PRPWFC20160041
Public Works Infrastructure Permit - Commercial
Final Acceptance
SWAMI HOTELS LLC
DEVELOPMENT COMPLETE
Holiday Inn Express (1201 NW Innovation Pkwy.)FDP
01/13/2016
03/01/2016
12/12/2017
Locations
Contacts
LEVEL BUILDERS LLC, Address:P O BOX 29145, Phone:(816) 541-4204  
SWAMI HOTELS LLC, Address:1024 SW WANAMAKER RD  
SWAMI HOTELS LLC, Address:9745 SUNSET CIR  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $36.00 $36.00 Paid 03/01/2016
Water Insp Fee $774.72 $774.72 Paid 03/01/2016
Water Test Fee $200.00 $200.00 Paid 03/01/2016
Storm Sewer Inspection Fee $993.61 $993.61 Paid 03/01/2016
Paved Surface Inspection Fee $6,433.53 $6,433.53 Paid 03/01/2016
Site Grading Fee $165.00 $165.00 Paid 03/01/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 04/15/2016
Water Line - Thrust Restraint Partial 04/15/2016
Water Line - Thrust Restraint Partial 4/19/2016 04/18/2016
PW-Misc
Corrective Action Required
04/18/2016
Inspected thrust block coming out of building, everything is good coming out of the building.Vault is in the ground.
Erosion Control Inspection Partial 4/18/2016 04/18/2016
PW-Erosion and Sediment Control
Corrective Action Required
04/18/2016
Your project is in violation of the Erosion and Sediment control policy. -------------------------------------- called project manager Steve and asked hime to put rock in the construction entrance and he said he will
Erosion Control Inspection Passed 4/20/2016 04/25/2016
PW-Erosion and Sediment Control
Resolved
04/25/2016
Your project is in violation of the Erosion and Sediment control policy. -------------------------------------- called project manager Steve and asked hime to put rock in the construction entrance and he said he will The rock has been installed in the entrance on 4/22/16
Storm Sewer Construction Inspection Partial 4/29/2016 04/29/2016
PW-Misc
Informational
04/29/2016
Installed pipe to curb inlet b-1 to junction b-2
Storm Sewer Construction Inspection Partial 5/2/2016 05/02/2016
PW-Misc
Informational
04/29/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
05/02/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
Storm Sewer Construction Inspection Partial 5/3/2016 05/04/2016
PW-Misc
Informational
05/02/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
05/02/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
05/04/2016
Finished pipe from junction b-2 to curb inlet 2, rock and backfill
Water Line - Fire Hydrant Partial 4/19/2016 06/01/2016
PW-Misc
Informational
04/18/2016
Inspected thrust block coming out of building, everything is good coming out of the building.
PW-Misc
Corrective Action Required
06/01/2016
Both fire hydrants are installed, fire hydrant 1 on south side is installed with thrust block. On the north side 2 is installed with no thrust block becaused hydrant was crooked , but is now straightened out.
Site Visit Complete 6/14/2016 06/14/2016
PW-Misc
Informational
06/14/2016
Talked to Steve today and they are beginning to frame in. The site work is not competed , but they will probably start up in about 2 weeks.
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 07/06/2016
PW-Misc
Informational
07/06/2016
Pipe was connected from the building going to the sewer. 3 sticks of pipe were put in today. Tomorrow they will finish laying the pipe and cut a wye in the existing sewer.Steve Robbins 07/06/2016 4:37 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 7/6/2016 07/07/2016
PW-Misc
Informational
07/06/2016
Pipe was connected from the building going to the sewer. 3 sticks of pipe were put in today. Tomorrow they will finish laying the pipe and cut a wye in the existing sewer.Steve Robbins 07/06/2016 4:37 PM
PW-Misc
Informational
07/07/2016
Pipe was connected from the building going to the sewer. 3 sticks of pipe were put in today. Tomorrow they will finish laying the pipe and cut a wye in the existing sewer.Steve Robbins 07/06/2016 4:37 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Passed 7/8/2016 07/08/2016
PW-Misc
Informational
07/07/2016
Pipe was connected from the building going to the sewer. 3 sticks of pipe were put in today. Tomorrow they will finish laying the pipe and cut a wye in the existing sewer.Steve Robbins 07/06/2016 4:37 PM
PW-Misc
Informational
07/07/2016
Pipe was connected from the building going to the sewer. 3 sticks of pipe were put in today. Tomorrow they will finish laying the pipe and cut a wye in the existing sewer.Steve Robbins 07/06/2016 4:37 PM
PW-Misc
Informational
07/08/2016
Today they cut in the wye for the sanitaray sewer and the rock was put in.
Water Line - Construction Taps Removed Partial 7/11/2016 07/11/2016
PW-Misc
Informational
07/11/2016
Today they a putting in the 3" water line from the building.
Water Line - Construction Taps Removed Partial 7/12/2016 07/13/2016
PW-Misc
Informational
07/11/2016
Today they a putting in the 3" water line from the building.
PW-Misc
Informational
07/13/2016
No work was done yesterday because of the rain. No erosion control problems.Steve Robbins 07/13/2016 7:31 AM
Storm Sewer Construction Inspection Partial 5/4/2016 07/13/2016
PW-Misc
Informational
05/04/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
05/04/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
05/04/2016
Finished pipe from junction b-2 to curb inlet 2, rock and backfill
PW-Misc
Informational
07/13/2016
The attempted to install pipe from curb inlet c504 to the existing 21" storm pipe but the rain did not allow them to complete it.Steve Robbins 07/13/2016 2:03 PM
Storm Sewer Construction Inspection Partial 7/13/2016 07/13/2016
PW-Misc
Informational
07/13/2016
PW-Misc
Informational
07/13/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
07/13/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
07/13/2016
The attempted to install pipe from curb inlet c504 to the existing 21" storm pipe but the rain did not allow them to complete it.Steve Robbins 07/13/2016 2:03 PM
PW-Misc
Informational
07/13/2016
Today they attempted to tie in curb inlet C504 to the existing stormwater pipe, they got the the existing pipe exposed but did not finish due to the rainl.Steve Robbins 07/13/2016 3:27 PM
Storm Sewer Construction Inspection Partial 7/14/2016 07/14/2016
PW-Misc
Informational
07/13/2016
PW-Misc
Informational
07/13/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
07/13/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
07/13/2016
The attempted to install pipe from curb inlet c504 to the existing 21" storm pipe but the rain did not allow them to complete it.Steve Robbins 07/13/2016 2:03 PM
PW-Misc
Informational
07/13/2016
Today they attempted to tie in curb inlet C504 to the existing stormwater pipe, they got the the existing pipe exposed but did not finish due to the rainl.Steve Robbins 07/13/2016 3:27 PM
PW-Misc
Informational
07/14/2016
Steve Robbins 07/14/2016 4:26 PMThey did not do alot today, they prepared the storm inlets and storm pipes for tomorrow when they plan to put the collars on and then they are planning on finishing the last section of pipe.
Storm Sewer Construction Inspection Partial 7/15/2016 07/19/2016
PW-Misc
Informational
07/14/2016
PW-Misc
Informational
07/14/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
07/14/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
07/14/2016
The attempted to install pipe from curb inlet c504 to the existing 21" storm pipe but the rain did not allow them to complete it.Steve Robbins 07/13/2016 2:03 PM
PW-Misc
Informational
07/14/2016
Today they attempted to tie in curb inlet C504 to the existing stormwater pipe, they got the the existing pipe exposed but did not finish due to the rainl.Steve Robbins 07/13/2016 3:27 PM
PW-Misc
Informational
07/14/2016
Steve Robbins 07/14/2016 4:26 PMThey did not do alot today, they prepared the storm inlets and storm pipes for tomorrow when they plan to put the collars on and then they are planning on finishing the last section of pipe.
Informational
07/19/2016
Today they dug around one of the curb inlet boxes in preparing to pour the 2 remaining collars they did not do when they originally put them in. I also talked to Steve about some mud on the street and couple of sections of silt fence that was down. He already took care of it this afternoon. I asked him this morning.Steve Robbins 07/19/2016 3:50 PM
Water Line - Fire Hydrant Passed 6/7/2016 07/19/2016
PW-Misc
Informational
06/01/2016
Inspected thrust block coming out of building, everything is good coming out of the building.
PW-Misc
Corrective Action Required
06/01/2016
Both fire hydrants are installed, fire hydrant 1 on south side is installed with thrust block. On the north side 2 is installed with no thrust block becaused hydrant was crooked , but is now straightened out.
