Summary
PRPWFC20141490
Public Works Infrastructure Permit - Commercial
Final Acceptance
BMB HOLDINGS LLC
DEVELOPMENT COMPLETE
06/04/2014
06/04/2014
02/05/2015
Locations
Contacts
MEYER BROTHERS BUILDING COMPANY, Address:800 E 101ST TER STE 120, Phone:(816) 246-4800  
BMB HOLDINGS LLC, Address:8611 S STILLHOUSE RD  
Temp - Stop Construction Company, Address:331 NW Capital Drive  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $84.12 $84.12 Paid 06/09/2014
$84.12
91100C9-Water Insp Fee $816.66 $816.66 Paid 06/09/2014
$816.66
9110072-Water Test Fee $200.00 $200.00 Paid 06/09/2014
$200.00
9110068-Storm Fee $1,117.10 $1,117.10 Paid 06/09/2014
9110081-Paved Surface Inspection Fee $7,497.89 $7,497.89 Paid 06/09/2014
9110071-Site Grading Fee $939.38 $939.38 Paid 06/09/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer - Wye / Insert-A-Tee Installation Passed 6/16/2014 at 12:00 AM 06/17/2014
Sanitary Sewer Construction Inspection Passed 06/17/2014
Grading/Excavation/Fill Inspection Passed/Re-Inspect 6/10/2014 at 12:00 AM 06/26/2014
PW-Subgrade Inspection
Corrective Action Required
06/26/2014
A little short on 4" rock. Please add more 4" rock in the futher.
Water Line - Construction Inspection Partial 6/17/2014 at 12:00 AM 06/30/2014
PW-Misc
Corrective Action Required
06/30/2014
Grading/Excavation/Fill Inspection Partial 6/23/2014 at 12:00 AM 07/10/2014
Water Line - Construction Inspection Partial 07/17/2014
PW-Main inspection
Corrective Action Required
07/17/2014
okay to backfill. Continuing main installation from building towards tie in location.
Storm - Pipe Partial 07/22/2014
Storm Sewer Construction Inspection Partial 7/22/2014 at 10:00 AM 07/22/2014
Storm Sewer Construction Inspection Partial 7/22/2014 at 3:30 PM 07/23/2014
PW-Misc
Corrective Action Required
07/23/2014
Laid more storm, pour collars tomorrow.
Storm Sewer Construction Inspection Partial 7/24/2014 at 12:00 PM 07/24/2014
PW-Misc
Corrective Action Required
07/23/2014
Laid more storm, pour collars tomorrow.
PW-Misc
Corrective Action Required
07/24/2014
poured all collars and inverts, except two inverts laid storm line
Backflow Preventer and Vault Partial 07/31/2014
PW-Misc
Informational
07/31/2014
installed water backflow vault
Erosion Control Inspection Failed 08/18/2014
PW-Erosion and Sediment Control
Corrective Action Required
08/18/2014
Your project is in violation of the Erosion and Sediment control policy. Please make repairs to the sitl fence along Independence where water storm line was installed.
Water Line - Construction Inspection Passed 08/20/2014
PW-Main inspection
Corrective Action Required
07/17/2014
okay to backfill. Continuing main installation from building towards tie in location.
Fire Line - Hydrostatic Test Passed 8/20/2014 at 12:00 AM 08/20/2014
Storm Sewer Construction Inspection Passed 08/20/2014
PW-Misc
Corrective Action Required
07/24/2014
Laid more storm, pour collars tomorrow.
PW-Misc
Corrective Action Required
07/24/2014
poured all collars and inverts, except two inverts laid storm line
Backflow Preventer and Vault Partial 8/1/2014 at 12:00 AM 08/20/2014
PW-Misc
Informational
07/31/2014
installed water backflow vault
PW-Misc
Corrective Action Required
08/20/2014
Waiting for backflow test results
Water Line - Coliform Test 1 Passed 8/20/2014 at 12:00 AM 08/22/2014
Water Line - Coliform Test 2 Passed 8/21/2014 at 10:30 AM 09/18/2014
Driveway Inspection Passed 9/16/2014 at 12:00 AM 09/18/2014
Fire Line - Flush Passed 8/15/2014 at 12:00 AM 12/19/2014
Corrective Action Required
12/19/2014
Flushed line for 25 min. from blow off.
Storm - Inlets Clean Passed 12/22/2014
Grading/Excavation/Fill Inspection Passed 12/22/2014
Site Visit Complete 12/22/2014
PW-Misc
Corrective Action Required
07/10/2014
Delivered plans to Shawn
Erosion Control Inspection Passed 12/22/2014
PW-Erosion and Sediment Control
Corrective Action Required
08/18/2014
Your project is in violation of the Erosion and Sediment control policy. Please make repairs to the sitl fence along Independence where water storm line was installed.
Backflow Preventer and Vault Passed 12/22/2014
PW-Misc
Informational
08/20/2014
installed water backflow vault
PW-Misc
Corrective Action Required
08/20/2014
Waiting for backflow test results
Water Line - Coliform Test 1 Passed 12/22/2014
Water Line - Coliform Test 2 Passed 12/22/2014
Site Visit Complete 12/22/2014
PW-Misc
Corrective Action Required
07/10/2014
Delivered plans to Shawn
Curb - Proof Roll Passed 12/22/2014
Proof roll parking lot Passed 12/22/2014
ESC - (Vegetation/Ground Cover) Passed 12/22/2014
Documents & Images
Date Uploaded File Type Document Name
06/04/2014 Letter PW-Permit
06/13/2014 Ordinance development agreement.pdf
06/13/2014 Plans Frontier Justice FDP.pdf
06/30/2014 Letter PW-Daily Inspection Summary.pdf
07/10/2014 Letter PW-Daily Inspection Summary
07/17/2014 Letter PW-Daily Inspection Summary
07/23/2014 Letter PW-Daily Inspection Summary
07/24/2014 Letter PW-Daily Inspection Summary
07/31/2014 Letter PW-Daily Inspection Summary
08/18/2014 Letter PW-Daily Inspection Summary
09/12/2014 Letter PW-Daily Inspection Summary
09/12/2014 Letter PW-Daily Inspection Summary
09/12/2014 Letter PW-Daily Inspection Summary
09/12/2014 Letter PW-Daily Inspection Summary
09/18/2014 Frontier Justice Driveway Approach
09/18/2014 Letter PW-Daily Inspection Summary
12/19/2014 Letter PW-Daily Inspection Summary
12/22/2014 Letter PW-Certificate of Substantial Completion Single Lot
12/23/2014 Frontier Justice Certificate of Substantial Completion
02/05/2015 Letter PW-Final Acceptance Commercial
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home