PRPWFC20161367
Public Works Infrastructure Permit - Commercial
Issued
JOHN KNOX VILLAGE
DEVELOPMENT COMPLETE
Relocation of public sanitary main. (Sanitary Sewer Line 1 and 3)
06/09/2016
06/21/2016
Locations
Contacts
PARIC CORPORATION , Address:77 WESTORT PLAZA STE 250, Phone:(636) 561-9795  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/09/2016 06/09/2016
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $2,788.27 $2,788.27 Paid 06/09/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Fire Line - Hydrostatic Test Passed 7/25/2016 07/26/2016
PW-Misc
Informational
07/26/2016
On 7/25/16 the hydrostatic pressure test was completed. we also flushed the line and and chlorinated the water line. Steve Robbins 07/26/2016 3:49 PM
Fire Line - Flush Passed 7/26/2016 07/26/2016
PW-Misc
Informational
07/26/2016
The water line was flushed out and de-chlorinated today and will be ready for the first sample in the morning.
Water Line - Coliform Test 1 Passed 7/28/2016 07/28/2016
PW-Water Sample Results
Informational
07/27/2016
Today I took the first samples for the water line down to the lab. The line has been flushed , chlorinated and dechlorinated. Steve Robbins 07/27/2016 4:39 PM
PW-Water Sample Results
Informational
07/28/2016
Sample 1 of the coliform test passed today. I took the second sample down to the lab. Steve Robbins 07/28/2016 4:15 PM
Sanitary Sewer Construction Inspection Partial 7/29/2016 08/01/2016
PW-Misc
Informational
08/01/2016
MH on ss line 3 was installed and is flowing , 952.00. Steve Robbins 08/01/2016 2:39 PM
Water Line - Coliform Test 2 Failed 8/4/2016 08/05/2016
PW-Water Sample Results
Informational
08/03/2016
Steve Robbins 07/28/2016 4:18 PMI took the second sample to the lab today. The first sample passed.
PW-Water Sample Results
Informational
08/03/2016
Water Samples have failed. The second water sample taken on 7/28 failed. On 7/29 the water line was flushed and chlorinated again.l Today on 8/1 we flushed and dechlorinated the water line.. waiting for tomorrow to take another sample. Steve Robbins 08/01/2016 2:05 PM
PW-Water Sample Results
Informational
08/03/2016
This morning I took the first sample of the second round of tests to the labSteve Robbins 08/02/2016 11:56 AM
PW-Water Sample Results
Informational
08/03/2016
The first water sample passed and I took the second sample this morning.Steve Robbins 08/03/2016 4:18 PM
PW-Water Sample Results
Informational
08/05/2016
Water Samples have failed. The water samples taken on august 3 failed. I was notified august 4. The water line is now flushed , chlorinated and will be ready for the first sample on monday 8-8 . Jon Haley will take the sample for me.Steve Robbins 08/05/2016 3:22 PM
Water Line - Coliform Test 2 Passed 8/10/2016 08/10/2016
PW-Water Sample Results
Informational
08/09/2016
Steve Robbins 07/28/2016 4:18 PMI took the second sample to the lab today. The first sample passed.
PW-Water Sample Results
Informational
08/09/2016
Water Samples have failed. The second water sample taken on 7/28 failed. On 7/29 the water line was flushed and chlorinated again.l Today on 8/1 we flushed and dechlorinated the water line.. waiting for tomorrow to take another sample. Steve Robbins 08/01/2016 2:05 PM
PW-Water Sample Results
Informational
08/09/2016
This morning I took the first sample of the second round of tests to the labSteve Robbins 08/02/2016 11:56 AM
PW-Water Sample Results
Informational
08/09/2016
The first water sample passed and I took the second sample this morning.Steve Robbins 08/03/2016 4:18 PM
PW-Water Sample Results
Informational
08/09/2016
Water Samples have failed. The water samples taken on august 3 failed. I was notified august 4. The water line is now flushed , chlorinated and will be ready for the first sample on monday 8-8 . Jon Haley will take the sample for me.Steve Robbins 08/05/2016 3:22 PM
PW-Water Sample Results
Informational
08/09/2016
John Haley took the first sample of the 3rd rd of samples on monday 8/8/16, Those samples passed on 8/9 and I took the second day of samples to the lab today.Steve Robbins 08/09/2016 3:45 PM
PW-Water Sample Results
Resolved
08/10/2016
Water samples passed. Steve Robbins 08/10/2016 4:00 PM
Sanitary Sewer - Air Test Partial 9/9/2016 09/09/2016
PW-Misc
Informational
09/09/2016
Mandrel tests for B-1 to A-1 , A-1 to A-2, and A-2 to A-3 have passed A-2 to A-3 are preliminary tests and have to be done again in 30 days.Steve Robbins 09/09/2016 1:42 PM
Sanitary Sewer - Invert Passed 12/02/2016
Sanitary Sewer Construction Inspection Passed 9/7/2016 12/02/2016
PW-Misc
Informational
09/08/2016
MH A-3 was installed and was put into service. We did preliminary pressure test and mandrel test that passed. This was approved by Jeff Thorn on the agreement that it will be tested again after 30 days. Steve Robbins 09/08/2016 3:55 PM This was completed on sept 7.
