Permit Application Status

PRCOM20255257


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20255257
Building Permit - Commercial
Temporary Occupancy
NORTH OAK SAFETY STORAGE LLC
NEW TENANT FINISH
INTRINSIC - NEW TENANT FINISH
12/01/2025
12/16/2025
06/09/2026
Locations
Contacts
NORTH OAK SAFETY STORAGE LLC, Address:1120 NW EAGLE RIDGE BLVD  
North Oak Safety Storage LLC, Address:1120 NW Eagle Ridge Blvd.  
CLAYTON@SAFETYMINISTORAGE.COM  
F & G MECHANICAL SERVICES INC, Address:17219 BEL RAY PLACE, Phone:(816) 322-0810  
VELOCITY ELECTRIC AND AUTOMATION LLC, Address:1704 SW RED FOX CIR, Phone:(816) 215-1514  
R2 PLUMBING LLC, Address:1705 A SE COUNTY RD AA, Phone:(816) 215-8098  
<NO NAME>, Phone:( ) -   
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 12/19/2025 12/12/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
12/12/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. Fee will be $2,211.00
IPC 403.1 Minimum number of fixtures
Resolved
12/12/2025

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved alternate.
Fire Plan Review Approved with Conditions 12/19/2025 12/12/2025
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
12/12/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/12/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Licensed Contractors Approved 12/12/2025 12/12/2025
Joe Frogge
Fire Plan Review Approved with Conditions 12/11/2025 12/11/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
12/11/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/11/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 12/11/2025 12/10/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
12/10/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. Fee will be $2,211.00
IPC 403.1 Minimum number of fixtures
Corrective Action Required
12/10/2025

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved alternate.
Licensed Contractors Approved 12/11/2025 12/01/2025
Joe Frogge
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Tenent Finish $50.00 $50.00 Paid 12/16/2025
Industrial/Warehouse Excise Tax Fee $2,211.00 $2,211.00 Paid 12/16/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 01/29/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Commercial Pending 2/28/2026
Misc
Corrective Action Required
01/29/2026
-Provide alternative to the required drinking fountain -Partition walls were not inspected by city -The water closet lever must be on the approach side of the bowl -Label wall heater and water heater breakers
Underslab Plumbing Inspection - Commercial Passed 12/17/2025 12/17/2025 12/17/2025
In-wall Inspection Failed 1/15/2026 1/15/2026 01/15/2026
Misc
Corrective Action Required
01/15/2026
-Secure water lines -Install bath exhaust -Complete installing backings for grab bars
In-wall Inspection Passed 1/16/2026 1/16/2026 01/15/2026
Misc
Resolved
01/15/2026
-Secure water lines -Install bath exhaust -Complete installing backings for grab bars
Above Ceiling Inspection Passed 1/28/2026 1/28/2026 01/28/2026
Occupancy Inspection - Codes Commercial Ready for Temp CO 1/29/2026 1/29/2026 01/29/2026
Misc
Corrective Action Required
01/29/2026
-Provide alternative to the required drinking fountain -Partition walls were not inspected by city -The water closet lever must be on the approach side of the bowl -Label wall heater and water heater breakers
Occupancy Inspection - Fire Passed 1/29/2026 1/29/2026 01/29/2026
Documents & Images
Date Uploaded File Type Document Name
12/01/2025 Application Form APPLICATION
12/01/2025 Plans 25_11_26 Intrinsic Permit Set
12/11/2025 Letter DS P/R Corrections Document
12/11/2025 Letter 25_12_11 Plan Review Response Letter PRCOM20255257
12/11/2025 Plans A-001 Revised 12_11_25
12/12/2025 Approved construction plans
12/16/2025 Receipt Receipt for transaction:2025-009069
12/16/2025 Letter DS Building Permit
12/17/2025 Letter INSPECTION SUMMARY
01/15/2026 Letter INSPECTION SUMMARY
01/15/2026 Letter INSPECTION SUMMARY
01/28/2026 Letter License Tax Bill
01/28/2026 Letter INSPECTION SUMMARY
01/29/2026 Letter INSPECTION SUMMARY
01/29/2026 Certificate/License Codes Temporary Certificate of Occupancy
01/29/2026 Receipt Receipt for transaction:2026-000569
01/30/2026 Demising Walls letter mike moore
03/11/2026 Engineer Report/Study in wall letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home