Informational
07/11/2018
John DiMauro 07/11/2018 3:51 PM We collected this round of day 2 samples for the water line A and delivered them to Blue Valley Labs.
PW-Misc
Informational
07/17/2018
John DiMauro 07/17/2018 1:39 PM The day 2 samples for the Water Line A passed.
Water Line - Construction Inspection Partial 7/17/2018 at 1:30 PM 07/17/2018
PW-Main inspection
Informational
07/03/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
07/03/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
07/03/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
07/03/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
07/03/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
07/03/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
07/03/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
PW-Main inspection
Informational
07/03/2018
John DiMauro 07/02/2018 1:29 PM KAT Excavation crews are on site re-chlorinating the water lines preparing for bacteria samples. I verified the chlorine residual on the test strips.
PW-Main inspection
Informational
07/03/2018
John DiMauro 07/03/2018 4:02 PM The KAT Excavation crew flushed the water lines to prepare for water samples later this week.
PW-Main inspection
Informational
07/17/2018
A main inspection has uncovered the following problems.
PW-Main inspection
Informational
07/17/2018
John DiMauro 07/17/2018 2:13 PM The KAT Excavation crew turned fire hydrant 067-081 to the correct position. The fire line along SW Cheddington Dr. has passed bacteria samples and is now in service. The crew is flushing the line along Hollywood drive to prepare for bacteria samples.
Water Line - Coliform Test 1 Partial 7/18/2018 at 12:30 PM 07/18/2018
PW-Misc
Informational
07/11/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/11/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
07/11/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
07/11/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
07/11/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
PW-Misc
Informational
07/11/2018
John DiMauro 07/11/2018 3:49 PM This round of day 1 for the fire line on line B failed. The day 1 line A samples passed.
PW-Misc
Informational
07/18/2018
John DiMauro 07/18/2018 3:19 PM The KAT Excavation crew and I collected the day 1 water samples for the water line B. I Delivered them to Blue Valley Labs.
Water Line - Coliform Test 1 Partial 7/19/2018 07/19/2018
PW-Misc
Informational
07/18/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/18/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
07/18/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
07/18/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
07/18/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
PW-Misc
Informational
07/18/2018
John DiMauro 07/11/2018 3:49 PM This round of day 1 for the fire line on line B failed. The day 1 line A samples passed.
PW-Misc
Informational
07/18/2018
John DiMauro 07/18/2018 3:19 PM The KAT Excavation crew and I collected the day 1 water samples for the water line B. I Delivered them to Blue Valley Labs.
PW-Misc
Informational
07/19/2018
John DiMauro 07/19/2018 3:50 PM The day 1 samples for this round on the water line A passed.
Water Line - Coliform Test 2 Partial 7/19/2018 at 1:30 PM 07/19/2018
PW-Misc
Informational
07/17/2018
We collected and delivered the day 2 samples for the water line A.
PW-Misc
Informational
07/17/2018
The day 2 samples for the water line A failed.
PW-Misc
Informational
07/17/2018
John DiMauro 07/06/2018 2:16 PM Collected the day 2 samples for water line A and delivered to blue valley labs.
PW-Misc
Informational
07/17/2018
John DiMauro 07/11/2018 3:51 PM We collected this round of day 2 samples for the water line A and delivered them to Blue Valley Labs.
PW-Misc
Informational
07/17/2018
John DiMauro 07/17/2018 1:39 PM The day 2 samples for the Water Line A passed.
PW-Misc
Informational
07/19/2018
John DiMauro 07/19/2018 3:51 PM Collected and delivered the day 2 samples for the water line B to Blue Valley Labs.
Water Line - Construction Taps Removed Partial 7/25/2018 at 9:55 AM 07/25/2018
PW-Misc
Informational
07/25/2018
John DiMauro 07/25/2018 11:25 AM Met with The City of LS Water Utilities crew to install construction taps on the water line along Hollywood Dr.
Water Line - Construction Inspection Partial 8/3/2018 at 1:30 PM 08/03/2018
PW-Main inspection
Informational
07/17/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
07/17/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
07/17/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
07/17/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
07/17/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
07/17/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
07/17/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
PW-Main inspection
Informational
07/17/2018
John DiMauro 07/02/2018 1:29 PM KAT Excavation crews are on site re-chlorinating the water lines preparing for bacteria samples. I verified the chlorine residual on the test strips.