Water Line - Fire Hydrant Passed 7/11/2016 12/02/2016
PW-Misc
Informational
07/11/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
Water Line - Fire Hydrant Passed 7/12/2016 12/02/2016
PW-Misc
Informational
07/11/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
PW-Misc
Informational
07/13/2016
No work was done yesterday because of rain and no issues with erosion control.
Water Line - Fire Hydrant Passed 7/13/2016 12/02/2016
PW-Misc
Informational
07/13/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
PW-Misc
Informational
07/13/2016
No work was done yesterday because of rain and no issues with erosion control.
Water Line - Fire Hydrant Passed 7/14/2016 12/02/2016
PW-Misc
Informational
07/13/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
PW-Misc
Informational
07/13/2016
No work was done yesterday because of rain and no issues with erosion control.
PW-Misc
Informational
07/14/2016
Today they hit the service water line going into the Lakeside Grille, the water was off for about 1.5 hrs and now is repaired and water is restored to service. After that they continued installing water line pipeSteve Robbins 07/14/2016 4:18 PM
Water Line - Fire Hydrant Passed 7/15/2016 12/02/2016
PW-Misc
Informational
07/14/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
PW-Misc
Informational
07/19/2016
Today they put in more water line , they poured the thrust block for 2 fSteve Robbins 07/19/2016 4:28 PMire hydrants and a tee.
PW-Misc
Informational
07/14/2016
No work was done yesterday because of rain and no issues with erosion control.
PW-Misc
Informational
07/14/2016
Today they hit the service water line going into the Lakeside Grille, the water was off for about 1.5 hrs and now is repaired and water is restored to service. After that they continued installing water line pipeSteve Robbins 07/14/2016 4:18 PM
Water Line - Fire Hydrant Passed 7/20/2016 12/02/2016
PW-Misc
Informational
07/19/2016
Today they put in more water line , they poured the thrust block for 2 fSteve Robbins 07/19/2016 4:28 PMire hydrants and a tee.
PW-Misc
Informational
07/20/2016
Poured the kickers for the 2 fire hydrands on shamrock dr.Steve Robbins 07/20/2016 3:14 PM
PW-Misc
Informational
07/19/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
PW-Misc
Informational
07/19/2016
No work was done yesterday because of rain and no issues with erosion control.
PW-Misc
Informational
07/19/2016
Today they hit the service water line going into the Lakeside Grille, the water was off for about 1.5 hrs and now is repaired and water is restored to service. After that they continued installing water line pipeSteve Robbins 07/14/2016 4:18 PM
Water Line - Fire Hydrant Passed 7/21/2016 12/02/2016
PW-Misc
Informational
07/20/2016
Poured the kickers for the 2 fire hydrands on shamrock dr.Steve Robbins 07/20/2016 3:14 PM
PW-Misc
Informational
07/20/2016
Today they put in more water line , they poured the thrust block for 2 fSteve Robbins 07/19/2016 4:28 PMire hydrants and a tee.
PW-Misc
Informational
07/20/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
PW-Misc
Informational
07/20/2016
No work was done yesterday because of rain and no issues with erosion control.
PW-Misc
Informational
07/20/2016
Today they hit the service water line going into the Lakeside Grille, the water was off for about 1.5 hrs and now is repaired and water is restored to service. After that they continued installing water line pipeSteve Robbins 07/14/2016 4:18 PM
Informational
07/22/2016
Attempted to do the hydrostatic pressure test, but they were having a leak. They seem to have found it at the end of the day. Will try again first thing monday morning.Steve Robbins 07/22/2016 4:31 PM
Water Line - Fire Hydrant Passed 7/25/2016 12/02/2016
PW-Misc
Informational
07/22/2016
Poured the kickers for the 2 fire hydrands on shamrock dr.Steve Robbins 07/20/2016 3:14 PM
PW-Misc
Informational
07/22/2016
Today they put in more water line , they poured the thrust block for 2 fSteve Robbins 07/19/2016 4:28 PMire hydrants and a tee.
