Permit Application Status

PRPWFC20130938


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRPWFC20130938
Public Works Infrastructure Permit - Commercial
Final Acceptance
SAINT LUKES EAST HOSPITAL
DEVELOPMENT COMPLETE
Saint Luke's East Inner Parking Lot and Water Line Improvements
05/16/2013
12/17/2013
Locations
Contacts
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
ACI BOLAND - KANSAS CITY, Address:1421 E 104TH STREET  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $1,548.00 $1,548.00 Paid 05/16/2013
$1,548.00
9110072-Water Test Fee $100.00 $100.00 Paid 05/16/2013
$100.00
9110068-Storm Fee $2,796.45 $2,796.45 Paid 05/16/2013
$2,796.45
9110081-Paved Surface Inspection Fee $29,056.59 $29,056.59 Paid 05/16/2013
$29,056.59
9110071-Site Grading Fee $17.96 $17.96 Paid 05/16/2013
$17.96
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Backflow Preventer and Vault Passed/Re-Inspect 5/20/2013 at 12:00 AM 05/21/2013
Water Line - Construction Inspection Passed/Re-Inspect 6/3/2013 at 12:00 AM 05/22/2013
Fire Line - Hydrostatic Test Passed 6/3/2013 at 12:00 AM 06/04/2013
Water Line - Construction Inspection Passed 6/4/2013 at 12:00 AM 06/04/2013
Backflow Preventer and Vault Passed 5/15/2013 at 12:00 AM 06/04/2013
Fire Line - Flush Passed 6/14/2013 at 12:00 AM 07/12/2013
Storm - Pipe Passed 7/12/2013 at 12:00 AM 07/12/2013
Storm Sewer Construction Inspection Passed/Re-Inspect 7/10/2013 at 12:00 AM 07/12/2013
Erosion Control Inspection Passed/Re-Inspect 7/11/2013 at 12:00 AM 07/12/2013
Retaining Wall Inspection Partial 7/18/2013 at 12:00 AM 07/18/2013
Erosion Control Inspection Passed/Re-Inspect 7/18/2013 at 12:00 AM 07/18/2013
Pavement-Proof Roll Passed 07/25/2013
Curb - Proof Roll Passed 07/25/2013
Retaining Wall Inspection Passed 7/22/2013 at 12:00 AM 07/25/2013
Erosion Control Inspection Passed/Re-Inspect 8/8/2013 at 12:00 AM 08/08/2013
Site Visit Complete 8/8/2013 at 12:00 AM 08/08/2013
Storm Sewer Construction Inspection Passed/Re-Inspect 8/14/2013 at 12:00 AM 08/14/2013
Grading/Excavation/Fill Inspection Passed 08/28/2013
Storm Sewer Construction Inspection Passed 08/28/2013
Erosion Control Inspection Passed 08/28/2013
Storm Sewer Construction Inspection Passed 08/28/2013
ESC Devices Installed Complete 08/29/2013
Pavement-Surface Passed/Re-Inspect 10/03/2013
Street - Surface Course Passed/Re-Inspect 10/03/2013
Storm - Inlets Clean Passed 10/22/2013 at 12:00 AM 10/22/2013
Street - Wedge Lift Passed 10/16/2013 at 12:00 AM 10/22/2013
Pavement-Surface Passed 10/16/2013 at 12:00 AM 10/22/2013
Street - Surface Course Passed 10/17/2013 at 12:00 AM 10/22/2013
Water Line - Construction Inspection Passed 7/17/2013 at 12:00 AM 10/22/2013
Storm Sewer Construction Inspection Passed 10/1/2013 at 12:00 AM 10/22/2013
ESC - (Vegetation/Ground Cover) Passed 12/17/2013
Documents & Images
Date Uploaded File Type Document Name
05/16/2013 Letter PW-Permit
05/21/2013 Activity Document Saint Luke's East Parking Lot and Water PW Permit.pdf
10/22/2013 Letter PW-Punch List
10/23/2013 Letter substantial
10/23/2013 Letter punch
12/17/2013 Letter PW-Final Acceptance Commercial
12/17/2013 Saint Luke's East Inner Parking Lot and Water Line Improvements Certificate of Final Acceptance.pdf
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home