Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
|
04/09/2018
|
|
Joe Dir
|
|
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed.
ACTION REQUIRED:(veriifed at inspection)
The existing fire sprinkler riser shall be current with all maintenance. A current service tag shall be posted on the systems riser.
|
|
Misc
Corrective Action Required
Storeage room
ACTION REQUIRED:(veriifed at inspection)
Drawinfs show a head against a wall in the storeage room
All heads shall be a minimum of 4" off a wall.
|
|
|
Licensed Contractors
|
Approved
|
02/20/2018
|
02/26/2018
|
|
Development Center
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
2/21/18 - acknowledged
|
|
|
Fire Plan Review
|
Approved with Conditions
|
02/27/2018
|
02/21/2018
|
|
Joe Dir
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
ACTION REQUIRED:(information purposes)
Have the fire alarm system contractor provide shop drawings for approval of any modifications to be done to the fire alarm system.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
fire sprinkler system will need to be dropped below the gypsum board ceiling.
Have the fire sprinkler system contractor provide shop drawings for approval of any modifications to be done to the fire sprinkler system.
|
|
Portable fire extinguishers - general
Corrective Action Required
2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
ACTION REQUIRED:(verified at inspection)
Provide an minimum of two 2A-10BC fire extinguishers. Fire extinguishers to be mounted on a normal path of travel close to exits.
|
|
Misc
Corrective Action Required
Door operation
ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side of an exit
[B] 1008.1.9 Door operations. Except as specifically permitted
by this section egress doors shall be readily openable
from the egress side without the use of a key or
special knowledge or effort.
|
|
Misc
Exiting through storage area
ACTION REQUIRED:Remove exit signage from the door leading into the storage area/room
[B] 1014.2 Egress through intervening spaces. Egress
through intervening spaces shall comply with this section.
1. Egress from a room or space shall not pass through
adjoining or intervening rooms or areas, except where
such adjoining rooms or areas and the area served are
accessory to one or the other, are not a Group H occupancy
and provide a discernible path of egress travel to
an exit.
Exception: Means of egress are not prohibited
through adjoining or intervening rooms or spaces in
a Group H, S or F occupancy when the adjoining or
intervening rooms or spaces are the same or a lesser
hazard occupancy group.
2. An exit access shall not pass through a room that can be
locked to prevent egress.
3. Means of egress from dwelling units or sleeping areas
shall not lead through other sleeping areas, toilet rooms
or bathrooms
4. Egress shall not pass through kitchens, storage rooms,
closets or spaces used for similar purposes
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:(information purposes)
Modification done to the fire alarm system will required acceptance testing prior to the final occupancy inspection. Contact the fire department to schedule testing.(816)969-1300.
|
|
Misc
Corrective Action Required
Egress Illumination:
ACTION REQUIRED: (verified at inspection) Add additional emergency lighting to the exterior of each exit.
[B] 1006.1 Illumination required. The means of egress,
including the exit discharge, shall be illuminated at all times
the building space served by the means of egress is occupied.
[B] 1006.3 Emergency power for illumination. The power
supply for means of egress illumination shall normally be
provided by the premises’ electrical supply.
In the event of power supply failure, an emergency electrical
system shall automatically illuminate all of the following
areas:
1. Aisles and unenclosed egress stairways in rooms and
spaces that require two or more means of egress.
2. Corridors, interior exit stairways and ramps and exit
passageways in buildings required to have two or more
exits.
3. Exterior egress components at other than their levels of
exit discharge until exit discharge is accomplished for
buildings required to have two or more exits
|
|
|
Building Plan Review
|
Approved
|
02/27/2018
|
02/21/2018
|
|
Joe Frogge
|
|
License Tax Application
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
|
|
Misc
2012 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. In Group I-3 occupancy visiting areas at least 5 percent, but not less than one, cubicle or counter shall be accessible on both the visitor and detainee sides.
ICC A117.1-2009 Section 305.3 Size. The clear floor space shall be 48 inches minimum in length and 30 inches minimum in width.
Action required: Provide required number of accessible pedicure stations.
|
|
Bldg - Toilet room wall finish 1210.2.2
2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
Action required: Specify compliant finishes at mop sink and toilets.
|
|
Bldg - Accessibility - Point of sales and service counters 1109.12.3
2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed.
Action required: Specify maximum height of reception desks.
|
|
Bldg - Egress through intervening spaces 1014.2
2012 IBC 1014.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section.Item 4. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions)
Action required: Modify design in such a manner that egress will not be directed through storage room.
|
|
Misc
2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances:
(see code for items 1 and 2)
3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious.