PW-Misc
Informational
07/22/2016
Continued installation of the new water main going south on shamrock. Tracer wire and water line tape are being installed as they go.Steve Robbins 07/11/2016 4:23 PM
PW-Misc
Informational
07/22/2016
No work was done yesterday because of rain and no issues with erosion control.
Water Line - Coliform Test 1 Passed 7/27/2016 12/02/2016
PW-Water Sample Results
Informational
07/27/2016
Today I took the first samples for the water line down to the lab. The line has been flushed , chlorinated and dechlorinated. Steve Robbins 07/27/2016 4:39 PM
Water Line - Coliform Test 2 Passed 7/28/2016 12/02/2016
PW-Water Sample Results
Informational
07/28/2016
Steve Robbins 07/28/2016 4:18 PMI took the second sample to the lab today. The first sample passed.
Sanitary Sewer Construction Inspection Passed 9/9/2016 12/02/2016
PW-Misc
Informational
09/14/2016
Today MH C-1 was installed and they are working on a couple pieces of pipe, it is muddy and they hit alot of rock. Steve Robbins 09/14/2016 2:18 PM
Sanitary Sewer - Mandrel Passed 10/11/2016 12/02/2016
PW-Misc
Informational
09/09/2016
Today they did not get any water line in , they hit a lot of rock and they it rained alot.Steve Robbins 07/13/2016 4:03 PM
Sanitary Sewer - Air Test Passed 9/20/2016 12/02/2016
PW-Misc
Informational
09/09/2016
Mandrel tests for B-1 to A-1 , A-1 to A-2, and A-2 to A-3 have passed A-2 to A-3 are preliminary tests and have to be done again in 30 days.Steve Robbins 09/09/2016 1:42 PM
Sanitary Sewer - Vacuum Passed 10/11/2016 12/02/2016
PW-Misc
Informational
09/09/2016
MH b-1 , a-1 , a-2, have passed the vacuum test, a-3 still needs to be tested. Steve Robbins 09/09/2016 2:16 PM
Sanitary Sewer Construction Inspection Passed 9/16/2016 12/02/2016
PW-Misc
Informational
09/14/2016
Today MH C-1 was installed and they are working on a couple pieces of pipe, it is muddy and they hit alot of rock. Steve Robbins 09/14/2016 2:18 PM
PW-Misc
Informational
09/22/2016
MH c-1 was intalled on 9/14/16 and MH c-2 was installed on 9/19/16. they are laying pipe toward existing MH c-3 but are hitting alot of rock. Steve Robbins 09/22/2016 4:15 PM
Sanitary Sewer - Mandrel Passed 10/11/2016 01/17/2017
PW-Misc
Informational
09/09/2016
Today they did not get any water line in , they hit a lot of rock and they it rained alot.Steve Robbins 07/13/2016 4:03 PM
PW-Misc
Informational
09/09/2016
The mandrel tests from b-1 to a-1, a-1 to a-2, have passed, also a-2 to a-3 passed a preliminary test but will have to be done again in 30 days due to special circumstances. Steve Robbins 09/09/2016 1:55 PM
PW-Misc
Informational
09/09/2016
The pressure tests has been completed from b-1 to a-1, a-1 to a-2 and a-2 to a-3. Steve Robbins 09/09/2016 1:59 PM
Water Line - Coliform Test 2 Passed 7/29/2016 02/13/2017
PW-Water Sample Results
Informational
07/28/2016
Steve Robbins 07/28/2016 4:18 PMI took the second sample to the lab today. The first sample passed.
PW-Water Sample Results
Informational
08/01/2016
Water Samples have failed. The second water sample taken on 7/28 failed. On 7/29 the water line was flushed and chlorinated again.l Today on 8/1 we flushed and dechlorinated the water line.. waiting for tomorrow to take another sample. Steve Robbins 08/01/2016 2:05 PM
Water Line - Coliform Test 2 Passed 8/2/2016 02/13/2017
PW-Water Sample Results
Informational
08/01/2016
Steve Robbins 07/28/2016 4:18 PMI took the second sample to the lab today. The first sample passed.
PW-Water Sample Results
Informational
08/01/2016
Water Samples have failed. The second water sample taken on 7/28 failed. On 7/29 the water line was flushed and chlorinated again.l Today on 8/1 we flushed and dechlorinated the water line.. waiting for tomorrow to take another sample. Steve Robbins 08/01/2016 2:05 PM
PW-Water Sample Results
Informational
08/02/2016
This morning I took the first sample of the second round of tests to the labSteve Robbins 08/02/2016 11:56 AM
Sanitary Sewer Construction Inspection Passed 8/3/2016 02/13/2017
Water Line - Coliform Test 2 Passed 8/3/2016 02/13/2017
PW-Water Sample Results
Informational
08/02/2016
Steve Robbins 07/28/2016 4:18 PMI took the second sample to the lab today. The first sample passed.
