| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Building Plan Review
|
Approved
|
10/06/2025
|
09/29/2025
|
|
|
Joe Frogge
|
|
|
Misc
Insufficient information to complete review.
Action required:
-
-
- Where are the condensing units for the coolers? If indoors, how is a/c system modified to accommodate?
9/4/2025 - Not addressed.
|
|
|
|
|
Fire Plan Review
|
Approved with Conditions
|
10/06/2025
|
09/29/2025
|
|
|
Joe Frogge
|
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
|
|
Licensed Contractors
|
Approved
|
09/29/2025
|
09/29/2025
|
|
|
Joe Frogge
|
|
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/05/2025
|
09/04/2025
|
|
|
Joe Frogge
|
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
|
|
Building Plan Review
|
Rejected
|
09/05/2025
|
09/04/2025
|
|
|
Joe Frogge
|
|
|
Misc
Corrective Action Required
Insufficient information to complete review.
Action required:
-
-
- Where are the condensing units for the coolers? If indoors, how is a/c system modified to accommodate?
9/4/2025 - Not addressed.
|
|
|
IBC 2902.3.1 Access - access to public toilet
2018 IBC 2902.3.1 Access. The route to the public toilet facilities required by Section 2902.3 shall not pass through kitchens, storage rooms or closets. Access to the required facilities shall be from within the building or from the exterior of the building. All routes shall comply with the accessibility requirements of this code. The public shall have access to the required toilet facilities at all times that the building is occupied.
Action required: Public access to toilet room is required and it is not allowed to be routed through a storage area.
|
|
|
ICC A117.1 904.3 Sales and Service Counters
ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) 904.3.3 Forward Approach. A portion of the public use side of the counter surface 30 inches minimum in length and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a forward approach to the accessible counter shall be provided. Knee and toe clearance complying with Section 306 shall be provided under the accessible counter. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12” minimum.
Action required: Provide verification that there is an accessible portion of counter top.
|
|
|
|
|
Licensed Contractors
|
Approved
|
09/05/2025
|
09/04/2025
|
|
|
Joe Frogge
|
|
|
|
|
Fire Plan Review
|
Rejected
|
08/20/2025
|
08/21/2025
|
|
|
Craig Hill
|
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
|
|
Building Plan Review
|
Rejected
|
08/20/2025
|
08/20/2025
|
|
|
Joe Frogge
|
|
|
Misc
Corrective Action Required
Insufficient information to complete review.
Action required:
- Resubmit floor plan that is to scale and/or fully dimensioned.
- Show plumbing fixtures, doors, door swings, windows, door swings, etc.
- Where are the condensing units for the coolers? If indoors, how is a/c system modified to accommodate?
|
|
|
IBC 2902.3.1 Access - access to public toilet
Corrective Action Required
2018 IBC 2902.3.1 Access. The route to the public toilet facilities required by Section 2902.3 shall not pass through kitchens, storage rooms or closets. Access to the required facilities shall be from within the building or from the exterior of the building. All routes shall comply with the accessibility requirements of this code. The public shall have access to the required toilet facilities at all times that the building is occupied.
Action required: Public access to toilet room is required and it is not allowed to be routed through a storage area.
|
|
|
ICC A117.1 904.3 Sales and Service Counters
Corrective Action Required
ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) 904.3.3 Forward Approach. A portion of the public use side of the counter surface 30 inches minimum in length and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a forward approach to the accessible counter shall be provided. Knee and toe clearance complying with Section 306 shall be provided under the accessible counter. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12” minimum.
Action required: Provide verification that there is an accessible portion of counter top.
|
|
|
|
|
Licensed Contractors
|
Approved
|
08/20/2025
|
08/13/2025
|
|
|
Joe Frogge
|
|
|
|
|
Alarm Plan Review
|
Pending
|
|
|
|
|
Craig Hill
|
|
|
|
|
Sprinkler Plan Review
|
Pending
|
|
|
|
|
Craig Hill
|
|
|
|