Permit Application Status

PRCOM20260055


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20260055
Building Permit - Commercial
Issued
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
SAINT LUKE'S EAST SUITE 120 PAIN CLINIC ALTERATION INCLUDING RELOCATION OF EXISTING PAIN CLINIC INTO REMODELED SPACE, CONVERTING EXISTING OFFICE AND EXAM ROOM INTO NEW PROCEDURE ROOM, CONVERTING EXISTING OFFICE INTO NEW EXAM ROOM
01/06/2026
02/05/2026
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 968-3300  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
nmopalenik@mccarthy.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 03/18/2026 03/17/2026
Craig Hill
Sprinkler Plan Review Released for Construction 02/10/2026 02/09/2026
Craig Hill
Building Plan Review Approved 01/16/2026 01/20/2026
Joe Frogge
Fire Plan Review Approved with Conditions 01/16/2026 01/16/2026
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
01/16/2026

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
01/16/2026

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Licensed Contractors Rejected 01/16/2026 01/15/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
01/15/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
01/15/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $1,284.00 $1,284.00 Paid 02/05/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Pending
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Alarm Test Pending
In-wall Inspection Passed 2/19/2026 2/19/2026 02/19/2026
Rated Assembly Inspection Passed 3/3/2026 3/3/2026 03/03/2026
Documents & Images
Date Uploaded File Type Document Name
01/06/2026 Application Form APPLICATION
01/08/2026 Plans SLE SUITE 120 BID SET 25-1230
01/20/2026 Approved Plans Approved construction plans
01/27/2026 20993M - SLH East Suite 125 (APPROVAL)-FP-1 - Sealed - Signed - Flat
02/05/2026 Receipt Receipt for transaction: 2026-000698
02/05/2026 Letter DS Building Permit
02/09/2026 20993M - SLH East Suite 125 (APPROVAL)-FP-1 - Sealed - Signed - Flat RFC
02/09/2026 Letter Fire (Sprinkler) Plan Review
02/19/2026 Letter INSPECTION SUMMARY
03/03/2026 Letter INSPECTION SUMMARY
03/03/2026 SLE_FL1_Suite120_Dwgs
03/17/2026 SLE_FL1_Suite120_Dwgs RFC
03/17/2026 Letter Fire (Alarm) Plan Review Notice
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home