PW-Water Sample Results
Informational
08/02/2016
Water Samples have failed. The second water sample taken on 7/28 failed. On 7/29 the water line was flushed and chlorinated again.l Today on 8/1 we flushed and dechlorinated the water line.. waiting for tomorrow to take another sample. Steve Robbins 08/01/2016 2:05 PM
PW-Water Sample Results
Informational
08/02/2016
This morning I took the first sample of the second round of tests to the labSteve Robbins 08/02/2016 11:56 AM
PW-Water Sample Results
Informational
08/03/2016
The first water sample passed and I took the second sample this morning.Steve Robbins 08/03/2016 4:18 PM
Water Line - Coliform Test 2 Passed 8/9/2016 02/13/2017
PW-Water Sample Results
Informational
08/05/2016
Steve Robbins 07/28/2016 4:18 PMI took the second sample to the lab today. The first sample passed.
PW-Water Sample Results
Informational
08/05/2016
Water Samples have failed. The second water sample taken on 7/28 failed. On 7/29 the water line was flushed and chlorinated again.l Today on 8/1 we flushed and dechlorinated the water line.. waiting for tomorrow to take another sample. Steve Robbins 08/01/2016 2:05 PM
PW-Water Sample Results
Informational
08/05/2016
This morning I took the first sample of the second round of tests to the labSteve Robbins 08/02/2016 11:56 AM
PW-Water Sample Results
Informational
08/05/2016
The first water sample passed and I took the second sample this morning.Steve Robbins 08/03/2016 4:18 PM
PW-Water Sample Results
Informational
08/05/2016
Water Samples have failed. The water samples taken on august 3 failed. I was notified august 4. The water line is now flushed , chlorinated and will be ready for the first sample on monday 8-8 . Jon Haley will take the sample for me.Steve Robbins 08/05/2016 3:22 PM
PW-Water Sample Results
Informational
08/09/2016
John Haley took the first sample of the 3rd rd of samples on monday 8/8/16, Those samples passed on 8/9 and I took the second day of samples to the lab today.Steve Robbins 08/09/2016 3:45 PM
Sanitary Sewer - Mandrel Passed 9/9/2016 02/13/2017
PW-Misc
Informational
09/09/2016
Today they did not get any water line in , they hit a lot of rock and they it rained alot.Steve Robbins 07/13/2016 4:03 PM
PW-Misc
Informational
09/09/2016
The mandrel tests from b-1 to a-1, a-1 to a-2, have passed, also a-2 to a-3 passed a preliminary test but will have to be done again in 30 days due to special circumstances. Steve Robbins 09/09/2016 1:55 PM
PW-Misc
Informational
09/09/2016
The pressure tests has been completed from b-1 to a-1, a-1 to a-2 and a-2 to a-3. Steve Robbins 09/09/2016 1:59 PM
Sanitary Sewer Construction Inspection Passed 9/27/2016 02/13/2017
PW-Misc
Informational
09/22/2016
Today MH C-1 was installed and they are working on a couple pieces of pipe, it is muddy and they hit alot of rock. Steve Robbins 09/14/2016 2:18 PM
PW-Misc
Informational
09/22/2016
MH c-1 was intalled on 9/14/16 and MH c-2 was installed on 9/19/16. they are laying pipe toward existing MH c-3 but are hitting alot of rock. Steve Robbins 09/22/2016 4:15 PM
Sanitary Sewer Construction Inspection Passed 02/13/2017
PW-Misc
Informational
01/17/2017
Today MH C-1 was installed and they are working on a couple pieces of pipe, it is muddy and they hit alot of rock. Steve Robbins 09/14/2016 2:18 PM
PW-Misc
Informational
01/17/2017
MH c-1 was intalled on 9/14/16 and MH c-2 was installed on 9/19/16. they are laying pipe toward existing MH c-3 but are hitting alot of rock. Steve Robbins 09/22/2016 4:15 PM
Sanitary Sewer - Mandrel Passed 9/9/2016 02/13/2017
PW-Misc
Informational
07/13/2016
Today they did not get any water line in , they hit a lot of rock and they it rained alot.Steve Robbins 07/13/2016 4:03 PM
PW-Misc
Informational
09/09/2016
The mandrel tests from b-1 to a-1, a-1 to a-2, have passed, also a-2 to a-3 passed a preliminary test but will have to be done again in 30 days due to special circumstances. Steve Robbins 09/09/2016 1:55 PM
Sanitary Sewer - Vacuum Passed 02/13/2017
PW-Misc
Informational
09/09/2016
MH b-1 , a-1 , a-2, have passed the vacuum test, a-3 still needs to be tested. Steve Robbins 09/09/2016 2:16 PM
Driveway Inspection Passed 2/13/2017 02/13/2017
Pavement-Stabilized Subgrade Partial 5/11/2017 05/11/2017
PW-Misc
Informational
04/12/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/11/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
Sidewalk Inspection Partial 5/8/2017 05/12/2017
PW-Misc
Informational
04/12/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/08/2017
I talked to the contractor, Shaw, they have tore out the public sidewalk on O"brien and are getting ready to form it. It also has a few ADA ramps.Steve Robbins 05/08/2017 3:11 PM
PW-Misc
Informational
05/11/2017