PW-Main inspection
Informational
07/17/2018
John DiMauro 07/03/2018 4:02 PM The KAT Excavation crew flushed the water lines to prepare for water samples later this week.
PW-Main inspection
Informational
07/17/2018
A main inspection has uncovered the following problems.
PW-Main inspection
Informational
07/17/2018
John DiMauro 07/17/2018 2:13 PM The KAT Excavation crew turned fire hydrant 067-081 to the correct position. The fire line along SW Cheddington Dr. has passed bacteria samples and is now in service. The crew is flushing the line along Hollywood drive to prepare for bacteria samples.
PW-Main inspection
Informational
08/03/2018
John DiMauro 08/03/2018 3:04 PM KAT Excavation crew chlorinated the water line B yesterday. Today we flushed the line to prepare for water samples on Monday 8/6/18
Water Line - Coliform Test 1 Partial 8/8/2018 at 9:30 AM 08/09/2018
PW-Misc
Informational
07/19/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
07/19/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
07/19/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
07/19/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
07/19/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
PW-Misc
Informational
07/19/2018
John DiMauro 07/11/2018 3:49 PM This round of day 1 for the fire line on line B failed. The day 1 line A samples passed.
PW-Misc
Informational
07/19/2018
John DiMauro 07/18/2018 3:19 PM The KAT Excavation crew and I collected the day 1 water samples for the water line B. I Delivered them to Blue Valley Labs.
PW-Misc
Informational
07/19/2018
John DiMauro 07/19/2018 3:50 PM The day 1 samples for this round on the water line A passed.
PW-Misc
Informational
08/09/2018
On 8/8/18 we collected the day 1 samples for the water line B and delivered them to Blue Valley Labs.
Water Line - Coliform Test 1 Failed 8/13/2018 08/13/2018
PW-Misc
Informational
08/09/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
08/09/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
08/09/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
08/09/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
08/09/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
PW-Misc
Informational
08/09/2018
John DiMauro 07/11/2018 3:49 PM This round of day 1 for the fire line on line B failed. The day 1 line A samples passed.
PW-Misc
Informational
08/09/2018
John DiMauro 07/18/2018 3:19 PM The KAT Excavation crew and I collected the day 1 water samples for the water line B. I Delivered them to Blue Valley Labs.
PW-Misc
Informational
08/09/2018
John DiMauro 07/19/2018 3:50 PM The day 1 samples for this round on the water line A passed.
PW-Misc
Informational
08/09/2018
On 8/8/18 we collected the day 1 samples for the water line B and delivered them to Blue Valley Labs.
PW-Misc
Informational
08/13/2018
John DiMauro 08/13/2018 3:42 PM The Day 1 test results for the Line B Fire line failed for total coliform.
Water Line - Coliform Test 1 Partial 8/15/2018 at 1:00 PM 08/15/2018
PW-Misc
Informational
08/13/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
08/13/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
08/13/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
08/13/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
08/13/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
PW-Misc
Informational
08/13/2018
John DiMauro 07/11/2018 3:49 PM This round of day 1 for the fire line on line B failed. The day 1 line A samples passed.
PW-Misc
Informational
08/13/2018
John DiMauro 07/18/2018 3:19 PM The KAT Excavation crew and I collected the day 1 water samples for the water line B. I Delivered them to Blue Valley Labs.
PW-Misc
Informational
08/13/2018
John DiMauro 07/19/2018 3:50 PM The day 1 samples for this round on the water line A passed.
PW-Misc
Informational
08/13/2018
On 8/8/18 we collected the day 1 samples for the water line B and delivered them to Blue Valley Labs.
PW-Misc
Informational
08/13/2018
John DiMauro 08/13/2018 3:42 PM The Day 1 test results for the Line B Fire line failed for total coliform.
PW-Misc
Informational
08/15/2018
John DiMauro 08/15/2018 3:23 PM Collected line B day 1 water samples and delivered them to Blue Valley Labs.
