Permit Application Status

PRCOMCOM20180266


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOMCOM20180266
Building Permit - Commercial
Final Completion
SUMMIT WOODS SPE LLC
CHANGE OF TENANT
TENANT FINISH FOR NAIL SALON
02/06/2018
02/26/2018
08/11/2018
04/30/2019
Locations
Contacts
SUMMIT WOODS SPE LLC, Address:1 E WASHINGTON ST STE 300  
SDC ENGINEERING, Address:5907 RAYTOWN TFWY, Phone:(816) 356-1445  
ABLE ELECTRIC, Address:P O BOX 34505, Phone:(816) 506-0496  
SAM'Z HEATING & COOLING, Address:P O BOX 12593, Phone:(913) 710-9861  
KMZC PLUMBING, Address:301 W WEA, Phone:(913) 238-2583  
ABC CONSTRUCTION, Address:9216 NALL AVE, Phone:(913) 375-7063  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 04/09/2018
Joe Dir
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
04/09/2018

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. ACTION REQUIRED:(veriifed at inspection) The existing fire sprinkler riser shall be current with all maintenance. A current service tag shall be posted on the systems riser.
Misc
Corrective Action Required
04/09/2018

Storeage room ACTION REQUIRED:(veriifed at inspection) Drawinfs show a head against a wall in the storeage room All heads shall be a minimum of 4" off a wall.
Licensed Contractors Approved 02/20/2018 02/26/2018
Development Center
LC - General Contractor
Resolved
02/21/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/20/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 2/21/18 - acknowledged
Fire Plan Review Approved with Conditions 02/27/2018 02/21/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
02/20/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for approval of any modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
02/20/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) fire sprinkler system will need to be dropped below the gypsum board ceiling. Have the fire sprinkler system contractor provide shop drawings for approval of any modifications to be done to the fire sprinkler system.
Portable fire extinguishers - general
Corrective Action Required
02/20/2018

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide an minimum of two 2A-10BC fire extinguishers. Fire extinguishers to be mounted on a normal path of travel close to exits.
Misc
Corrective Action Required
02/20/2018

Door operation ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side of an exit [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Misc
Resolved
02/21/2018

Exiting through storage area ACTION REQUIRED:Remove exit signage from the door leading into the storage area/room [B] 1014.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. 1. Egress from a room or space shall not pass through adjoining or intervening rooms or areas, except where such adjoining rooms or areas and the area served are accessory to one or the other, are not a Group H occupancy and provide a discernible path of egress travel to an exit. Exception: Means of egress are not prohibited through adjoining or intervening rooms or spaces in a Group H, S or F occupancy when the adjoining or intervening rooms or spaces are the same or a lesser hazard occupancy group. 2. An exit access shall not pass through a room that can be locked to prevent egress. 3. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas, toilet rooms or bathrooms 4. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes
Installation acceptance testing
Corrective Action Required
02/20/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Modification done to the fire alarm system will required acceptance testing prior to the final occupancy inspection. Contact the fire department to schedule testing.(816)969-1300.
Misc
Corrective Action Required
02/26/2018

Egress Illumination: ACTION REQUIRED: (verified at inspection) Add additional emergency lighting to the exterior of each exit. [B] 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. [B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits
Building Plan Review Approved 02/27/2018 02/21/2018
Joe Frogge
License Tax Application
Resolved
02/21/2018

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Resolved
02/21/2018

2012 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. In Group I-3 occupancy visiting areas at least 5 percent, but not less than one, cubicle or counter shall be accessible on both the visitor and detainee sides. ICC A117.1-2009 Section 305.3 Size. The clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Provide required number of accessible pedicure stations.
Bldg - Toilet room wall finish 1210.2.2
Resolved
02/21/2018

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant finishes at mop sink and toilets.
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Resolved
02/21/2018

2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Specify maximum height of reception desks.
Bldg - Egress through intervening spaces 1014.2
Resolved
02/21/2018

2012 IBC 1014.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section.Item 4. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Modify design in such a manner that egress will not be directed through storage room.
Misc
Resolved
02/21/2018

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1 and 2) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. (see code for items 4 and 5) Action required. Exhaust terminations appear to discharge into adjacent tenant space. Clarify.
Misc
Resolved
02/21/2018

Restroom exhaust fans share common duct. Action required: Provide backdraft protection at restroom exhaust fans.
Security Code
Corrective Action Required
05/03/2019

The work authorized by this permit shall be constructed to comply with the Security Code provisions. (Chapter 7, Article 14 of the Lees Summit Code of Ordinances)
Fire Plan Review Rejected 02/16/2018 02/09/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
02/09/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: Have the fire alarm system contractor provide shop drawings for approval of any modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
02/09/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) fire sprinkler system will need to be dropped below the gypsum board ceiling. Have the fire sprinkler system contractor provide shop drawings for approval of any modifications to be done to the fire sprinkler system.
Portable fire extinguishers - general
Corrective Action Required
02/09/2018