The sidewalk on O;brien and moore st. has been formed and compacted with rock and ADA ramp formed.Steve Robbins 05/11/2017 2:28 PM
Pavement-Stabilized Subgrade Partial 5/12/2017 05/15/2017
PW-Misc
Informational
05/11/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/15/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
05/11/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
Pavement-Stabilized Subgrade Partial 5/16/2017 05/17/2017
PW-Misc
Informational
05/15/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
05/15/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/15/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
05/17/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
Sidewalk Inspection Passed 5/18/2017 05/18/2017
PW-Misc
Informational
05/12/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/12/2017
I talked to the contractor, Shaw, they have tore out the public sidewalk on O"brien and are getting ready to form it. It also has a few ADA ramps.Steve Robbins 05/08/2017 3:11 PM
PW-Misc
Informational
05/12/2017
The sidewalk on O;brien and moore st. has been formed and compacted with rock and ADA ramp formed.Steve Robbins 05/11/2017 2:28 PM
PW-Misc
Informational
05/18/2017
The sidewalk on o'brien and moore st. has been inspected and has passed. Threre is also an ADA ramp on the corner of moore and o'brien, it has also passed. They still have to do an approach on moore st.Steve Robbins 05/18/2017 3:42 PM
Pavement-Stabilized Subgrade Passed 5/19/2017 05/19/2017
PW-Misc
Informational
05/11/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/11/2017
I talked to the contractor, Shaw, they have tore out the public sidewalk on O"brien and are getting ready to form it. It also has a few ADA ramps.Steve Robbins 05/08/2017 3:11 PM
PW-Misc
Informational
05/11/2017
The sidewalk on O;brien and moore st. has been formed and compacted with rock and ADA ramp formed.Steve Robbins 05/11/2017 2:28 PM
PW-Misc
Informational
05/19/2017
They have installed more rock yesterday and the lower level is completed.Steve Robbins 05/19/2017 11:35 AM
Pavement-Stabilized Subgrade Partial 5/22/2017 05/22/2017
PW-Misc
Informational
05/17/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
05/17/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/17/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
05/17/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
PW-Misc
Informational
05/22/2017
All of the subgrade rock has been installed on the Moore st. entrance, the were getting the curb stakes installed this morning. I talked with Jim from Paric last week and he just wanted to know if all the inspections were up to date. I talked to Glenn Martin and he said all the water, sanitary and storm had been completed and all the water samples. I am finishing up the parking lot, sidewalk and any other things that come up with getting this project finished.Steve Robbins 05/22/2017 3:40 PM
Pavement-Stabilized Subgrade Partial 5/24/2017 05/24/2017
PW-Misc
Informational
05/22/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
05/22/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/22/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
05/22/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
PW-Misc
Informational
05/22/2017
All of the subgrade rock has been installed on the Moore st. entrance, the were getting the curb stakes installed this morning. I talked with Jim from Paric last week and he just wanted to know if all the inspections were up to date. I talked to Glenn Martin and he said all the water, sanitary and storm had been completed and all the water samples. I am finishing up the parking lot, sidewalk and any other things that come up with getting this project finished.Steve Robbins 05/22/2017 3:40 PM
PW-Misc
Informational
05/24/2017
Yesterday I got a call from maxi about a lady falling off her bike on o"brien rd. I talked with emery sapp and they put orange cones around the area that did not have a sidewalk. The sidewalk is blocked off from both directions now. They are also attempting to put the subgrade rock in on the approach off moore st.Steve Robbins 05/24/2017 9:06 AM
Pavement-Stabilized Subgrade Partial 5/26/2017 05/26/2017
PW-Misc
Informational
05/24/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
05/26/2017
I talked with Brent from Emery Sapp about the dirt that is on the sidewalk on o'brien and moore st. , they were doing some grading by the sidewalks that were just installed. Brent said someone was coming to get the dirt off the sidewalk. I also talked with Andrew and he said he is working on getting the rest of the sidewalk poured where the lady fell off her bike. Right now they have cones blocking off the sidewalk.Steve Robbins 05/26/2017 3:35 PM
PW-Misc
