Permit Application Status

PRCOM20252981


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20252981
Building Permit - Commercial
Issued
RED SUMMIT FAIR LLC
CHANGE OF TENANT
LOVESAC - CHANGE OF TENANT FOR RETAIL SALES OF FURNITURE
07/14/2025
11/18/2025
01/28/2026
Locations
Contacts
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
VCMG, LLC, Address:107 Snowy Egret Way  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
ROZIER ELECTRIC, Address:1608 SW JEFFERSON ST, Phone:(816) 246-9000  
RIDEN SERVICE CO INC, Address:11306 W 89TH ST, Phone:(913) 432-8495  
Onyx Creative, Address:25001 Emery Rd, Phone:(216) 223-3200  
Matthew Renda - VCMG, Phone:(718) 689-0229  
AUTOMATED CONTROL SYSTEMS CORP, Address:5251 W 116TH PL, STE 200, Phone:(913) 248-8828  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 02/25/2026 02/26/2026
Craig Hill
Sprinkler Plan Review Released for Construction 12/04/2025 12/04/2025
Craig Hill
Licensed Contractors Approved 08/01/2025 11/18/2025
Joe Frogge
LC - General Contractor
Resolved
11/18/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Resolved
11/18/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 08/08/2025 08/01/2025
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
08/01/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
08/01/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Approved 08/08/2025 08/01/2025
Joe Frogge
IBC 1606.2 Design dead load - structural
Resolved
08/01/2025

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
Building Plan Review Rejected 07/24/2025 07/23/2025
Joe Frogge
IBC 1606.2 Design dead load - structural
Corrective Action Required
07/23/2025

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
Licensed Contractors Rejected 07/24/2025 07/23/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
07/23/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
07/23/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 07/24/2025 07/21/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
07/21/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
07/21/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $1,208.00 $1,208.00 Paid 10/10/2025
$14,322.50
Commercial Excise Tax Fee $4,768.50 $4,768.50 Paid 07/14/2025
$4,786.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Alarm Test Pending
Underslab Electrical Inspection - Commercial Passed 02/17/2026
Underslab Plumbing Inspection - Commercial Passed 02/17/2026
Above Ceiling Inspection Partial 02/24/2026
Misc
Corrective Action Required
02/24/2026
-Vestibule ok to cover
In-wall Inspection Partial 2/24/2026 2/24/2026 02/24/2026
Misc
Corrective Action Required
02/24/2026
Complete except bathroom walls (not ready)
In-wall Inspection Passed 3/4/2026 3/4/2026 03/04/2026
Misc
Resolved
03/04/2026
Complete except bathroom walls (not ready)
Above Ceiling Inspection Partial 3/4/2026 3/4/2026 03/04/2026
Misc
Corrective Action Required
02/24/2026
-Vestibule ok to cover -Perimeter light alcove ok to cover
Above Ceiling Inspection Partial 3/11/2026 3/11/2026 03/11/2026
Misc
Corrective Action Required
03/04/2026
All Hard lids approved
Rough Electrical Inspection - Commercial Partial 3/23/2026 3/23/2026 03/23/2026
Misc
Corrective Action Required
03/23/2026
Land equipment ground on terminal bar in disconnect
Electrical Service Inspection Passed 3/23/2026 3/23/2026 03/23/2026
Rough Electrical Inspection - Commercial Passed 4/2/2026 4/2/2026 04/02/2026
Misc
Resolved
04/02/2026
Land equipment ground on terminal bar in disconnect
Above Ceiling Inspection Passed 4/2/2026 4/2/2026 04/02/2026
Misc
Resolved
04/02/2026
All Hard lids approved
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit