Permit Application Status

PRFW20130588


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRFW20130588
Fireworks Permit
Closed
DACUR INVESTMENT COMPANY INC
Fireworks
HILLCREST MINISTRIES
04/09/2013
03/02/2020
Locations
Contacts
DACUR INVESTMENT COMPANY INC, Address:2700 KENDALLWOOD PKWY # 208  
HILLCREST MINISTRIES, Address:24109 POINDEXTER, Phone:(816) 803-8577  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review (FW) Approved 04/26/2013 06/11/2013
Hector Soto Jr.
Corrective Action Required
06/11/2013

SIGNAGE. A 12" x 12" sign reciting the identify of the licensee (not-for-profit organization) shall be posted near the cash register or checkout. Sales will not be allowed until all required signage is posted as required.
Corrective Action Required
06/11/2013

APPROVED. A business license shall be obtained from the City of Lee's Summit Finance Department. Additionally, a cash deposit, performance bond, letter of credit or other security approved in content and form by the City Attorney in the face amount of $1,000 shall be provided to the Finance Department no later than June 17th.
Planning Review (FW) Corrections 04/26/2013 04/29/2013
Hector Soto Jr.
Corrective Action Required
04/29/2013

STATE PERMIT. A copy of an approved Seasonal Retailer permit issued by the State shall be provided prior to the approval of this sales permit application.
Corrective Action Required
04/29/2013

SIGNAGE. A 12" x 12" sign reciting the identity of the licensee (not-for-profit organization) shall be posted near the cash register or checkout. Provide a document stating that this required signage will be provided.
Fire Codes Review (FW) Approved 04/26/2013 04/25/2013
Jim Eden
Misc
Corrective Action Required
04/25/2013

The set-up and use of a Seasonal Retail Fireworks Tent shall comply with the Chapter 13 - Fire Prevention and Protection, of the Code of Ordinances of the City of Lee's Summit, Article III Fire Code, Section 13-44 Same Amendments, and Missouri Fireworks Statutes. All tents will receive an initial site inspection before being allowed to stock, and a second inspection of stocked product before being allowed to open to the public.
Misc
Resolved
06/13/2013

Provide a copy of the Fireworks License Seasonal Permit from Missouri DFS when it is received.
Misc
Corrective Action Required
04/25/2013

The generator shall be a minimum of 20' from the tent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Fireworks Sales Permit Application Fee $275.00 $275.00 Paid 04/09/2013
$275.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
04/15/2013 Letter Routing Sheet - FW
04/29/2013 Letter Applicant Letter - FW (DFW)
06/11/2013 Letter Applicant Letter - FW (DFW)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home