Informational
05/24/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/24/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
05/24/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
PW-Misc
Informational
05/24/2017
All of the subgrade rock has been installed on the Moore st. entrance, the were getting the curb stakes installed this morning. I talked with Jim from Paric last week and he just wanted to know if all the inspections were up to date. I talked to Glenn Martin and he said all the water, sanitary and storm had been completed and all the water samples. I am finishing up the parking lot, sidewalk and any other things that come up with getting this project finished.Steve Robbins 05/22/2017 3:40 PM
PW-Misc
Informational
05/24/2017
Yesterday I got a call from maxi about a lady falling off her bike on o"brien rd. I talked with emery sapp and they put orange cones around the area that did not have a sidewalk. The sidewalk is blocked off from both directions now. They are also attempting to put the subgrade rock in on the approach off moore st.Steve Robbins 05/24/2017 9:06 AM
Driveway Inspection Partial 6/2/2017 06/02/2017
PW-Misc
Informational
06/02/2017
The driveway approach on Moore St. has been formed and rock was compacted. They are set up for a less than 2% slope for the sidewalk, told them they needed to use kcmmb mix for the approach and curbs.Steve Robbins 06/02/2017 3:52 PM
Driveway Inspection Passed 6/13/2017 06/16/2017
PW-Misc
Informational
06/02/2017
The driveway approach on Moore St. has been formed and rock was compacted. They are set up for a less than 2% slope for the sidewalk, told them they needed to use kcmmb mix for the approach and curbs.Steve Robbins 06/02/2017 3:52 PM
PW-Misc
Informational
06/16/2017
The driveway approach has been installed on Moore st. and has passed inspections. All approaches have passed.lSteve Robbins 06/16/2017 11:42 AM
Sidewalk Inspection Passed 6/14/2017 06/16/2017
PW-Misc
Informational
05/08/2017
I talked to the contractor, Shaw, they have tore out the public sidewalk on O"brien and are getting ready to form it. It also has a few ADA ramps.Steve Robbins 05/08/2017 3:11 PM
PW-Misc
Informational
05/08/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
06/16/2017
The remaining sidewalk on O'brien has been completed. We put a new curb in the approach where the sidewalk was going in, we had them put and 8" sidewalk in for the section on O'brien where the fire lane is. This now completes the sidewalk and the approaches.Steve Robbins 06/16/2017 2:11 PM
Pavement-Stabilized Subgrade Partial 6/22/2017 06/22/2017
PW-Misc
Informational
05/26/2017
I talked with Brent from Emery Sapp about the dirt that is on the sidewalk on o'brien and moore st. , they were doing some grading by the sidewalks that were just installed. Brent said someone was coming to get the dirt off the sidewalk. I also talked with Andrew and he said he is working on getting the rest of the sidewalk poured where the lady fell off her bike. Right now they have cones blocking off the sidewalk.Steve Robbins 05/26/2017 3:35 PM
PW-Misc
Informational
05/26/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
05/26/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
05/26/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
05/26/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
PW-Misc
Informational
05/26/2017
All of the subgrade rock has been installed on the Moore st. entrance, the were getting the curb stakes installed this morning. I talked with Jim from Paric last week and he just wanted to know if all the inspections were up to date. I talked to Glenn Martin and he said all the water, sanitary and storm had been completed and all the water samples. I am finishing up the parking lot, sidewalk and any other things that come up with getting this project finished.Steve Robbins 05/22/2017 3:40 PM
PW-Misc
Informational
05/26/2017
Yesterday I got a call from maxi about a lady falling off her bike on o"brien rd. I talked with emery sapp and they put orange cones around the area that did not have a sidewalk. The sidewalk is blocked off from both directions now. They are also attempting to put the subgrade rock in on the approach off moore st.Steve Robbins 05/24/2017 9:06 AM
PW-Misc
Informational
06/22/2017
The emergency fire land that is off o'brien has been completed. The sidewalk that is in the row and the curb has been replaced with 8" of kcmmb granite mix. Steve Robbins 06/22/2017 3:36 PM
Pavement-Stabilized Subgrade Partial 7/5/2017 07/05/2017
PW-Misc
Informational
06/22/2017