PW-Misc
Informational
07/19/2016
On friday 7/15 Mitch covered for me and they put a thrust block on the last fire hydrant. Now both fire hydrants are finished.Steve Robbins 07/19/2016 3:59 PM
Storm Sewer Construction Inspection Partial 7/21/2016 07/21/2016
PW-Misc
Informational
07/19/2016
PW-Misc
Informational
07/19/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
07/19/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
07/19/2016
The attempted to install pipe from curb inlet c504 to the existing 21" storm pipe but the rain did not allow them to complete it.Steve Robbins 07/13/2016 2:03 PM
PW-Misc
Informational
07/19/2016
Today they attempted to tie in curb inlet C504 to the existing stormwater pipe, they got the the existing pipe exposed but did not finish due to the rainl.Steve Robbins 07/13/2016 3:27 PM
PW-Misc
Informational
07/21/2016
All storm sewer pipe and curb inlets are installed and grouted. They still have to backfill, so i will not give a pass for today. Steve Robbins 07/21/2016 3:49 PM
Water Line - Construction Taps Removed Partial 7/14/2016 07/21/2016
PW-Misc
Informational
07/13/2016
No work was done yesterday because of the rain. No erosion control problems.Steve Robbins 07/13/2016 7:31 AM
PW-Misc
Informational
07/13/2016
Today they a putting in the 3" water line from the building.
PW-Misc
Informational
07/21/2016
The backflow preventer was grouted today and they are ready for the water tap for the domestic water line.
Storm Sewer Construction Inspection Partial 7/22/2016 07/26/2016
PW-Misc
Informational
07/21/2016
PW-Misc
Informational
07/21/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
07/21/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
07/21/2016
The attempted to install pipe from curb inlet c504 to the existing 21" storm pipe but the rain did not allow them to complete it.Steve Robbins 07/13/2016 2:03 PM
PW-Misc
Informational
07/21/2016
Today they attempted to tie in curb inlet C504 to the existing stormwater pipe, they got the the existing pipe exposed but did not finish due to the rainl.Steve Robbins 07/13/2016 3:27 PM
PW-Misc
Informational
07/21/2016
All storm sewer pipe and curb inlets are installed and grouted. They still have to backfill, so i will not give a pass for today. Steve Robbins 07/21/2016 3:49 PM
Corrective Action Required
07/26/2016
All the storm pipe is installed but they still have to backfill some of the dirt, so this will not be complete yet. Steve Robbins 07/26/2016 3:16 PM
Water Line - Blow Off Passed 7/25/2016 08/16/2016
PW-Misc
Informational
07/21/2016
No work was done yesterday because of the rain. No erosion control problems.Steve Robbins 07/13/2016 7:31 AM
PW-Misc
Informational
07/21/2016
Today they a putting in the 3" water line from the building.
PW-Misc
Informational
07/21/2016
The backflow preventer was grouted today and they are ready for the water tap for the domestic water line.
PW-Misc
Informational
08/16/2016
All water lines were flushed , Water dept did there water tap for the domestic and irrigation line. Also did a complete flush.Steve Robbins 08/16/2016 3:21 PM
Grading/Excavation/Fill Inspection Partial 9/14/2016 09/14/2016
PW-Misc
Informational
09/14/2016
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
Storm Sewer Construction Inspection Passed 7/29/2016 09/14/2016
PW-Misc
Informational
07/26/2016
PW-Misc
Informational
07/26/2016
Installed pipe to curb inlet b-1 to junction b-2
PW-Misc
Informational
07/26/2016
Installed pipe from junction b-2 to b-3 , took John Haley with me and he agreed that the curb inlets look low, they are well below the grade of the street. Talked to the contractor and they assured me that it is at correct height. Also took a picture of possible sidewalk damage by the ada sidewalk ramp.
PW-Misc
Informational
07/26/2016
The attempted to install pipe from curb inlet c504 to the existing 21" storm pipe but the rain did not allow them to complete it.Steve Robbins 07/13/2016 2:03 PM
PW-Misc
Informational
07/26/2016
Today they attempted to tie in curb inlet C504 to the existing stormwater pipe, they got the the existing pipe exposed but did not finish due to the rainl.Steve Robbins 07/13/2016 3:27 PM
PW-Misc
Informational
08/16/2016
PW-Misc
Informational
09/14/2016
All storm boxes and inlets have been completed. The pipe has been laid and collars poured. Steve Robbins 09/14/2016 11:45 AM
Curb - Proof Roll Partial 11/3/2016 11/10/2016
Commercial Curb Inspection Partial 11/10/2016 11/10/2016
PW-Misc
Informational
11/10/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
Commercial Curb Inspection Partial 11/11/2016 11/14/2016
PW-Misc
Informational
11/10/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
11/14/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
Commercial Curb Inspection Partial 11/15/2016 11/21/2016
PW-Misc
Informational
11/14/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
11/14/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
11/21/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
Curb - Proof Roll Passed 11/17/2016 11/22/2016
PW-Misc
Informational
11/22/2016
The proofroll has been done for the entire parking lot and passed.Steve Robbins 11/22/2016 3:49 PM
Commercial Curb Inspection Partial 11/23/2016 11/23/2016
PW-Misc
Informational
11/21/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
11/23/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
11/21/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
11/21/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
Commercial Curb Inspection Partial 11/28/2016 11/28/2016
PW-Misc
Informational
11/23/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
11/28/2016
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
11/23/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
11/23/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
11/23/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
Commercial Curb Inspection Partial 11/29/2016 11/30/2016
PW-Misc
Informational
11/28/2016
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
11/30/2016
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
11/28/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
11/28/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
11/28/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
11/28/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
Commercial Curb Inspection Partial 12/1/2016 12/01/2016
PW-Misc
Informational
11/30/2016
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
11/30/2016
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
11/30/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
11/30/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
11/30/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
11/30/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
12/01/2016
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
Commercial Curb Inspection Partial 12/19/2016 12/19/2016
PW-Misc
Informational
12/01/2016
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
12/19/2016
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
12/01/2016
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
12/01/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
12/01/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
12/01/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
12/01/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
12/01/2016
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
Commercial Curb Inspection Partial 12/20/2016 12/21/2016
PW-Misc
Informational
12/19/2016
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
12/19/2016
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
12/19/2016
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
12/19/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
12/19/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
12/19/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
12/19/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
12/19/2016
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
12/21/2016
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
Commercial Curb Inspection Partial 12/22/2016 12/30/2016
PW-Misc
Informational
12/21/2016
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
12/21/2016
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
12/21/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
12/21/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
12/21/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
12/21/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
12/21/2016
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
12/21/2016
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
12/21/2016
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
12/30/2016
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
Fire Line - Hydrostatic Test Passed 1/4/2017 01/04/2017
PW-Misc
Informational
01/04/2017
Today the hydrostatic pressure test was done 200 for 2 hrs. The test passed.Steve Robbins 01/04/2017 3:38 PM
Commercial Curb Inspection Partial 1/3/2017 01/04/2017
PW-Misc
Informational
12/30/2016
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/04/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
12/30/2016
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
12/30/2016
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
12/30/2016
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
12/30/2016
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
12/30/2016
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
12/30/2016
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
12/30/2016
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
12/30/2016
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
12/30/2016
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
Commercial Curb Inspection Partial 1/6/2017 01/06/2017
PW-Misc
Informational
01/04/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/06/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/04/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/04/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/04/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/04/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/04/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/04/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/04/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/04/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/04/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/04/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
Commercial Curb Inspection Partial 1/9/2017 01/09/2017
PW-Misc
Informational
01/06/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/09/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/06/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/06/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/06/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/06/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/06/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/06/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/06/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/06/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/06/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/06/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/06/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
Commercial Curb Inspection Partial 1/10/2017 01/11/2017
PW-Misc
Informational
01/09/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/11/2017
Yesterday and today they are still forming and installing curbs for the parking lot. They are going to let me know when they get to the driveway entrance, which will be coming up soon.Steve Robbins 01/11/2017 3:19 PM
PW-Misc
Informational
01/09/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/09/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/09/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/09/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/09/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/09/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/09/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/09/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/09/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/09/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/09/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/09/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