Water Line - Coliform Test 1 Passed 8/16/2018 08/16/2018
PW-Misc
Informational
08/15/2018
John DiMauro 06/26/2018 4:01 PM The KAT Excavation crew and I collected water samples for the public and private lines on this project. I delivered the samples to Blue Valley Labs and we will know the results for the day 1 samples tomorrow.
PW-Misc
Informational
08/15/2018
The day 1 samples for the water line B and the domestic water line failed.
PW-Misc
Informational
08/15/2018
John DiMauro 07/05/2018 11:11 AM KAT Excavation crew and I collected the day 1 samples for the public water lines A & B. I delivered the samples to Blue Valley Labs for testing. We will know the results tomorrow.
PW-Misc
Informational
08/15/2018
John DiMauro 07/06/2018 2:14 PM The Line B test failed. the line A tests passed.
PW-Misc
Informational
08/15/2018
John DiMauro 07/10/2018 3:05 PM The Line A day 2 tests failed. Today we collected the day 1 samples for the Line's A & B and delivered them to Blue Valley Labs. We will know the results tomorrow.
PW-Misc
Informational
08/15/2018
John DiMauro 07/11/2018 3:49 PM This round of day 1 for the fire line on line B failed. The day 1 line A samples passed.
PW-Misc
Informational
08/15/2018
John DiMauro 07/18/2018 3:19 PM The KAT Excavation crew and I collected the day 1 water samples for the water line B. I Delivered them to Blue Valley Labs.
PW-Misc
Informational
08/15/2018
John DiMauro 07/19/2018 3:50 PM The day 1 samples for this round on the water line A passed.
PW-Misc
Informational
08/15/2018
On 8/8/18 we collected the day 1 samples for the water line B and delivered them to Blue Valley Labs.
PW-Misc
Informational
08/15/2018
John DiMauro 08/13/2018 3:42 PM The Day 1 test results for the Line B Fire line failed for total coliform.
PW-Misc
Informational
08/15/2018
John DiMauro 08/15/2018 3:23 PM Collected line B day 1 water samples and delivered them to Blue Valley Labs.
Water Line - Coliform Test 2 Partial 8/16/2018 at 1:00 PM 08/16/2018
PW-Misc
Informational
07/19/2018
We collected and delivered the day 2 samples for the water line A.
PW-Misc
Informational
07/19/2018
The day 2 samples for the water line A failed.
PW-Misc
Informational
07/19/2018
John DiMauro 07/06/2018 2:16 PM Collected the day 2 samples for water line A and delivered to blue valley labs.
PW-Misc
Informational
07/19/2018
John DiMauro 07/11/2018 3:51 PM We collected this round of day 2 samples for the water line A and delivered them to Blue Valley Labs.
PW-Misc
Informational
07/19/2018
John DiMauro 07/17/2018 1:39 PM The day 2 samples for the Water Line A passed.
PW-Misc
Informational
07/19/2018
John DiMauro 07/19/2018 3:51 PM Collected and delivered the day 2 samples for the water line B to Blue Valley Labs.
PW-Misc
Informational
08/16/2018
John DiMauro 08/16/2018 4:04 PM We collected the day 2 samples for the water line B and delivered them to Blue Valley Labs.
Water Line - Construction Inspection Partial 8/31/2018 at 10:45 AM 08/31/2018
PW-Main inspection
Informational
08/03/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
08/03/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
08/03/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
08/03/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
08/03/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
08/03/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
08/03/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
PW-Main inspection
Informational
08/03/2018
John DiMauro 07/02/2018 1:29 PM KAT Excavation crews are on site re-chlorinating the water lines preparing for bacteria samples. I verified the chlorine residual on the test strips.
PW-Main inspection
Informational
08/03/2018
John DiMauro 07/03/2018 4:02 PM The KAT Excavation crew flushed the water lines to prepare for water samples later this week.
PW-Main inspection
Informational
08/03/2018
A main inspection has uncovered the following problems.
PW-Main inspection
Informational
08/03/2018
John DiMauro 07/17/2018 2:13 PM The KAT Excavation crew turned fire hydrant 067-081 to the correct position. The fire line along SW Cheddington Dr. has passed bacteria samples and is now in service. The crew is flushing the line along Hollywood drive to prepare for bacteria samples.
