Permit Application Status

PRCOM20252966


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20252966
Building Permit - Commercial
In Plan Review
RED SUMMIT FAIR LLC
CHANGE OF TENANT
SEPHORA - CHANGE OF TENANT FOR SEPHORA RETAIL STORE
07/11/2025
01/19/2026
Locations
Contacts
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
HORIZON RETAIL CONSTRUCTION INC, Address:9999 E EXPLORATION CT, Phone:(262) 638-6000  
  
  
  
  
SARGENTI ARCHITECTS, Address:461 FROM ROAD 2ND FLOOR, Phone:(973) 253-9393 Ext:142  
Brian Posantes, Address:8370 Wilshire Blvd Space 330, Phone:(818) 632-9744  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Rejected 07/23/2025 07/23/2025
Joe Frogge
Suite address
Corrective Action Required
07/23/2025

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: The address for this suite is 860 NW Blue Pkwy, Unit:T. Update your records and inform your client.
IBC 1008.3 Emergency power for illumination - at exit discharge
Corrective Action Required
07/23/2025

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting in 101 Sales Area.
IBC 1606.2 Design dead load - structural
Corrective Action Required
07/23/2025

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new hvac equipment.
IPC 301.3 Connections to drainage system
Corrective Action Required
07/23/2025

2018 IPC 301.3 Connections to drainage system. Plumbing fixtures, drains, appurtenances and appliances used to receive or discharge liquid wastes or sewage shall be directly connected to the sanitary drainage system of the building or premises, in accordance with the requirements of this code. This section shall not be construed to prevent indirect waste systems required by Chapter 8. (see code for exception) Action required: Sink drain pump not allowed. Sink must be directly connected to sanitary.
Licensed Contractors Rejected 07/23/2025 07/23/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
07/23/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
07/23/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 07/23/2025 07/22/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
07/22/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
07/22/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Misc
Corrective Action Required
07/22/2025

Action Required: Provide emergency exterior illumination at the front exit.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
07/17/2025 Certificate/License Business License
07/17/2025 Letter COI (Exp 1-1-26)
07/17/2025 Application Form Commercial Permit Application (original)_Summit
07/17/2025 Plans SUMMIT FAIR_Issue for Permit
07/21/2025 Letter License Tax Bill
07/23/2025 Letter DS P/R Corrections Document
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home