Commercial Curb Inspection Partial 1/12/2017 01/12/2017
PW-Misc
Informational
01/11/2017
Yesterday and today they are still forming and installing curbs for the parking lot. They are going to let me know when they get to the driveway entrance, which will be coming up soon.Steve Robbins 01/11/2017 3:19 PM
PW-Misc
Informational
01/11/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/11/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/11/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/11/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/11/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/11/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/11/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/11/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/11/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/11/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/11/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/11/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/11/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
PW-Misc
Informational
01/12/2017
Today they are pouring the concrete for the parking lot, they are by the driveway entrance, they have just a little bit more to go and they will be finished with the concrete and curbs in the parking lot.Steve Robbins 01/12/2017 1:12 PM
Commercial Curb Inspection Partial 1/13/2017 01/17/2017
PW-Misc
Informational
01/12/2017
Yesterday and today they are still forming and installing curbs for the parking lot. They are going to let me know when they get to the driveway entrance, which will be coming up soon.Steve Robbins 01/11/2017 3:19 PM
PW-Misc
Informational
01/12/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/12/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/12/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/12/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/12/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/12/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/12/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/12/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/12/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/12/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/12/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/12/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/12/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
PW-Misc
Informational
01/12/2017
Today they are pouring the concrete for the parking lot, they are by the driveway entrance, they have just a little bit more to go and they will be finished with the concrete and curbs in the parking lot.Steve Robbins 01/12/2017 1:12 PM
PW-Misc
Informational
01/17/2017
I drove a snow plow truck on friday 1/13/17 and yesterday was a holiday. Today they are pouring more of the parking lot, they are getting close to the entrance. They will continue forming after they are finished pouring. The erosion control seems to be doing fine.Steve Robbins 01/17/2017 9:50 AM
Commercial Curb Inspection Partial 1/18/2017 01/18/2017
PW-Misc
Informational
01/17/2017
Yesterday and today they are still forming and installing curbs for the parking lot. They are going to let me know when they get to the driveway entrance, which will be coming up soon.Steve Robbins 01/11/2017 3:19 PM
PW-Misc
Informational
01/18/2017
Today they poured more of the parking lot. They will form more tomorrow.Steve Robbins 01/18/2017 4:23 PM
PW-Misc
Informational
01/17/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/17/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/17/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/17/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/17/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/17/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/17/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/17/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/17/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/17/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/17/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/17/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/17/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
PW-Misc
Informational
01/17/2017
Today they are pouring the concrete for the parking lot, they are by the driveway entrance, they have just a little bit more to go and they will be finished with the concrete and curbs in the parking lot.Steve Robbins 01/12/2017 1:12 PM
PW-Misc
Informational
01/17/2017
I drove a snow plow truck on friday 1/13/17 and yesterday was a holiday. Today they are pouring more of the parking lot, they are getting close to the entrance. They will continue forming after they are finished pouring. The erosion control seems to be doing fine.Steve Robbins 01/17/2017 9:50 AM
Commercial Curb Inspection Partial 1/19/2017 01/19/2017
PW-Misc
Informational
01/18/2017
Today they poured more of the parking lot. They will form more tomorrow.Steve Robbins 01/18/2017 4:23 PM
PW-Misc
Informational
01/18/2017
Yesterday and today they are still forming and installing curbs for the parking lot. They are going to let me know when they get to the driveway entrance, which will be coming up soon.Steve Robbins 01/11/2017 3:19 PM
PW-Misc
Informational
01/18/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/18/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/18/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/18/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/18/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/18/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/18/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/18/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/18/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/18/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/18/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/18/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/18/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
PW-Misc
Informational
01/18/2017
Today they are pouring the concrete for the parking lot, they are by the driveway entrance, they have just a little bit more to go and they will be finished with the concrete and curbs in the parking lot.Steve Robbins 01/12/2017 1:12 PM
PW-Misc
Informational
01/18/2017
I drove a snow plow truck on friday 1/13/17 and yesterday was a holiday. Today they are pouring more of the parking lot, they are getting close to the entrance. They will continue forming after they are finished pouring. The erosion control seems to be doing fine.Steve Robbins 01/17/2017 9:50 AM
PW-Misc
Informational
01/19/2017
Today they just formed a few more curbs.Steve Robbins 01/19/2017 2:33 PM
Commercial Curb Inspection Partial 1/20/2017 01/20/2017
PW-Misc
Informational
01/19/2017
Today they poured more of the parking lot. They will form more tomorrow.Steve Robbins 01/18/2017 4:23 PM
PW-Misc
Informational
01/20/2017
Today they poured more concrete in the parking lot, after today they will be almost finished, just one more section until they are ready for the curbs and driveway approach.Steve Robbins 01/20/2017 3:25 PM
PW-Misc
Informational
01/19/2017
Yesterday and today they are still forming and installing curbs for the parking lot. They are going to let me know when they get to the driveway entrance, which will be coming up soon.Steve Robbins 01/11/2017 3:19 PM
PW-Misc
Informational
01/19/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/19/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/19/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/19/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/19/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/19/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/19/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/19/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/19/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/19/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/19/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/19/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/19/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
PW-Misc
Informational
01/19/2017
Today they are pouring the concrete for the parking lot, they are by the driveway entrance, they have just a little bit more to go and they will be finished with the concrete and curbs in the parking lot.Steve Robbins 01/12/2017 1:12 PM
PW-Misc
Informational
01/19/2017
I drove a snow plow truck on friday 1/13/17 and yesterday was a holiday. Today they are pouring more of the parking lot, they are getting close to the entrance. They will continue forming after they are finished pouring. The erosion control seems to be doing fine.Steve Robbins 01/17/2017 9:50 AM
PW-Misc
Informational
01/19/2017
Today they just formed a few more curbs.Steve Robbins 01/19/2017 2:33 PM
Commercial Curb Inspection Passed 1/23/2017 01/23/2017
PW-Misc
Informational
01/20/2017
Today they poured more concrete in the parking lot, after today they will be almost finished, just one more section until they are ready for the curbs and driveway approach.Steve Robbins 01/20/2017 3:25 PM
PW-Misc
Informational
01/23/2017
All of the parking lot has been completed. All concrete has been poured and is complete. All curbs for the parking lot has also been finished.Steve Robbins 01/23/2017 2:51 PM
PW-Misc
Informational
01/20/2017
Today they poured more of the parking lot. They will form more tomorrow.Steve Robbins 01/18/2017 4:23 PM
PW-Misc
Informational
01/20/2017
Yesterday and today they are still forming and installing curbs for the parking lot. They are going to let me know when they get to the driveway entrance, which will be coming up soon.Steve Robbins 01/11/2017 3:19 PM
PW-Misc
Informational
01/20/2017
All the curbs for the parking lot have been formed, they may pour the last section today if the weather warms up, if not they will tomorrow. They are next going to pour the entry for the driveway, then they will finish pouring the rest of the parking lotl.Steve Robbins 01/09/2017 11:03 AM
PW-Misc
Informational
01/20/2017
They were digging holes with and auger for the lights posts in the parking lot. Nothing has been going on with the curbs or concrete for the parking lot the past 2 days.Steve Robbins 01/06/2017 1:43 PM
PW-Misc
Informational
01/20/2017
They formed more curbs today, they did not pour any of the concrete for the parking lot.Steve Robbins 01/04/2017 3:41 PM
PW-Misc
Informational
01/20/2017
Today they are forming up more curb and getting ready to pour more of the parking lot this afternoon.Steve Robbins 11/30/2016 12:32 PM
PW-Misc
Informational
01/20/2017
Today they are forming curbs on the west side of the building. They are getting close to having 1/2 the parking lot done now. When they pour the curbs they they pour concrete in the parking lot. Steve Robbins 11/28/2016 8:28 AM
PW-Misc
Informational
01/20/2017
Today they are pouring more concrete in the parking lot, they are doing the curbs and parking lot in sections. Steve Robbins 11/23/2016 11:37 AM
PW-Misc
Informational
01/20/2017
Today they are foming up curbs for the parking lot.Steve Robbins 11/10/2016 11:46 AM
PW-Misc
Informational
01/20/2017
Some of the curbs have been poured on the north side of the parking lot and today they are pouring some of the parking lot on the south side also.Steve Robbins 11/14/2016 12:05 PM
PW-Misc
Informational
01/20/2017
Today they are putting in concrete for the parking lot on the west side of the building. They still need to finish the curbs , but they are doing it as they go.Steve Robbins 11/21/2016 3:51 PM
PW-Misc
Informational
01/20/2017
Today they are pouring concrete for the parking lot.Steve Robbins 12/01/2016 12:50 PM
PW-Misc
Informational
01/20/2017
No work done today due to the cold and snowSteve Robbins 12/19/2016 3:56 PM
PW-Misc
Informational
01/20/2017
Today they are pouring more concrete 6" , the weather is much warmer today 38 and will be up for the next several days. They will be forming more curbs when they get done pouring the parkiSteve Robbins 12/21/2016 11:46 AMng lot.