PW-Main inspection
Informational
08/03/2018
John DiMauro 08/03/2018 3:04 PM KAT Excavation crew chlorinated the water line B yesterday. Today we flushed the line to prepare for water samples on Monday 8/6/18
Informational
08/31/2018
John DiMauro 08/31/2018 1:20 PM The KAT Excavation crew was on site to chlorinate the water line B. We verified the correct chlorine amount in the pipe.
Water Line - Construction Inspection Partial 9/4/2018 at 10:15 AM 09/04/2018
PW-Main inspection
Informational
08/31/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
08/31/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
08/31/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
08/31/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
08/31/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
08/31/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
08/31/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
PW-Main inspection
Informational
08/31/2018
John DiMauro 07/02/2018 1:29 PM KAT Excavation crews are on site re-chlorinating the water lines preparing for bacteria samples. I verified the chlorine residual on the test strips.
PW-Main inspection
Informational
08/31/2018
John DiMauro 07/03/2018 4:02 PM The KAT Excavation crew flushed the water lines to prepare for water samples later this week.
PW-Main inspection
Informational
08/31/2018
A main inspection has uncovered the following problems.
PW-Main inspection
Informational
08/31/2018
John DiMauro 07/17/2018 2:13 PM The KAT Excavation crew turned fire hydrant 067-081 to the correct position. The fire line along SW Cheddington Dr. has passed bacteria samples and is now in service. The crew is flushing the line along Hollywood drive to prepare for bacteria samples.
PW-Main inspection
Informational
09/04/2018
John DiMauro 09/04/2018 3:39 PM Joe Starlin and I met with KAT Excavation to flush the water line B. KAT dechlorinated the line and performed a high velocity flush for approximately 2 hours. We will take the first round of samples for the line to the lab tomorrow.
Water Line - Coliform Test 1 Failed 9/5/2018 at 11:30 AM 09/11/2018
PW-Misc
Informational
09/05/2018
John DiMauro 09/05/2018 3:37 PM We collected the day 1 water samples for the water line B and delivered them to Blue Valley Labs. We will know the results tomorrow.
Water Line - Coliform Test 1 Failed 9/11/2018 at 11:30 AM 09/27/2018
PW-Misc
Informational
09/11/2018
John DiMauro 09/11/2018 3:09 PM The last set of samples failed for total coliform. The KAT Excavation crew performed a hydrostatic pressure test on water line B yesterday. The hydro test passed so the crew performed a high velocity flush of the line for two hours. Today we collected samples and delivered them to the lab for testing. We will know the results tomorrow.
Water Line - Coliform Test 1 Partial 9/26/2018 at 1:00 PM 09/27/2018
PW-Misc
Informational
09/27/2018
John DiMauro 09/27/2018 8:07 AM The last set of samples taken failed. We collected another set of samples yesterday for line B and delivered them to Blue Valley Labs.
Water Line - Coliform Test 1 Passed 12/12/2018 at 10:30 AM 12/14/2018
Misc
Informational
12/14/2018
We collected the Day 1 water samples for the water line B along Hollywood Dr. The Day 1 Samples passed.
Water Line - Coliform Test 2 Passed 12/13/2018 at 2:40 PM 12/18/2018
Misc
Informational
12/14/2018
We collected the day 2 samples for the water line B along Hollywood Dr. We will know the results friday afternoon 12/14/2018
Water Line - Coliform Test 1 Passed 12/18/2018
Misc
Informational
12/18/2018
John DiMauro 12/18/2018 1:04 PM This round of day 1 & day 2 samples for water line B were collected and delivered to Keystone Lab on 12/12/2018 & 12/13/2018. Both day1 and day 2 samples passed the bacteria testing. Water line B was put in service.
Water Line - Coliform Test 2 Passed 12/18/2018
PW-Misc
Informational
08/16/2018
We collected and delivered the day 2 samples for the water line A.
PW-Misc
Informational
08/16/2018
The day 2 samples for the water line A failed.