I talked with Brent from Emery Sapp about the dirt that is on the sidewalk on o'brien and moore st. , they were doing some grading by the sidewalks that were just installed. Brent said someone was coming to get the dirt off the sidewalk. I also talked with Andrew and he said he is working on getting the rest of the sidewalk poured where the lady fell off her bike. Right now they have cones blocking off the sidewalk.Steve Robbins 05/26/2017 3:35 PM
PW-Misc
Informational
06/22/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
06/22/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
06/22/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
06/22/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
PW-Misc
Informational
06/22/2017
All of the subgrade rock has been installed on the Moore st. entrance, the were getting the curb stakes installed this morning. I talked with Jim from Paric last week and he just wanted to know if all the inspections were up to date. I talked to Glenn Martin and he said all the water, sanitary and storm had been completed and all the water samples. I am finishing up the parking lot, sidewalk and any other things that come up with getting this project finished.Steve Robbins 05/22/2017 3:40 PM
PW-Misc
Informational
06/22/2017
Yesterday I got a call from maxi about a lady falling off her bike on o"brien rd. I talked with emery sapp and they put orange cones around the area that did not have a sidewalk. The sidewalk is blocked off from both directions now. They are also attempting to put the subgrade rock in on the approach off moore st.Steve Robbins 05/24/2017 9:06 AM
PW-Misc
Informational
06/22/2017
The emergency fire land that is off o'brien has been completed. The sidewalk that is in the row and the curb has been replaced with 8" of kcmmb granite mix. Steve Robbins 06/22/2017 3:36 PM
PW-Misc
Informational
07/05/2017
They are still working on the parkinglot on the corner of Moore and O'Brien, they are having issues the parking lot to be ADA compliant. They have the subgrade in, but it will probably be changing.Steve Robbins 07/05/2017 3:21 PM
Pavement-Stabilized Subgrade Partial 7/18/2017 07/18/2017
PW-Misc
Informational
07/05/2017
I talked with Brent from Emery Sapp about the dirt that is on the sidewalk on o'brien and moore st. , they were doing some grading by the sidewalks that were just installed. Brent said someone was coming to get the dirt off the sidewalk. I also talked with Andrew and he said he is working on getting the rest of the sidewalk poured where the lady fell off her bike. Right now they have cones blocking off the sidewalk.Steve Robbins 05/26/2017 3:35 PM
PW-Misc
Informational
07/05/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
07/05/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
07/05/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
07/05/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
PW-Misc
Informational
07/05/2017
All of the subgrade rock has been installed on the Moore st. entrance, the were getting the curb stakes installed this morning. I talked with Jim from Paric last week and he just wanted to know if all the inspections were up to date. I talked to Glenn Martin and he said all the water, sanitary and storm had been completed and all the water samples. I am finishing up the parking lot, sidewalk and any other things that come up with getting this project finished.Steve Robbins 05/22/2017 3:40 PM
PW-Misc
Informational
07/05/2017
Yesterday I got a call from maxi about a lady falling off her bike on o"brien rd. I talked with emery sapp and they put orange cones around the area that did not have a sidewalk. The sidewalk is blocked off from both directions now. They are also attempting to put the subgrade rock in on the approach off moore st.Steve Robbins 05/24/2017 9:06 AM
PW-Misc
Informational
07/05/2017
The emergency fire land that is off o'brien has been completed. The sidewalk that is in the row and the curb has been replaced with 8" of kcmmb granite mix. Steve Robbins 06/22/2017 3:36 PM
PW-Misc
Informational
07/05/2017
They are still working on the parkinglot on the corner of Moore and O'Brien, they are having issues the parking lot to be ADA compliant. They have the subgrade in, but it will probably be changing.Steve Robbins 07/05/2017 3:21 PM
PW-Misc
Informational
07/18/2017
The contractor has not finished the subgrade on the parking lot on moore and o'brien. There is an isssue with it being ada compliant.Steve Robbins 07/18/2017 2:57 PM
Pavement-Stabilized Subgrade Passed 7/28/2017 11/10/2017
PW-Misc
Informational
07/18/2017
I talked with Brent from Emery Sapp about the dirt that is on the sidewalk on o'brien and moore st. , they were doing some grading by the sidewalks that were just installed. Brent said someone was coming to get the dirt off the sidewalk. I also talked with Andrew and he said he is working on getting the rest of the sidewalk poured where the lady fell off her bike. Right now they have cones blocking off the sidewalk.Steve Robbins 05/26/2017 3:35 PM
