Permit Application Status

PRCOM20253983


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20253983
Building Permit - Commercial
Voided
NEW OTHER (COMMERCIAL)
SWIMMING POOL FOR RESIDENTIAL DEVELOPMENT **Moved to clubhouse permit - JOE FROGGE 09/30/2025 1:45 PM
09/17/2025
09/30/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Jason Hewitt - Clayton Properties Group, Phone:(816) 317-5480  
B+A Architecture, Address:600 Broadway Blvd, Suite 290, Phone:(816) 753-6100  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Rejected 10/01/2025 09/25/2025
Joe Frogge
Health Dept Review
Corrective Action Required
09/25/2025

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection (aquatic)
Corrective Action Required
09/25/2025

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
Final Development Plan Review Approved 10/01/2025 09/25/2025
Joe Frogge
Licensed Contractors Rejected 10/01/2025 09/25/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/25/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (electrician required)
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
09/17/2025 Application Form APPLICATION
09/17/2025 Plans Bailey Farms - Pool Drawings_20250915
09/25/2025 Approved Plans Approved construction plans
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home