Permit Application Status

PRCOM20260453


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20260453
Building Permit - Commercial
Approved
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
SAINT LUKES EAST - ONCOLOGY AND INFUSION CENTER. REMODEL AND EXPANSION OF EXISTING ONCOLOGY CLINIC AND INFUSION CENTER ON THE 5TH FLOOR
02/03/2026
08/17/2026
Locations
Contacts
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 968-3300  
Josh Halvorsen - McCarthy Building Companies, Phone:(913) 329-3282  
METRO AIR CONDITIONING , Address:8151 MCCOY ST, Phone:(913) 888-3991  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
METRO AIR CONDITIONING , Address:8151 MCCOY ST, Phone:(913) 888-3991  
H | D Architecture, Address:15225 Broadmoor St  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/18/2026 04/03/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
03/11/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 3/18/26 - McCarthy Construction is not currently licensed with us.
LC - MEP Subs
Resolved
03/18/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 03/18/2026 03/18/2026
Joe Frogge
Misc
Resolved
03/18/2026

Occupancy cannot be granted to spaced without all life safety and exiting are compliant. Action required: Amend phasing to comply. 2 exits required from areas with occupant loads of 50 or greater.
Miscellaneous Correction
Resolved
03/18/2026

Inadequate information to complete review. Provide complete UL details for fire rated assemblies that include nail/screw patterns. 3/16/26 - Per architect, no new rated walls being built.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
03/18/2026

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Amend plans to comply. Multiple violations at new MD Offices, Patient Tlts, & Viral Vector
IBC 1606.2 Design dead load - structural
Resolved
03/18/2026

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new HVAC equipment. 3/18/26 - Response letter references engineer's report that is not found in this submittal.
NEC Article 517.13 Grounding of receptacles patient care
Resolved
03/18/2026

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Fire Plan Review Approved with Conditions 03/18/2026 03/18/2026
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
03/11/2026

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
03/11/2026

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Fire Plan Review Approved with Conditions 02/19/2026 02/18/2026
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
02/18/2026

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
02/18/2026

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 02/19/2026 02/17/2026
Joe Frogge
Misc
Corrective Action Required
02/17/2026

Occupancy cannot be granted to spaced without all life safety and exiting are compliant. Action required: Amend phasing to comply. 2 exits required from areas with occupant loads of 50 or greater.
Miscellaneous Correction
Corrective Action Required
02/17/2026

Inadequate information to complete review. Provide complete UL details for fire rated assemblies that include nail/screw patterns.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
02/17/2026

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Amend plans to comply. Multiple violations at new MD Offices, Patient Tlts, & Viral Vector
IBC 1606.2 Design dead load - structural
Corrective Action Required
02/17/2026

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new HVAC equipment.
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
02/17/2026

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Licensed Contractors Rejected 02/19/2026 02/17/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
02/17/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
02/17/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $24,000.00 $0.00 $24,000.00 Not Paid


$24,000.00    Add Fees to My Cart
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
02/03/2026 Application Form APPLICATION
02/09/2026 Plans 00_25-033_SLE Oncology_PermitSet_2026-01-31
02/18/2026 Letter DS P/R Corrections Document
03/11/2026 Engineer Report/Study SL East Oncology & Infusion Cntr - Ltr 01
03/11/2026 Plans 00_25-033_SLE Oncology_CityComments_2026-03-10
03/11/2026 Letter 25033_CityPlanReviewResponse_2026-03-10
03/18/2026 Approved Plans Approved construction plans
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home