PW-Misc
Informational
01/20/2017
They have been continuing pouring curbs and and pouring 6" of concrete for the parking lot. Everything on the parking lot is completed except for the east side and the driveway.Steve Robbins 12/30/2016 1:05 PM
PW-Misc
Informational
01/20/2017
Today they are pouring the concrete for the parking lot, they are by the driveway entrance, they have just a little bit more to go and they will be finished with the concrete and curbs in the parking lot.Steve Robbins 01/12/2017 1:12 PM
PW-Misc
Informational
01/20/2017
I drove a snow plow truck on friday 1/13/17 and yesterday was a holiday. Today they are pouring more of the parking lot, they are getting close to the entrance. They will continue forming after they are finished pouring. The erosion control seems to be doing fine.Steve Robbins 01/17/2017 9:50 AM
PW-Misc
Informational
01/20/2017
Today they just formed a few more curbs.Steve Robbins 01/19/2017 2:33 PM
Driveway Inspection Partial 1/24/2017 01/24/2017
PW-Misc
Informational
01/24/2017
Today they formed the driveway approach and the curbs. Rock has been installed , they will pour the curb tomorrow in the morning and then the entrance.Steve Robbins 01/24/2017 2:12 PM
Driveway Inspection Partial 1/25/2017 01/25/2017
PW-Misc
Informational
01/24/2017
Today they formed the driveway approach and the curbs. Rock has been installed , they will pour the curb tomorrow in the morning and then the entrance.Steve Robbins 01/24/2017 2:12 PM
PW-Misc
Informational
01/25/2017
Today they poured the curb for the driveway approach, they put down a blanket on the rock for the approach. They plan on pouring the concrete for the approach in the morning if the wreather is good.Steve Robbins 01/25/2017 3:29 PM
Driveway Inspection Partial 1/26/2017 01/26/2017
PW-Misc
Informational
01/25/2017
Today they poured the curb for the driveway approach, they put down a blanket on the rock for the approach. They plan on pouring the concrete for the approach in the morning if the wreather is good.Steve Robbins 01/25/2017 3:29 PM
PW-Misc
Informational
01/26/2017
The approach for the driveway has been formed and rock compacted. This morning the poured the concrete and they have blankets on for the night.Steve Robbins 01/26/2017 2:24 PM
PW-Misc
Informational
01/25/2017
Today they formed the driveway approach and the curbs. Rock has been installed , they will pour the curb tomorrow in the morning and then the entrance.Steve Robbins 01/24/2017 2:12 PM
Driveway Inspection Partial 1/27/2017 01/27/2017
PW-Misc
Informational
01/26/2017
The approach for the driveway has been formed and rock compacted. This morning the poured the concrete and they have blankets on for the night.Steve Robbins 01/26/2017 2:24 PM
PW-Misc
Informational
01/27/2017
They still have the blanket on the approach, witch will finish the parking lot.Steve Robbins 01/27/2017 2:48 PM
PW-Misc
Informational
01/26/2017
Today they poured the curb for the driveway approach, they put down a blanket on the rock for the approach. They plan on pouring the concrete for the approach in the morning if the wreather is good.Steve Robbins 01/25/2017 3:29 PM
PW-Misc
Informational
01/26/2017
Today they formed the driveway approach and the curbs. Rock has been installed , they will pour the curb tomorrow in the morning and then the entrance.Steve Robbins 01/24/2017 2:12 PM
Driveway Inspection Passed 1/30/2017 01/30/2017
PW-Misc
Informational
01/27/2017
They still have the blanket on the approach, witch will finish the parking lot.Steve Robbins 01/27/2017 2:48 PM
PW-Misc
Informational
01/30/2017
The driveway entrance has been completed.Steve Robbins 01/30/2017 12:30 PM
PW-Misc
Informational
01/27/2017
The approach for the driveway has been formed and rock compacted. This morning the poured the concrete and they have blankets on for the night.Steve Robbins 01/26/2017 2:24 PM
PW-Misc
Informational
01/27/2017
Today they poured the curb for the driveway approach, they put down a blanket on the rock for the approach. They plan on pouring the concrete for the approach in the morning if the wreather is good.Steve Robbins 01/25/2017 3:29 PM
PW-Misc
Informational
01/27/2017
Today they formed the driveway approach and the curbs. Rock has been installed , they will pour the curb tomorrow in the morning and then the entrance.Steve Robbins 01/24/2017 2:12 PM
Grading/Excavation/Fill Inspection Partial 1/31/2017 01/31/2017
PW-Misc
Informational
09/14/2016
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
01/31/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
Grading/Excavation/Fill Inspection Partial 2/1/2017 02/01/2017
PW-Misc
Informational
01/31/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/01/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
01/31/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
Grading/Excavation/Fill Inspection Partial 2/2/2017 02/02/2017
PW-Misc
Informational
02/01/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/01/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/01/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Corrective Action Required
02/02/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
Grading/Excavation/Fill Inspection Partial 2/3/2017 02/03/2017
PW-Misc
Informational
02/02/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/03/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/02/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/02/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Corrective Action Required
02/02/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
Grading/Excavation/Fill Inspection Partial 2/6/2017 02/06/2017
PW-Misc
Informational
02/03/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/03/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/03/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/03/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Corrective Action Required
02/03/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/06/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/7/2017 02/07/2017
PW-Misc
Informational
02/07/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/06/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/06/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/06/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/06/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/06/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/06/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/8/2017 02/08/2017
PW-Misc
Informational
02/07/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Informational
02/08/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Corrective Action Required
02/07/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/07/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/07/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/07/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/07/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/07/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/9/2017 02/09/2017
PW-Misc
Informational
02/08/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/09/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/08/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/08/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/08/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/08/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/08/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/08/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/08/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/13/2017 02/13/2017
PW-Misc
Informational
02/09/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/13/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/09/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/09/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/09/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/09/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/09/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/09/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/09/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/09/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/14/2017 02/14/2017
PW-Misc
Informational
02/13/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/14/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/13/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/13/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/13/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/13/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/13/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/13/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/13/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/13/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/13/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/15/2017 02/15/2017
PW-Misc
Informational
02/14/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/15/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/14/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/14/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/14/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/14/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/14/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/14/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/14/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/14/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/14/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/14/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/16/2017 02/16/2017
PW-Misc
Informational
02/15/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/16/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/15/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/15/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/15/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/15/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/15/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/15/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/15/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/15/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/15/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/15/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/15/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/17/2017 02/17/2017
PW-Misc
Informational
02/16/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/17/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
02/16/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/16/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/16/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/16/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/16/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/16/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/16/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/16/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/16/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/16/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/16/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/16/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/21/2017 02/21/2017
PW-Misc
Informational
02/17/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
02/21/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
02/17/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/17/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/17/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/17/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/17/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/17/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/17/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/17/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/17/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/17/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/17/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/17/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/17/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 2/22/2017 02/22/2017
PW-Misc
Informational
02/21/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
02/21/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
02/21/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/21/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/21/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/21/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/21/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/21/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/21/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/21/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/21/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/21/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/21/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/21/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/21/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
02/22/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
Grading/Excavation/Fill Inspection Partial 2/23/2017 02/23/2017
PW-Misc
Informational
02/22/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
02/22/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
02/22/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/22/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/22/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/22/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/22/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/22/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/22/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/22/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/22/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/22/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/22/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/22/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/22/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
02/22/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
Grading/Excavation/Fill Inspection Partial 2/24/2017 02/24/2017
PW-Misc
Informational
02/23/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
02/23/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
02/23/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/23/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/23/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/23/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/23/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/23/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/23/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/23/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/23/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/23/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/23/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/23/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/23/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
02/23/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
02/24/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
Grading/Excavation/Fill Inspection Partial 2/28/2017 02/28/2017
PW-Misc
Informational
02/24/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
02/24/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
02/24/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/24/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/24/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/24/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/24/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/24/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/24/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/24/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/24/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/24/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/24/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/24/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/24/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
02/24/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
02/24/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
02/28/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
Grading/Excavation/Fill Inspection Partial 3/1/2017 03/01/2017
PW-Misc
Informational
02/28/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/01/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
02/28/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
02/28/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
02/28/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
02/28/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
02/28/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
02/28/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
02/28/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
02/28/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
02/28/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
02/28/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
02/28/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
02/28/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
02/28/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
02/28/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
02/28/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
02/28/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
02/28/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
Grading/Excavation/Fill Inspection Partial 3/2/2017 03/02/2017
PW-Misc
Informational
03/01/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/02/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/01/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/01/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/01/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/01/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/01/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/01/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/01/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/01/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/01/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/01/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/01/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/01/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/01/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/01/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/01/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/01/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/01/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/01/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