PW-Misc
Informational
08/16/2018
John DiMauro 07/06/2018 2:16 PM Collected the day 2 samples for water line A and delivered to blue valley labs.
PW-Misc
Informational
08/16/2018
John DiMauro 07/11/2018 3:51 PM We collected this round of day 2 samples for the water line A and delivered them to Blue Valley Labs.
PW-Misc
Informational
08/16/2018
John DiMauro 07/17/2018 1:39 PM The day 2 samples for the Water Line A passed.
PW-Misc
Informational
08/16/2018
John DiMauro 07/19/2018 3:51 PM Collected and delivered the day 2 samples for the water line B to Blue Valley Labs.
PW-Misc
Informational
08/16/2018
John DiMauro 08/16/2018 4:04 PM We collected the day 2 samples for the water line B and delivered them to Blue Valley Labs.
Water Line - Coliform Test 1 Passed 12/18/2018
PW-Misc
Informational
09/11/2018
John DiMauro 09/11/2018 3:09 PM The last set of samples failed for total coliform. The KAT Excavation crew performed a hydrostatic pressure test on water line B yesterday. The hydro test passed so the crew performed a high velocity flush of the line for two hours. Today we collected samples and delivered them to the lab for testing. We will know the results tomorrow.
Erosion Control Inspection Passed 01/11/2021
Water - Material Verification Passed 01/11/2021
Water Line - Construction Taps Removed Passed 01/11/2021
PW-Misc
Informational
07/25/2018
John DiMauro 07/25/2018 11:25 AM Met with The City of LS Water Utilities crew to install construction taps on the water line along Hollywood Dr.
Water Line - Construction Inspection Passed 01/11/2021
PW-Main inspection
Informational
09/04/2018
Matt Munger 04/26/2018 9:29 AM I spoke with TJ on site about the water portion of the project. He had asked about the valves that we were specified needed to be installed. There was an issue with the plans not showing there being valves before the dead end water mains I when I had asked TJ on a prior visit whether he would install them or not he stated if there was an additional cost he was not sure about that. I then went back to the Design and Criteria Manual and looked up the specifications in section 6900 and it clearly states there needs to be an in-line valve before the hydrant on a dead end water main. I have sent TJ the sections in the D&C that specifies what is required on dead end water mains.
PW-Main inspection
Informational
09/04/2018
Matt Munger 05/03/2018 9:37 AM I spoke with TJ about the water portion of the project. I informed him he will need to notify the customers affected 24 hours in advance. I stopped in and spoke with the Asst. Manager of the bank and asked if there was any issue with doing the shutdown during there hours and she stated to just let them know in advance. I contacted Evan from Water to see if he could send someone out to see about locating a valve at the end of the line.
PW-Main inspection
Informational
09/04/2018
John DiMauro 06/05/2018 3:13 PM Meeting with TJ and the Kat Excavation crew to go over the plan for the water line install. The crew has the water line pipe laid out and plans to start installing tomorrow.
PW-Main inspection
Informational
09/04/2018
John DiMauro 06/14/2018 4:01 PM Kat Excavation is continuing the private water line install. The construction appears to match the plans. KC Testing is on site doing compaction testing for the water lines.
PW-Main inspection
Informational
09/04/2018
6/18/2018 The KAT Excavation crew was on site installing the private domestic water lines.
PW-Main inspection
Informational
09/04/2018
John DiMauro 06/22/2018 2:42 PM The hydrostatic pressure tests for all the public and private water lines on this project have passed. The KAT Excavation crew is chlorinated the public and private water lines. We will flush Monday and take bacteria samples the following day.
PW-Main inspection
Informational
09/04/2018
Jeremy Young 06/25/2018 3:18 PM Crew was on site to flush the 2 lines. We flushed the west side public line for 20 min. The chlorine readings all the way through the line was less than 10 ppm. We flushed the east side public and private lines. They were flushed for approximately 40 mins. The chlorine levels were less than 10 ppm throughout the line and in the private lines also.
PW-Main inspection
Informational
09/04/2018
John DiMauro 07/02/2018 1:29 PM KAT Excavation crews are on site re-chlorinating the water lines preparing for bacteria samples. I verified the chlorine residual on the test strips.