(see code for items 4 and 5)
Action required. Exhaust terminations appear to discharge into adjacent tenant space. Clarify.
|
|
Misc
Restroom exhaust fans share common duct.
Action required: Provide backdraft protection at restroom exhaust fans.
|
|
Security Code
Corrective Action Required
The work authorized by this permit shall be constructed to comply with the Security Code provisions. (Chapter 7, Article 14 of the Lees Summit Code of Ordinances)
|
|
|
Fire Plan Review
|
Rejected
|
02/16/2018
|
02/09/2018
|
|
Joe Dir
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
ACTION REQUIRED:
Have the fire alarm system contractor provide shop drawings for approval of any modifications to be done to the fire alarm system.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
fire sprinkler system will need to be dropped below the gypsum board ceiling.
Have the fire sprinkler system contractor provide shop drawings for approval of any modifications to be done to the fire sprinkler system.
|
|
Portable fire extinguishers - general
Corrective Action Required
2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
ACTION REQUIRED:(verified at inspection)
Provide an minimum of two 2A-10BC fire extinguishers. Fire extinguishers to be mounted on a normal path of travel close to exits.
|
|
Misc
Corrective Action Required
Door operation
ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side of an exit
[B] 1008.1.9 Door operations. Except as specifically permitted
by this section egress doors shall be readily openable
from the egress side without the use of a key or
special knowledge or effort.
|
|
Misc
Corrective Action Required
Exiting through storage area
ACTION REQUIRED:Remove exit signage from the door leading into the storage area/room
[B] 1014.2 Egress through intervening spaces. Egress
through intervening spaces shall comply with this section.
1. Egress from a room or space shall not pass through
adjoining or intervening rooms or areas, except where
such adjoining rooms or areas and the area served are
accessory to one or the other, are not a Group H occupancy
and provide a discernible path of egress travel to
an exit.
Exception: Means of egress are not prohibited
through adjoining or intervening rooms or spaces in
a Group H, S or F occupancy when the adjoining or
intervening rooms or spaces are the same or a lesser
hazard occupancy group.
2. An exit access shall not pass through a room that can be
locked to prevent egress.
3. Means of egress from dwelling units or sleeping areas
shall not lead through other sleeping areas, toilet rooms
or bathrooms
4. Egress shall not pass through kitchens, storage rooms,
closets or spaces used for similar purposes
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:(information purposes)
Modification done to the fire alarm system will required acceptance testing prior to the final occupancy inspection. Contact the fire department to schedule testing.(816)969-1300.
|
|
Misc
Corrective Action Required
Egress Illumination:
ACTION REQUIRED:Illuminate the interior and exterior of all maked exits
[B] 1006.1 Illumination required. The means of egress,
including the exit discharge, shall be illuminated at all times
the building space served by the means of egress is occupied.
[B] 1006.3 Emergency power for illumination. The power
supply for means of egress illumination shall normally be
provided by the premises’ electrical supply.
In the event of power supply failure, an emergency electrical
system shall automatically illuminate all of the following
areas:
1. Aisles and unenclosed egress stairways in rooms and
spaces that require two or more means of egress.
2. Corridors, interior exit stairways and ramps and exit
passageways in buildings required to have two or more
exits.
3. Exterior egress components at other than their levels of
exit discharge until exit discharge is accomplished for
buildings required to have two or more exits
|
|
|
Building Plan Review
|
Rejected
|
02/16/2018
|
02/08/2018
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
|
|
Misc
Corrective Action Required
2012 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. In Group I-3 occupancy visiting areas at least 5 percent, but not less than one, cubicle or counter shall be accessible on both the visitor and detainee sides.
ICC A117.1-2009 Section 305.3 Size. The clear floor space shall be 48 inches minimum in length and 30 inches minimum in width.
Action required: Provide required number of accessible pedicure stations.
|
|
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
Action required: Specify compliant finishes at mop sink and toilets.
|
|
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Corrective Action Required
2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed.
Action required: Specify maximum height of reception desks.
|
|
Bldg - Egress through intervening spaces 1014.2
Corrective Action Required
2012 IBC 1014.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section.Item 4. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions)
Action required: Modify design in such a manner that egress will not be directed through storage room.
|
|
Misc
Corrective Action Required
2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances:
(see code for items 1 and 2)
3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious.
(see code for items 4 and 5)
Action required. Exhaust terminations appear to discharge into adjacent tenant space. Clarify.
|
|
Misc
Corrective Action Required
Restroom exhaust fans share common duct.
Action required: Provide backdraft protection at restroom exhaust fans.
|
|
|
Licensed Contractors
|
Rejected
|
02/16/2018
|
02/08/2018
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|