Grading/Excavation/Fill Inspection Partial 3/3/2017 03/03/2017
PW-Misc
Informational
03/02/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/03/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/02/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/02/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/02/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/02/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/02/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/02/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/02/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/02/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/02/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/02/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/02/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/02/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/02/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/02/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/02/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/02/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/02/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/02/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/02/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
Grading/Excavation/Fill Inspection Partial 3/6/2017 03/06/2017
PW-Misc
Informational
03/03/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/06/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/03/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/03/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/03/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/03/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/03/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/03/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/03/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/03/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/03/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/03/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/03/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/03/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/03/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/03/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/03/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/03/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/03/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/03/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/03/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/03/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
Grading/Excavation/Fill Inspection Partial 3/7/2017 03/07/2017
PW-Misc
Informational
03/06/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/06/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/06/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/06/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/06/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/06/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/06/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/06/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/06/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/06/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/06/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/06/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/06/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/06/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/06/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/06/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/06/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/06/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/06/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/06/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/06/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/06/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/07/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
Grading/Excavation/Fill Inspection Partial 3/9/2017 03/09/2017
PW-Misc
Informational
03/07/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/09/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/07/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/07/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/07/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/07/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/07/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/07/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/07/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/07/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/07/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/07/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/07/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/07/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/07/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/07/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/07/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/07/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/07/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/07/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/07/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/07/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/07/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/07/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
Grading/Excavation/Fill Inspection Partial 3/13/2017 03/13/2017
PW-Misc
Informational
03/09/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/13/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/09/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/09/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/09/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/09/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/09/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/09/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/09/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/09/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/09/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/09/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/09/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/09/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/09/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/09/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/09/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/09/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/09/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/09/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/09/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/09/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/09/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/09/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/09/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
Grading/Excavation/Fill Inspection Partial 3/14/2017 03/14/2017
PW-Misc
Informational
03/13/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/14/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/13/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/13/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/13/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/13/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/13/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/13/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/13/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/13/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/13/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/13/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/13/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/13/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/13/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/13/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/13/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/13/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/13/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/13/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/13/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/13/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/13/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/13/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/13/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/13/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
Grading/Excavation/Fill Inspection Partial 3/17/2017 03/17/2017
PW-Misc
Informational
03/14/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/17/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/14/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/14/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/14/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/14/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/14/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/14/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/14/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/14/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/14/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/14/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/14/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/14/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/14/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/14/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/14/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/14/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/14/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/14/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/14/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/14/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/14/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/14/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/14/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/14/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/14/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
Grading/Excavation/Fill Inspection Partial 3/20/2017 03/20/2017
PW-Misc
Informational
03/17/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/20/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/17/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/17/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/17/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/17/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/17/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/17/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/17/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/17/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/17/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/17/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/17/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/17/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/17/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/17/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/17/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/17/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/17/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/17/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/17/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/17/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/17/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/17/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/17/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/17/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/17/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/17/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
Grading/Excavation/Fill Inspection Partial 3/22/2017 03/23/2017
PW-Misc
Informational
03/20/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/23/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
03/20/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/20/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/20/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/20/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/20/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/20/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/20/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/20/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/20/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/20/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/20/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/20/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/20/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/20/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/20/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/20/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/20/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/20/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/20/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/20/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/20/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/20/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/20/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/20/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/20/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/20/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/20/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
Grading/Excavation/Fill Inspection Partial 3/27/2017 03/27/2017
PW-Misc
Informational
03/23/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
03/23/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/23/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/23/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/23/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/23/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/23/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/23/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/23/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/23/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/23/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/23/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/23/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/23/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/23/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/23/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/23/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/23/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/23/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/23/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/23/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/23/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/23/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/23/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/23/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/23/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/23/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/23/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/23/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
PW-Misc
Informational
03/27/2017
They were working on the inside of the building today, It rained for most of the day.Steve Robbins 03/27/2017 3:46 PM
Grading/Excavation/Fill Inspection Partial 3/28/2017 03/28/2017
PW-Misc
Informational
03/27/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
03/28/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
03/27/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/27/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/27/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/27/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/27/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/27/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/27/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/27/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/27/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/27/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/27/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/27/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/27/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/27/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/27/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/27/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/27/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/27/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/27/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/27/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/27/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/27/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/27/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/27/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/27/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/27/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/27/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/27/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
PW-Misc
Informational
03/27/2017
They were working on the inside of the building today, It rained for most of the day.Steve Robbins 03/27/2017 3:46 PM
Grading/Excavation/Fill Inspection Partial 3/29/2017 03/29/2017
PW-Misc
Informational
03/28/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
03/29/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
03/28/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
