Permit Application Status

PRPWFC20162080


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRPWFC20162080
Public Works Infrastructure Permit - Commercial
Final Acceptance
RED LEES SUMMIT EAST LLC
DEVELOPMENT COMPLETE
SUMMIT FAIR PAD 5 - DICKS SITEWORK
08/18/2016
08/23/2016
06/13/2018
Locations
Contacts
RED LEES SUMMIT EAST LLC, Address:1 E WASHINGTON ST STE 300  
SUPERIOR BOWEN CONST LLC, Address:520 W PENNWAY ST STE 300, Phone:(816) 921-8200  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/18/2016 08/23/2016
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $1,051.48 $1,051.48 Paid 08/18/2016
91100C9-Water Insp Fee $366.01 $366.01 Paid 08/18/2016
9110072-Water Test Fee $400.00 $400.00 Paid 08/18/2016
9110068-Storm Fee $4,460.93 $4,460.93 Paid 08/18/2016
9110081-Paved Surface Inspection Fee $20,702.43 $20,702.43 Paid 08/18/2016
9110071-Site Grading Fee $4,781.44 $4,781.44 Paid 08/18/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Fire Line - Hydrostatic Test Passed 12/02/2016
Storm - Pipe Passed 12/02/2016
Water Line - Construction Inspection Passed 12/02/2016
Water Line - Thrust Restraint Passed 12/02/2016
Water Line - Hydrostatic Test Passed 12/02/2016
Erosion Control Inspection Passed 04/05/2017
Sanitary Sewer Construction Inspection Passed 04/05/2017
Sanitary Sewer - Air Test Passed 04/05/2017
Sanitary Sewer - Mandrel Passed 04/05/2017
Sanitary Sewer - Vacuum Passed 04/05/2017
Sanitary Sewer - Invert Passed 04/05/2017
Grading/Excavation/Fill Inspection Passed 04/05/2017
Water Line - Valve Passed 04/05/2017
Water Line - Fire Hydrant Passed 04/05/2017
Water Line - Construction Taps Removed Passed 04/05/2017
Proof roll parking lot Passed 04/05/2017
Storm - Inlets Clean Passed 04/05/2017
Install Street and Stop Signs Passed 04/05/2017
Street - Surface Course Passed 04/05/2017
Street - Wedge Lift Passed 04/05/2017
Pavement-Surface Passed 04/05/2017
Sanitary Sewer Construction Inspection Partial 3/1/2018 03/02/2018
Corrective Action Required
03/02/2018
Redford Construction has begun the replacement of the doghouse manhole that was installed without City approval. The new materials meet city specs.
Sanitary Sewer Construction Inspection Partial 3/1/2018 03/07/2018
Corrective Action Required
03/07/2018
Redford construction was onsite at 7am Thursday March 1st to begin the replacement of the doghouse manhole that was installed without City approval. The manhole was excavated and materials arrived onsite. On Friday March 2nd a pump around operation was set up and the doghouse manhole was removed. After the manhole was removed it was determined by Redford Construction that the inflow and outflow piped were only 1.5 inches horizontaly offset over the 22' run that was removed. An Idea was proposed to eliminate the manhole because of the small offset and the flat grade of the pipe. This change was approved by Lee's Summit Development Engeneering, Public Works Engeneering, and Water Operations. A 12" layer od compacted gravel was layed under the pipe. The pipe was then attahed on both ends with stainless steel backed Fernco couplings. The pipe was then properly bedded with compacted gravel to a level 12" above the top of pipe. The remainder of the hole was filled with 6" compacted lifts of Type5 AB3. An 8" layer of concrete was placed with a 2" asphalt surface cap. A mandrel was pulled through the repair. The mandrel would not pass through the existing downstream section of pipe. The water department will video the line after the thirty day settling period has passed.
Sanitary Sewer Construction Inspection Passed 4/6/2018 04/06/2018
Record Drawing Review Partial 04/06/2018
Corrective Action Required
04/06/2018
As Built has been submitted but needs revisions.
Record Drawing Review Passed 06/13/2018
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home