PW-Misc
Informational
07/18/2017
On friday and today they are installing geo-grid and rock in the parking lot off the Moore st. entrance. I talked to Mike W. and he said they got permission to make the parking lot spaces a few feet shorter because of the retaining wall took up a few more feet than they expected.Steve Robbins 05/15/2017 9:57 AM
PW-Misc
Informational
07/18/2017
Nothing was done with the sidewalk today, I took over this project from Glenn Martin, all the water, storm and sanitary has been installed and tested. They still have the parking lot to do.Steve Robbins 04/12/2017 3:52 PM
PW-Misc
Informational
07/18/2017
Today they are installing the geo-grid and rock for the parking area off of moore st, they are about halfway finished with the area.Steve Robbins 05/11/2017 2:19 PM
PW-Misc
Informational
07/18/2017
They have not done anymore installation of the rock and geo-grid.Steve Robbins 05/17/2017 3:16 PM
PW-Misc
Informational
07/18/2017
All of the subgrade rock has been installed on the Moore st. entrance, the were getting the curb stakes installed this morning. I talked with Jim from Paric last week and he just wanted to know if all the inspections were up to date. I talked to Glenn Martin and he said all the water, sanitary and storm had been completed and all the water samples. I am finishing up the parking lot, sidewalk and any other things that come up with getting this project finished.Steve Robbins 05/22/2017 3:40 PM
PW-Misc
Informational
07/18/2017
Yesterday I got a call from maxi about a lady falling off her bike on o"brien rd. I talked with emery sapp and they put orange cones around the area that did not have a sidewalk. The sidewalk is blocked off from both directions now. They are also attempting to put the subgrade rock in on the approach off moore st.Steve Robbins 05/24/2017 9:06 AM
PW-Misc
Informational
07/18/2017
The emergency fire land that is off o'brien has been completed. The sidewalk that is in the row and the curb has been replaced with 8" of kcmmb granite mix. Steve Robbins 06/22/2017 3:36 PM
PW-Misc
Informational
07/18/2017
They are still working on the parkinglot on the corner of Moore and O'Brien, they are having issues the parking lot to be ADA compliant. They have the subgrade in, but it will probably be changing.Steve Robbins 07/05/2017 3:21 PM
PW-Misc
Informational
07/18/2017
The contractor has not finished the subgrade on the parking lot on moore and o'brien. There is an isssue with it being ada compliant.Steve Robbins 07/18/2017 2:57 PM
Grading/Excavation/Fill Inspection Passed 01/24/2018
Documents & Images
Date Uploaded File Type Document Name
06/09/2016 Receipt Receipt for transaction: 2016-003553
06/21/2016 Letter PW-Permit
07/11/2016 Letter PW-Daily Inspection Summary
07/13/2016 Letter PW-Site Visit
07/13/2016 Letter PW-Daily Inspection Summary
07/14/2016 Letter PW-Daily Inspection Summary
07/19/2016 Letter PW-Daily Inspection Summary
07/21/2016 JK Signed Permit
07/22/2016 Letter PW-Daily Inspection Summary
07/26/2016 Letter PW-Daily Inspection Summary
07/26/2016 Letter PW-Daily Inspection Summary
07/27/2016 Letter PW-Daily Inspection Summary
07/28/2016 Letter PW-Daily Inspection Summary
07/28/2016 Letter PW-Daily Inspection Summary
08/01/2016 Letter PW-Daily Inspection Summary
08/01/2016 Letter PW-Daily Inspection Summary
08/02/2016 Letter PW-Daily Inspection Summary
08/03/2016 Letter PW-Daily Inspection Summary
08/05/2016 Letter PW-Daily Inspection Summary
08/09/2016 Letter PW-Daily Inspection Summary
08/10/2016 Letter PW-Daily Inspection Summary
09/08/2016 Letter PW-Daily Inspection Summary
09/09/2016 Letter PW-Daily Inspection Summary
09/09/2016 Letter PW-Daily Inspection Summary
09/09/2016 Letter PW-Daily Inspection Summary
09/14/2016 Letter PW-Daily Inspection Summary
09/22/2016 Letter PW-Daily Inspection Summary
04/12/2017 Letter PW-Daily Inspection Summary
05/08/2017 Letter PW-Daily Inspection Summary
05/11/2017 Letter PW-Daily Inspection Summary
05/11/2017 Letter PW-Daily Inspection Summary
05/15/2017 Letter PW-Daily Inspection Summary
05/17/2017 Letter PW-Daily Inspection Summary
05/18/2017 Letter PW-Daily Inspection Summary
05/19/2017 Letter PW-Daily Inspection Summary
05/22/2017 Letter PW-Daily Inspection Summary
05/24/2017 Letter PW-Daily Inspection Summary
05/26/2017 Letter PW-Daily Inspection Summary
06/02/2017 Letter PW-Daily Inspection Summary
06/16/2017 Letter PW-Daily Inspection Summary
06/16/2017 Letter PW-Daily Inspection Summary
06/22/2017 Letter PW-Daily Inspection Summary
07/05/2017 Letter PW-Daily Inspection Summary
07/18/2017 Letter PW-Daily Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home