03/28/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/28/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/28/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/28/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/28/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/28/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/28/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/28/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/28/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/28/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/28/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/28/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/28/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/28/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/28/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/28/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/28/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/28/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/28/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/28/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/28/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/28/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/28/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/28/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/28/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/28/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/28/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/28/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
PW-Misc
Informational
03/28/2017
They were working on the inside of the building today, It rained for most of the day.Steve Robbins 03/27/2017 3:46 PM
Grading/Excavation/Fill Inspection Partial 3/30/2017 03/30/2017
PW-Misc
Informational
03/29/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
03/30/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
03/29/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
03/29/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
03/29/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/29/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/29/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/29/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/29/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/29/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/29/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/29/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/29/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/29/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/29/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/29/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/29/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/29/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/29/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/29/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/29/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/29/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/29/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/29/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/29/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/29/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/29/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/29/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/29/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/29/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/29/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/29/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
PW-Misc
Informational
03/29/2017
They were working on the inside of the building today, It rained for most of the day.Steve Robbins 03/27/2017 3:46 PM
Grading/Excavation/Fill Inspection Partial 3/31/2017 03/31/2017
PW-Misc
Informational
03/30/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
03/31/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
03/30/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
03/30/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
03/30/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
03/30/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/30/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/30/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/30/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/30/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/30/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/30/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/30/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/30/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/30/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/30/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/30/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/30/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/30/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/30/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/30/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/30/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/30/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/30/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/30/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/30/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/30/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/30/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/30/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/30/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/30/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/30/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/30/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
PW-Misc
Informational
03/30/2017
They were working on the inside of the building today, It rained for most of the day.Steve Robbins 03/27/2017 3:46 PM
Grading/Excavation/Fill Inspection Partial 4/3/2017 04/03/2017
PW-Misc
Informational
03/31/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
Corrective Action Required
04/03/2017
PW-Misc
Informational
03/31/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/03/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
03/31/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
03/31/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
03/31/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
03/31/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
03/31/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
03/31/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
03/31/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
03/31/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
03/31/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
03/31/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
03/31/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
03/31/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
03/31/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
03/31/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
03/31/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
03/31/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
03/31/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
03/31/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
03/31/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
03/31/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
03/31/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
03/31/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
03/31/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
03/31/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
03/31/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
03/31/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
03/31/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
03/31/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
03/31/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
03/31/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
PW-Misc
Informational
03/31/2017
They are continuing to install stucco on the exterior of the building.Steve Robbins 03/07/2017 1:08 PM
PW-Misc
Informational
03/31/2017
They were working on the inside of the building today, It rained for most of the day.Steve Robbins 03/27/2017 3:46 PM
Grading/Excavation/Fill Inspection Partial 4/10/2017 04/10/2017
PW-Misc
Corrective Action Required
04/03/2017
Corrective Action Required
04/10/2017
PW-Misc
Informational
04/03/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/10/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Informational
04/03/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/03/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/03/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/03/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/03/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/03/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/03/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/03/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/03/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/03/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/03/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/03/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/03/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/03/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/03/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/03/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/03/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/03/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/03/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/03/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/03/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/03/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/03/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/03/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/03/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/03/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/03/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/03/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/03/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/03/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
04/03/2017
Nothing on the outside going on today.Steve Robbins 02/24/2017 4:04 PM
PW-Misc
Informational
04/03/2017
They have not finished cleaning the trash up yet, today they were working on the outside of the building. The Holiday Inn Express sign is now on the building.Steve Robbins 02/28/2017 4:17 PM
Grading/Excavation/Fill Inspection Partial 4/11/2017 04/11/2017
PW-Misc
Corrective Action Required
04/10/2017
PW-Misc
Informational
04/11/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Informational
04/10/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
04/10/2017
PW-Misc
Informational
04/10/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/10/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/10/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/10/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/10/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/10/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/10/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/10/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/10/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/10/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/10/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/10/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/10/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/10/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/10/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/10/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/10/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/10/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/10/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/10/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/10/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/10/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/10/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/10/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/10/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/10/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/10/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/10/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/10/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/10/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/10/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
Grading/Excavation/Fill Inspection Partial 4/14/2017 04/14/2017
PW-Misc
Informational
04/11/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
04/11/2017
PW-Misc
Informational
04/11/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
04/11/2017
PW-Misc
Informational
04/11/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/11/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/11/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/11/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/11/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/11/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/11/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/11/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/11/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/11/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/11/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/11/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/11/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/11/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/11/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/11/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/11/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/11/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/11/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/11/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/11/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/11/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/11/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/11/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/11/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/11/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/11/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/11/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/11/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/11/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/11/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
04/14/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
Grading/Excavation/Fill Inspection Partial 4/20/2017 04/20/2017
PW-Misc
Informational
04/14/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
04/14/2017
PW-Misc
Informational
04/14/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
04/14/2017
PW-Misc
Informational
04/14/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/14/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/14/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/14/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/14/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/14/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/14/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/14/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/14/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/14/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/14/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/14/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/14/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/14/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/14/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/14/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/14/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/14/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/14/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/14/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/14/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/14/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/14/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/14/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/14/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/14/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/14/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/14/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/14/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/14/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/14/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
04/14/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
04/20/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
Grading/Excavation/Fill Inspection Partial 4/24/2017 04/24/2017
PW-Misc
Informational
04/20/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Informational
04/24/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Corrective Action Required
04/20/2017
PW-Misc
Informational
04/20/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
04/20/2017
PW-Misc
Informational
04/20/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/20/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/20/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/20/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/20/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/20/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/20/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/20/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/20/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/20/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/20/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/20/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/20/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/20/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/20/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/20/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/20/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/20/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/20/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/20/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/20/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/20/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/20/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/20/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/20/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/20/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/20/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/20/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/20/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/20/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/20/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