PW-Main inspection
Informational
09/04/2018
John DiMauro 07/03/2018 4:02 PM The KAT Excavation crew flushed the water lines to prepare for water samples later this week.
PW-Main inspection
Informational
09/04/2018
A main inspection has uncovered the following problems.
PW-Main inspection
Informational
09/04/2018
John DiMauro 07/17/2018 2:13 PM The KAT Excavation crew turned fire hydrant 067-081 to the correct position. The fire line along SW Cheddington Dr. has passed bacteria samples and is now in service. The crew is flushing the line along Hollywood drive to prepare for bacteria samples.
PW-Main inspection
Informational
09/04/2018
John DiMauro 09/04/2018 3:39 PM Joe Starlin and I met with KAT Excavation to flush the water line B. KAT dechlorinated the line and performed a high velocity flush for approximately 2 hours. We will take the first round of samples for the line to the lab tomorrow.
Water Line - Hydrostatic Test Passed 01/11/2021
Water Line - Coliform Test 1 Passed 01/11/2021
Record Drawing Review Passed 2/19/2021 03/12/2021
Documents & Images
Date Uploaded File Type Document Name
11/21/2017 Receipt Receipt for transaction: 2017-007368
04/02/2018 Letter DE-Daily Inspection Summary
04/09/2018 Letter DE-Site Visit Inspection
04/12/2018 Letter DE-Daily Inspection Summary
04/12/2018 Letter DE-Daily Inspection Summary
04/26/2018 Letter DE-Daily Inspection Summary
04/30/2018 Letter DE-Daily Inspection Summary
05/03/2018 Letter DE-Daily Inspection Summary
06/05/2018 Letter DE-Daily Inspection Summary
06/14/2018 Letter DE-Daily Inspection Summary
06/18/2018 Letter DE-Daily Inspection Summary
06/20/2018 Letter DE-Daily Inspection Summary
06/20/2018 Letter DE-Daily Inspection Summary
06/21/2018 Letter DE-Daily Inspection Summary
06/22/2018 Letter DE-Daily Inspection Summary
06/22/2018 Letter DE-Daily Inspection Summary
06/25/2018 Letter DE-Daily Inspection Summary
06/26/2018 Letter DE-Daily Inspection Summary
07/02/2018 Letter DE-Daily Inspection Summary
07/02/2018 Letter DE-Daily Inspection Summary
07/03/2018 Letter DE-Daily Inspection Summary
07/06/2018 Letter DE-Daily Inspection Summary
07/10/2018 Letter DE-Daily Inspection Summary
07/11/2018 Letter DE-Daily Inspection Summary
07/17/2018 Letter DE-Daily Inspection Summary
07/18/2018 Letter DE-Daily Inspection Summary
07/19/2018 Letter DE-Daily Inspection Summary
07/25/2018 Letter DE-Daily Inspection Summary
08/03/2018 Letter DE-Daily Inspection Summary
08/09/2018 Letter DE-Daily Inspection Summary
08/13/2018 Letter DE-Daily Inspection Summary
08/15/2018 Letter DE-Daily Inspection Summary
08/16/2018 Letter DE-Daily Inspection Summary
08/31/2018 Letter DE-Daily Inspection Summary
09/04/2018 Letter DE-Daily Inspection Summary
09/05/2018 Letter DE-Daily Inspection Summary
09/11/2018 Letter DE-Daily Inspection Summary
09/27/2018 Letter DE-Daily Inspection Summary
12/14/2018 Letter DE-Daily Inspection Summary
12/18/2018 Letter DE-Daily Inspection Summary
07/31/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
08/01/2019 Letter DE-Punch List
08/12/2019 Reisdences at Echelon Signed Cert of Partial Substantail Completion Site Permit
01/11/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
01/11/2021 Substantial Completion for Residences at Echelon Public Water Line
01/11/2021 Letter DE-Punch List
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
02/16/2021 WATER ASBUILTS
03/12/2021 Letter INSPECTION SUMMARY
07/13/2021 MAINT. BOND - RESIDENCES AT ECHELON - WATER
09/07/2021 Affidavit - rev 07-2015 (GRPG)
09/15/2021 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home