PRPWFC20120373
Public Works Infrastructure Permit - Commercial
Final Acceptance
HY-VEE INC
DEVELOPMENT COMPLETE
Hy - Vee Gas Station Roadway Modification @ 3rd St. and Oldham Parkway
03/06/2012
11/26/2012
11/27/2012
Locations
Contacts
Not shown for privacy reasons.
HY-VEE INC, Address:5820 WESTOWN PKWY  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $1,309.50 $1,309.50 Paid 03/06/2012
9110072-Water Test Fee $800.00 $800.00 Paid 03/06/2012
9110081-Paved Surface Inspection Fee $5,123.91 $5,123.91 Paid 03/06/2012
9110071-Site Grading Fee $526.04 $526.04 Paid 03/06/2012
9110069-After Hours Inspections (Public Works)(Per Hour) $1,629.09 $1,629.09 Paid 10/16/2012
$1,629.09
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Complete 7/3/2012 at 12:00 AM 07/03/2012
Water Line - Construction Inspection Passed 7/20/2012 at 12:00 AM 07/09/2012
Water Line - Construction Inspection Passed/Re-Inspect 7/16/2012 at 12:00 AM 07/17/2012
Water Line - Construction Inspection Passed/Re-Inspect 7/17/2012 at 12:00 AM 07/17/2012
Water Line - Construction Inspection Passed/Re-Inspect 7/18/2012 at 12:00 AM 07/19/2012
Water Line - Construction Inspection Passed/Re-Inspect 7/19/2012 at 12:00 AM 07/19/2012
Water Line - Hydrostatic Test Passed 7/23/2012 at 12:00 AM 07/23/2012
Water Service Inspection Passed 7/23/2012 at 12:00 AM 07/23/2012
Commercial Curb Inspection Passed/Re-Inspect 7/24/2012 at 12:00 AM 07/24/2012
Water Line - Coliform Test 2 Passed 7/27/2012 at 12:00 AM 07/27/2012
Water Line - Coliform Test 1 Failed 7/24/2012 at 12:00 AM 07/27/2012
Water Line - Coliform Test 1 Passed 7/25/2012 at 12:00 AM 07/27/2012
Water Line - Construction Inspection Passed 7/31/2012 at 12:00 AM 07/31/2012
Site Visit Complete 8/1/2012 at 12:00 AM 08/01/2012
Water Line - Construction Inspection Passed 8/1/2012 at 12:00 AM 08/01/2012
Pavement-Aggregate Base Passed 8/2/2012 at 12:00 AM 08/02/2012
Pavement-Aggregate Base Passed 8/3/2012 at 12:00 AM 08/03/2012
Pavement-Stabilized Subgrade Passed/Re-Inspect 8/4/2012 at 12:00 AM 08/04/2012
Pavement-Aggregate Base Passed 8/6/2012 at 12:00 AM 08/06/2012
Pavement-Surface Passed/Re-Inspect 8/7/2012 at 12:00 AM 08/07/2012
Curb - Proof Roll Passed 8/8/2012 at 12:00 AM 08/09/2012
Curb - Compression Strength Passed/Re-Inspect 8/9/2012 at 12:00 AM 08/09/2012
Commercial Curb Inspection Passed/Re-Inspect 8/10/2012 at 12:00 AM 08/10/2012
Commercial Curb Inspection Passed 8/11/2012 at 12:00 AM 08/11/2012
Commercial Curb Inspection Passed 8/13/2012 at 12:00 AM 08/13/2012
Sidewalk Inspection Passed 8/14/2012 at 12:00 AM 08/14/2012
Commercial Curb Inspection Passed 8/14/2012 at 12:00 AM 08/14/2012
Street - Wedge Lift Passed 8/15/2012 at 12:00 AM 08/15/2012
ADA Inspection Failed 8/21/2012 at 12:00 AM 08/22/2012
ADA Inspection Passed 8/22/2012 at 12:00 AM 08/24/2012
ADA Inspection Passed 8/23/2012 at 12:00 AM 08/24/2012
Street - Surface Course Passed 8/23/2012 at 12:00 AM 08/24/2012
Sidewalk Inspection Passed 8/24/2012 at 12:00 AM 08/24/2012
Street - Striping Passed 8/24/2012 at 12:00 AM 08/24/2012
Sidewalk Inspection Passed 8/27/2012 at 12:00 AM 08/28/2012
Site Visit Complete 8/27/2012 at 12:00 AM 08/28/2012
Verify Substantial Completion Substantial Completion 8/27/2012 at 12:00 AM 08/28/2012
Sidewalk Inspection Passed 8/29/2012 at 12:00 AM 08/30/2012
Site Visit Complete 9/12/2012 at 12:00 AM 09/13/2012
Site Visit Complete 9/14/2012 at 12:00 AM 09/14/2012
Documents & Images
Date Uploaded File Type Document Name
03/06/2012 20120306134608419.pdf
03/06/2012 Letter Public Works Permit
08/28/2012 DOC082812-08282012132817.pdf
08/30/2012 DOC083012-08302012095820.pdf
10/16/2012 DOC101612-10162012112833.pdf
11/27/2012 "Final Acceptance
08/29/2013 Letter PW-Punch List
08/29/2013 Letter PW-Punch List
08/29/2013 Letter PW-Final Acceptance Commercial
08/29/2013 Letter PW-Punch List
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home