04/20/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
04/20/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
Grading/Excavation/Fill Inspection Partial 4/26/2017 04/26/2017
PW-Misc
Informational
04/24/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
04/24/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
04/24/2017
PW-Misc
Informational
04/24/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
04/24/2017
PW-Misc
Informational
04/24/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/24/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/24/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/24/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/24/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/24/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/24/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/24/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/24/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/24/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/24/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/24/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/24/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/24/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/24/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/24/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/24/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/24/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/24/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/24/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/24/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/24/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/24/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/24/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/24/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/24/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/24/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/24/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/24/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/24/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/24/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
04/24/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
04/24/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
04/26/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
Grading/Excavation/Fill Inspection Partial 4/28/2017 04/28/2017
PW-Misc
Informational
04/26/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
04/26/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
04/26/2017
PW-Misc
Informational
04/26/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
04/26/2017
PW-Misc
Informational
04/26/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/26/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/26/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/26/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/26/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/26/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/26/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/26/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/26/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/26/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/26/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/26/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/26/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/26/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/26/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/26/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/26/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/26/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/26/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/26/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/26/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/26/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/26/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/26/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/26/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/26/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/26/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/26/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/26/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/26/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/26/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
04/26/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
04/26/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
04/26/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
04/28/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
Grading/Excavation/Fill Inspection Partial 5/2/2017 05/02/2017
PW-Misc
Informational
04/28/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
04/28/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
04/28/2017
PW-Misc
Informational
04/28/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
04/28/2017
PW-Misc
Informational
04/28/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
04/28/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
04/28/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
04/28/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
04/28/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
04/28/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
04/28/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
04/28/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
04/28/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
04/28/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
04/28/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
04/28/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
04/28/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
04/28/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
04/28/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
04/28/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
04/28/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
04/28/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
04/28/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
04/28/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
04/28/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
04/28/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
04/28/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
04/28/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
04/28/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
04/28/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
04/28/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
04/28/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
04/28/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
04/28/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
04/28/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
04/28/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
04/28/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
04/28/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
04/28/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
PW-Misc
Informational
05/02/2017
No work outside today, the ground is still very wet from all the rain.Steve Robbins 05/02/2017 12:39 PM
Grading/Excavation/Fill Inspection Partial 5/8/2017 05/11/2017
PW-Misc
Informational
05/02/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
05/02/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
05/02/2017
PW-Misc
Informational
05/02/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
05/02/2017
PW-Misc
Informational
05/02/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
05/02/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
05/02/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
05/02/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
05/02/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
05/02/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
05/02/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
05/02/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
05/02/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
05/02/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
05/02/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
05/02/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
05/02/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
05/02/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
05/02/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
05/02/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
05/02/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
05/02/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
05/02/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
05/02/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
05/02/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
05/02/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
05/02/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
05/02/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
05/02/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
05/02/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
05/02/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
05/02/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
05/02/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
05/02/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
05/02/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
05/02/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
05/02/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
05/02/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
05/02/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
PW-Misc
Informational
05/02/2017
No work outside today, the ground is still very wet from all the rain.Steve Robbins 05/02/2017 12:39 PM
PW-Misc
Informational
05/11/2017
They have been working on the landscaping planting trees and shrubs.Steve Robbins 05/11/2017 7:04 AM
Grading/Excavation/Fill Inspection Partial 5/15/2017 05/15/2017
PW-Misc
Informational
05/11/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
05/15/2017
The outside of the building is completed except for the overhang for the entrance to enter the building. They have planted trees and shrubs all around the property, but are not yet completed. They still have some grading and sod and seed to plant.Steve Robbins 05/15/2017 11:54 AM
PW-Misc
Informational
05/11/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
05/11/2017
PW-Misc
Informational
05/11/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
05/11/2017
PW-Misc
Informational
05/11/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
05/11/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
05/11/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
05/11/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
05/11/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
05/11/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
05/11/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
05/11/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
05/11/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
05/11/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
05/11/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
05/11/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
05/11/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
05/11/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
05/11/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
05/11/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
05/11/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
05/11/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
05/11/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
05/11/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
05/11/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
05/11/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
05/11/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
05/11/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
05/11/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
05/11/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
05/11/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
05/11/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
05/11/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
05/11/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
05/11/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
05/11/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
05/11/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
05/11/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
05/11/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
PW-Misc
Informational
05/11/2017
No work outside today, the ground is still very wet from all the rain.Steve Robbins 05/02/2017 12:39 PM
PW-Misc
Informational
05/11/2017
They have been working on the landscaping planting trees and shrubs.Steve Robbins 05/11/2017 7:04 AM
Grading/Excavation/Fill Inspection Partial 5/18/2017 05/18/2017
PW-Misc
Informational
05/15/2017
The outside of the building is completed except for the overhang for the entrance to enter the building. They have planted trees and shrubs all around the property, but are not yet completed. They still have some grading and sod and seed to plant.Steve Robbins 05/15/2017 11:54 AM
PW-Misc
Informational
05/18/2017
They are putting in landscaping and sod, they are just doing some finishing touches on the outside.Steve Robbins 05/18/2017 3:54 PM
PW-Misc
Informational
05/15/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
05/15/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
05/15/2017
PW-Misc
Informational
05/15/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
05/15/2017
PW-Misc
Informational
05/15/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
05/15/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
05/15/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
05/15/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
05/15/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
05/15/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
05/15/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
05/15/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
05/15/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
05/15/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
05/15/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
05/15/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
05/15/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
05/15/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
05/15/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
05/15/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
05/15/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
05/15/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
05/15/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
05/15/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
05/15/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
05/15/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
05/15/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
05/15/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
05/15/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
05/15/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
05/15/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
05/15/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
05/15/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
05/15/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
05/15/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
05/15/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
05/15/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
05/15/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
05/15/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
PW-Misc
Informational
05/15/2017
No work outside today, the ground is still very wet from all the rain.Steve Robbins 05/02/2017 12:39 PM
PW-Misc
Informational
05/15/2017
They have been working on the landscaping planting trees and shrubs.Steve Robbins 05/11/2017 7:04 AM
Grading/Excavation/Fill Inspection Partial 5/23/2017 05/23/2017
PW-Misc
Informational
05/18/2017
They are putting in landscaping and sod, they are just doing some finishing touches on the outside.Steve Robbins 05/18/2017 3:54 PM
PW-Misc
Informational
05/18/2017
The outside of the building is completed except for the overhang for the entrance to enter the building. They have planted trees and shrubs all around the property, but are not yet completed. They still have some grading and sod and seed to plant.Steve Robbins 05/15/2017 11:54 AM
PW-Misc
Informational
05/18/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
05/18/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
05/18/2017
PW-Misc
Informational
05/18/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
05/18/2017
PW-Misc
Informational
05/18/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
05/18/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
05/18/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
05/18/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
05/18/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
05/18/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
05/18/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
05/18/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
05/18/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
05/18/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
05/18/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
05/18/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
05/18/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
05/18/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
05/18/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
05/18/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
05/18/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
05/18/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
05/18/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
05/18/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
05/18/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
05/18/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
05/18/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
05/18/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
05/18/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
05/18/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
05/18/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
05/18/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
05/18/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
05/18/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
05/18/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
05/18/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
05/18/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
05/18/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
05/18/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
PW-Misc
Informational
05/18/2017
No work outside today, the ground is still very wet from all the rain.Steve Robbins 05/02/2017 12:39 PM
PW-Misc
Informational
05/18/2017
They have been working on the landscaping planting trees and shrubs.Steve Robbins 05/11/2017 7:04 AM
PW-Misc
Informational
05/23/2017
I talked to the contractor today and I am going to be getting a list for him to get ready for substantial completion.Steve Robbins 05/23/2017 3:52 PM
Grading/Excavation/Fill Inspection Passed 6/5/2017 06/08/2017
PW-Misc
Informational
06/02/2017
I talked with steve today and they are having the grading done tomorrow that has not been completed yet and they are also going to be puttin down seed and straw. They are having a walk-through on monday.Steve Robbins 06/02/2017 3:43 PM
PW-Misc
Informational
06/02/2017
They are putting in landscaping and sod, they are just doing some finishing touches on the outside.Steve Robbins 05/18/2017 3:54 PM
PW-Misc
Informational
06/02/2017
The outside of the building is completed except for the overhang for the entrance to enter the building. They have planted trees and shrubs all around the property, but are not yet completed. They still have some grading and sod and seed to plant.Steve Robbins 05/15/2017 11:54 AM
PW-Misc
Informational
06/02/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
06/02/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
06/02/2017
PW-Misc
Informational
06/02/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
06/02/2017
PW-Misc
Informational
06/02/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
06/02/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
06/02/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
06/02/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
06/02/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
06/02/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
06/02/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
06/02/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
06/02/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
06/02/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
06/02/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
06/02/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
06/02/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
06/02/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
06/02/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
06/02/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
06/02/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
06/02/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
06/02/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
06/02/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
06/02/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
06/02/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
06/02/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
06/02/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
06/02/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
06/02/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
06/02/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
06/02/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
06/02/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
06/02/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
06/02/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
06/02/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
06/02/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
06/02/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
06/02/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
PW-Misc
Informational
06/02/2017
No work outside today, the ground is still very wet from all the rain.Steve Robbins 05/02/2017 12:39 PM
PW-Misc
Informational
06/02/2017
They have been working on the landscaping planting trees and shrubs.Steve Robbins 05/11/2017 7:04 AM
PW-Misc
Informational
06/02/2017
I talked to the contractor today and I am going to be getting a list for him to get ready for substantial completion.Steve Robbins 05/23/2017 3:52 PM
Grading/Excavation/Fill Inspection Passed 5/31/2017 06/08/2017
PW-Misc
Informational
05/23/2017
They are putting in landscaping and sod, they are just doing some finishing touches on the outside.Steve Robbins 05/18/2017 3:54 PM
PW-Misc
Informational
06/02/2017
I talked with steve today and they are having the grading done tomorrow that has not been completed yet and they are also going to be puttin down seed and straw. They are having a walk-through on monday.Steve Robbins 06/02/2017 3:43 PM
PW-Misc
Informational
05/23/2017
The outside of the building is completed except for the overhang for the entrance to enter the building. They have planted trees and shrubs all around the property, but are not yet completed. They still have some grading and sod and seed to plant.Steve Robbins 05/15/2017 11:54 AM
PW-Misc
Informational
05/23/2017
Nothing going on with the outside today. They are working inside.Steve Robbins 04/24/2017 3:45 PM
PW-Misc
Informational
05/23/2017
Steve Robbins 04/11/2017 4:00 PMStill working inside of the building. They still have some grading and cleanup on the outside.
PW-Misc
Corrective Action Required
05/23/2017
PW-Misc
Informational
05/23/2017
They are working on the inside today, they were also cleaning up on the outside. All the sidewalks on by the building have been installed.Steve Robbins 04/10/2017 3:59 PM
PW-Misc
Corrective Action Required
05/23/2017
PW-Misc
Informational
05/23/2017
Steve Robbins 04/03/2017 3:48 PMNothing was going on due to the rain.
PW-Misc
Informational
05/23/2017
The erosion control is doing good, and nothing was going on today, they were just working inside.Steve Robbins 03/31/2017 2:37 PM
PW-Misc
Informational
05/23/2017
They are working on the inside of the building today.Steve Robbins 03/30/2017 2:46 PM
PW-Misc
Informational
05/23/2017
No work done today due to the rain..Steve Robbins 03/29/2017 2:20 PM
PW-Misc
Informational
05/23/2017
They were pouring a sidewalk under the conopy to the entrance for the building.Steve Robbins 03/28/2017 3:17 PM
PW-Misc
Informational
05/23/2017
They are still working on the outside of the building with stucco and most of the trash has been picked up.Steve Robbins 03/23/2017 4:14 PM
PW-Misc
Informational
05/23/2017
They picked up most of the trash and debri around the building today. It looks much better.Steve Robbins 03/20/2017 4:18 PM
PW-Misc
Informational
05/23/2017
Still putting stucco on the outside of the building.Steve Robbins 03/17/2017 4:13 PM
PW-Misc
Informational
05/23/2017
They are working on the stucco on the outside of the building. They have 3 sides done now.Steve Robbins 03/14/2017 3:39 PM
PW-Misc
Informational
05/23/2017
No work outside today.Steve Robbins 03/13/2017 3:49 PM
PW-Misc
Informational
05/23/2017
They are still installing stucco on the outside of the building and they are still working on picking up trash around the job site.Steve Robbins 03/09/2017 3:31 PM
PW-Misc
Informational
05/23/2017
They are working on the outside of the building putting the stucco on the exterior.Steve Robbins 03/06/2017 3:04 PM
PW-Misc
Informational
05/23/2017
Nothing was going on outside today, still working on the inside of the building.Steve Robbins 03/03/2017 2:53 PM
PW-Misc
Informational
05/23/2017
I talked with Steve the General and he said they will be looking to get a substantial by the end of the month. He also said they are still working on getting the trash picked up around the property and across the street.Steve Robbins 03/02/2017 4:14 PM
PW-Misc
Informational
05/23/2017
They were donig work again on the outside of the building today.Steve Robbins 03/01/2017 4:29 PM
PW-Misc
Informational
05/23/2017
I talked to the contractor about trash around the property, he said he has some new help coming in the next few days and they are going to pick up trash around the property and across the street. Steve Robbins 02/21/2017 2:34 PM
PW-Misc
Informational
05/23/2017
Nothing going on in the parking lot, they are working on the outside of the building.Steve Robbins 02/17/2017 3:12 PM
PW-Misc
Informational
05/23/2017
Today they were doing work on the outside of the building .Steve Robbins 02/16/2017 3:37 PM
PW-Misc
Informational
05/23/2017
Nothing going on in the parking lot or outside of the building today.Steve Robbins 02/15/2017 3:11 PM
PW-Misc
Informational
05/23/2017
Nothing in the parking lot or grading was done today. They are working inside the building.Steve Robbins 02/14/2017 4:15 PM
PW-Misc
Informational
05/23/2017
Today they were pouring some sidewalks around the building.Steve Robbins 02/13/2017 3:32 PM
PW-Misc
Informational
05/23/2017
Nothing done on the outside of the building today.Steve Robbins 02/09/2017 3:59 PM
PW-Misc
Informational
05/23/2017
Working on the inside of the building.Steve Robbins 02/08/2017 2:45 PM
PW-Misc
Informational
05/23/2017
No work outside or in the parking lot was done today.Steve Robbins 02/07/2017 4:06 PM
PW-Misc
Corrective Action Required
05/23/2017
Today they are pouring the concrete around drop off in front of the building. Steve Robbins 02/02/2017 10:49 AM
PW-Misc
Informational
05/23/2017
The parking lot has been installed., there still needs to be grading around the parking lot and the property.Steve Robbins 01/31/2017 8:24 AM
PW-Misc
Informational
05/23/2017
There is still grading to be done, the parking lot is not in yet. They are working on the building. The plan is to get the parking lot in before winter sets in. Steve Robbins 09/14/2016 10:47 AM
PW-Misc
Informational
05/23/2017
Nothing going on today.Steve Robbins 02/01/2017 3:45 PM
PW-Misc
Informational
05/23/2017
They were just working on the building today. Nothing outside.Steve Robbins 02/03/2017 3:29 PM
PW-Misc
Informational
05/23/2017
No grading is going on today. They are working inside the building.Steve Robbins 02/06/2017 2:39 PM
PW-Misc
Informational
05/23/2017
Nothing was going on in or outside the parking lot today, they are still planning on picking up the trash around the work site.Steve Robbins 02/22/2017 3:18 PM
PW-Misc
Informational
05/23/2017
I talked to Steve and he said they will be working on getting things cleaned up outside and working on the grading and the vegetation and landscaping.Steve Robbins 04/14/2017 8:41 AM
PW-Misc
Informational
05/23/2017
I got a call about a backflow preventor for the sp;rikler system as to what kind, I directed them to call the water dept. Steve Robbins 04/20/2017 7:08 AM
PW-Misc
Informational
05/23/2017
It has rained alot today, nothing is going on outside.Steve Robbins 04/26/2017 3:48 PM
PW-Misc
Informational
05/23/2017
They did a little work on the outside of the building today. they still need to do grading and clean-up on the outside.Steve Robbins 04/28/2017 2:39 PM
PW-Misc
Informational
05/23/2017
No work outside today, the ground is still very wet from all the rain.Steve Robbins 05/02/2017 12:39 PM
PW-Misc
Informational
05/23/2017
They have been working on the landscaping planting trees and shrubs.Steve Robbins 05/11/2017 7:04 AM
PW-Misc
Informational
05/23/2017
I talked to the contractor today and I am going to be getting a list for him to get ready for substantial completion.Steve Robbins 05/23/2017 3:52 PM
ESC - (Vegetation/Ground Cover) Partial 12/1/2017 at 7:30 AM 12/01/2017
PW-Misc
Informational
12/01/2017
The grass is coming in but it is not very tall yet, I talked with Ryan and we are giving them final acceptance and I am letting them know they need to make sure it stays established in the spring.Steve Robbins 12/01/2017 7:55 AM
Documents & Images
Date Uploaded File Type Document Name
03/01/2016 Receipt Receipt for transaction: 2016-000563
03/01/2016 Letter PW-Permit
04/18/2016 Letter PW-Daily Inspection Summary
04/25/2016 Letter PW-Daily Inspection Summary
05/04/2016 Letter PW-Daily Inspection Summary
06/01/2016 Letter PW-Daily Inspection Summary
07/06/2016 Letter PW-Daily Inspection Summary
07/08/2016 Letter PW-Daily Inspection Summary
07/11/2016 Letter PW-Daily Inspection Summary
07/13/2016 Letter PW-Site Visit
07/13/2016 Letter PW-Daily Inspection Summary
07/14/2016 Letter PW-Daily Inspection Summary
07/19/2016 Letter PW-Daily Inspection Summary
07/19/2016 Letter PW-Daily Inspection Summary
07/21/2016 Letter PW-Daily Inspection Summary
07/21/2016 Letter PW-Daily Inspection Summary
07/26/2016 Letter PW-Daily Inspection Summary
08/16/2016 Letter PW-Daily Inspection Summary
09/14/2016 Letter PW-Daily Inspection Summary
09/14/2016 Letter PW-Daily Inspection Summary
11/10/2016 Letter PW-Daily Inspection Summary
11/14/2016 Letter PW-Daily Inspection Summary
11/21/2016 Letter PW-Daily Inspection Summary
11/22/2016 Letter PW-Daily Inspection Summary
11/23/2016 Letter PW-Daily Inspection Summary
11/28/2016 Letter PW-Daily Inspection Summary
11/30/2016 Letter PW-Daily Inspection Summary
12/01/2016 Letter PW-Daily Inspection Summary
12/19/2016 Letter PW-Daily Inspection Summary
12/21/2016 Letter PW-Daily Inspection Summary
12/30/2016 Letter PW-Daily Inspection Summary
01/04/2017 Letter PW-Daily Inspection Summary
01/04/2017 Letter PW-Daily Inspection Summary
01/06/2017 Letter PW-Daily Inspection Summary
01/09/2017 Letter PW-Daily Inspection Summary
01/11/2017 Letter PW-Daily Inspection Summary
01/12/2017 Letter PW-Daily Inspection Summary
01/17/2017 Letter PW-Daily Inspection Summary
01/18/2017 Letter PW-Daily Inspection Summary
01/19/2017 Letter PW-Daily Inspection Summary
01/20/2017 Letter PW-Daily Inspection Summary
01/23/2017 Letter PW-Daily Inspection Summary
01/24/2017 Letter PW-Daily Inspection Summary
01/25/2017 Letter PW-Daily Inspection Summary
01/26/2017 Letter PW-Daily Inspection Summary
01/27/2017 Letter PW-Daily Inspection Summary
01/30/2017 Letter PW-Daily Inspection Summary
01/31/2017 Letter PW-Daily Inspection Summary
02/01/2017 Letter PW-Daily Inspection Summary
02/02/2017 Letter PW-Daily Inspection Summary
02/03/2017 Letter PW-Daily Inspection Summary
02/06/2017 Letter PW-Daily Inspection Summary
02/07/2017 Letter PW-Daily Inspection Summary
02/08/2017 Letter PW-Daily Inspection Summary
02/09/2017 Letter PW-Daily Inspection Summary
02/13/2017 Letter PW-Daily Inspection Summary
02/14/2017 Letter PW-Daily Inspection Summary
02/15/2017 Letter PW-Daily Inspection Summary
02/16/2017 Letter PW-Daily Inspection Summary
02/17/2017 Letter PW-Daily Inspection Summary
02/21/2017 Letter PW-Daily Inspection Summary
02/22/2017 Letter PW-Daily Inspection Summary
02/23/2017 Letter PW-Daily Inspection Summary
02/24/2017 Letter PW-Daily Inspection Summary
02/28/2017 Letter PW-Daily Inspection Summary
03/01/2017 Letter PW-Daily Inspection Summary
03/02/2017 Letter PW-Daily Inspection Summary
03/03/2017 Letter PW-Daily Inspection Summary
03/06/2017 Letter PW-Daily Inspection Summary
03/07/2017 Letter PW-Daily Inspection Summary
03/09/2017 Letter PW-Daily Inspection Summary
03/13/2017 Letter PW-Daily Inspection Summary
03/14/2017 Letter PW-Daily Inspection Summary
03/17/2017 Letter PW-Daily Inspection Summary
03/20/2017 Letter PW-Daily Inspection Summary
03/23/2017 Letter PW-Daily Inspection Summary
03/27/2017 Letter PW-Daily Inspection Summary
03/28/2017 Letter PW-Daily Inspection Summary
03/29/2017 Letter PW-Daily Inspection Summary
03/29/2017 Letter PW-Daily Inspection Summary
03/30/2017 Letter PW-Daily Inspection Summary
03/31/2017 Letter PW-Daily Inspection Summary
03/31/2017 Letter PW-Daily Inspection Summary
04/03/2017 Letter PW-Daily Inspection Summary
04/10/2017 Letter PW-Daily Inspection Summary
04/11/2017 Letter PW-Daily Inspection Summary
04/11/2017 Letter PW-Daily Inspection Summary
04/14/2017 Letter PW-Daily Inspection Summary
04/20/2017 Letter PW-Daily Inspection Summary
04/24/2017 Letter PW-Daily Inspection Summary
04/26/2017 Letter PW-Daily Inspection Summary
04/28/2017 Letter PW-Daily Inspection Summary
05/02/2017 Letter PW-Daily Inspection Summary
05/11/2017 Letter PW-Daily Inspection Summary
05/15/2017 Letter PW-Daily Inspection Summary
05/18/2017 Letter PW-Daily Inspection Summary
05/18/2017 Letter PW-Daily Inspection Summary
05/23/2017 Letter PW-Daily Inspection Summary
06/02/2017 Letter PW-Daily Inspection Summary
06/08/2017 Letter PW-Certificate of Substantial Completion Multiple Lot
06/08/2017 Letter PW-Punch List
06/09/2017 Holiday Inn Substantial and punch
12/01/2017 Letter DE-Daily Inspection Summary
12/01/2017 Letter DE-Certificate of Final Acceptance (Commercial)
12/05/2017 Holiday Inn Final Accecptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home