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide an minimum of two 2A-10BC fire extinguishers. Fire extinguishers to be mounted on a normal path of travel close to exits.
Misc
Corrective Action Required
02/09/2018

Door operation ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side of an exit [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Misc
Corrective Action Required
02/09/2018

Exiting through storage area ACTION REQUIRED:Remove exit signage from the door leading into the storage area/room [B] 1014.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. 1. Egress from a room or space shall not pass through adjoining or intervening rooms or areas, except where such adjoining rooms or areas and the area served are accessory to one or the other, are not a Group H occupancy and provide a discernible path of egress travel to an exit. Exception: Means of egress are not prohibited through adjoining or intervening rooms or spaces in a Group H, S or F occupancy when the adjoining or intervening rooms or spaces are the same or a lesser hazard occupancy group. 2. An exit access shall not pass through a room that can be locked to prevent egress. 3. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas, toilet rooms or bathrooms 4. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes
Installation acceptance testing
Corrective Action Required
02/09/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Modification done to the fire alarm system will required acceptance testing prior to the final occupancy inspection. Contact the fire department to schedule testing.(816)969-1300.
Misc
Corrective Action Required
02/09/2018

Egress Illumination: ACTION REQUIRED:Illuminate the interior and exterior of all maked exits [B] 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. [B] 1006.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits
Building Plan Review Rejected 02/16/2018 02/08/2018
Joe Frogge
License Tax Application
Corrective Action Required
02/08/2018

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
02/08/2018

2012 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. In Group I-3 occupancy visiting areas at least 5 percent, but not less than one, cubicle or counter shall be accessible on both the visitor and detainee sides. ICC A117.1-2009 Section 305.3 Size. The clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Provide required number of accessible pedicure stations.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
02/08/2018

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant finishes at mop sink and toilets.
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Corrective Action Required
02/08/2018

2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Specify maximum height of reception desks.
Bldg - Egress through intervening spaces 1014.2
Corrective Action Required
02/08/2018

2012 IBC 1014.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section.Item 4. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Modify design in such a manner that egress will not be directed through storage room.
Misc
Corrective Action Required
02/08/2018

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1 and 2) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. (see code for items 4 and 5) Action required. Exhaust terminations appear to discharge into adjacent tenant space. Clarify.
Misc
Corrective Action Required
02/08/2018

Restroom exhaust fans share common duct. Action required: Provide backdraft protection at restroom exhaust fans.
Licensed Contractors Rejected 02/16/2018 02/08/2018
Joe Frogge
LC - General Contractor
Corrective Action Required
02/08/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/08/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $204.25 $204.25 Paid 02/26/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Failed 7/25/2018 07/25/2018
Misc
Corrective Action Required
07/25/2018
NO INSPECTION- UNCOVER AND INSTALL PER CODE
In-wall Inspection Failed 7/25/2018 07/25/2018
Misc
Corrective Action Required
07/25/2018
- UNDER SLAB PLUMBING NOT INSPECTED. UNCOVER AND RECALL FOR INSPECTION - INSTALL PLUMBING PER CODE. VENTING AND SUPPORT UNDER SLAB . - SUPPORT AND SECURE WATER PIPING. - SUPPORT AND SECURE MC CABLE. - MECHANICALLY TIE ALL GROUNDS AND BOND METAL BOXES. - NAIL STATION VENTING NOT INSTALLED REVISE PLANS TO SHOW LOCATION CHANGE. DO NOT COVER
In-wall Inspection Passed 7/31/2018 7/31/2018 at 11:56 AM 07/31/2018
Misc
Resolved
07/31/2018
- UNDER SLAB PLUMBING NOT INSPECTED. UNCOVER AND RECALL FOR INSPECTION - INSTALL PLUMBING PER CODE. VENTING AND SUPPORT UNDER SLAB . - SUPPORT AND SECURE WATER PIPING. - SUPPORT AND SECURE MC CABLE. - MECHANICALLY TIE ALL GROUNDS AND BOND METAL BOXES. - NAIL STATION VENTING NOT INSTALLED REVISE PLANS TO SHOW LOCATION CHANGE. DO NOT COVER
Underslab Plumbing Inspection - Commercial Passed 7/31/2018 7/31/2018 at 11:50 AM 07/31/2018
Misc
Resolved
07/31/2018
NO INSPECTION- UNCOVER AND INSTALL PER CODE
Final Inspection - Commercial Passed 4/30/2019 at 9:15 AM 04/30/2019
Documents & Images
Date Uploaded File Type Document Name
02/09/2018 Letter Fire Building Plan Review
02/12/2018 Letter Codes P/R Corrections Document
02/21/2018 Letter Fire Building Plan Review
02/26/2018 Letter Fire Building Plan Review
02/26/2018 Receipt Receipt for transaction: 2018-000675
02/26/2018 Letter Codes Plan Review Conditions
02/26/2018 Letter Codes Building Permit
04/09/2018 Letter Fire (Sprinkler) Plan Review
07/25/2018 Letter Inspection Summary
07/31/2018 Letter Inspection Summary
04/30/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home