Permit Application Status

PRCOM20252490


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20252490
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
CHANGE OF TENANT
FITNESS STUDIO SUMMIT FAIR - CHANGE OF TENANT TO NEW FITNESS FACILITY
06/16/2025
07/16/2025
10/01/2025
Locations
Contacts
CMint Group LLC, Address:7510 N Hemple ave  
Jesus Osugera - CMint Group, Phone:(913) 284-6086  
JIMENEZ HEATING, LLC, Address:3219 NE 59TH TER, Phone:(816) 217-2897  
JIMENEZ HEATING, LLC, Address:3219 NE 59TH TER, Phone:(816) 217-2897  
JIMENEZ HEATING, LLC, Address:3219 NE 59TH TER, Phone:(816) 217-2897  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 09/11/2025 09/04/2025
Craig Hill
Sprinkler Plan Review Released for Construction 09/02/2025 09/02/2025
Craig Hill
Building Plan Review Approved 06/26/2025 06/25/2025
Joe Frogge
Code analysis required
Resolved
06/25/2025

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Code Notes must be amended: - Occupant load = 34 - ICC/ANSI code year is 2009
Licensed Contractors Rejected 06/26/2025 06/25/2025
Joe Frogge
LC - General Contractor
Resolved
06/26/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
06/25/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 06/26/2025 06/23/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
06/18/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system
Construction documents - Fire protection systems
Corrective Action Required
06/18/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $280.00 $280.00 Paid 06/26/2025
$8,662.50
Commercial Excise Tax Fee $4,331.25 $4,331.25 Paid 06/18/2025
$4,331.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Failed 8/21/2025 08/21/2025
Misc
Corrective Action Required
08/21/2025
-Remove drywall at mechanical room -Install THWN conductors at underslab electrical -Bed new dwv in gravel -Protect all inwall dwv **ok to hang furout wall
All Rough Inspection - Commercial Partial 8/22/2025 8/22/2025 08/22/2025
Misc
Corrective Action Required
08/21/2025
-Remove unused fitting at J box in soffit, install knockout cover, and provide access panel in soffit near hall 105. This can be verified at final
Underslab Electrical Inspection - Commercial Passed 08/22/2025
Underslab Plumbing Inspection - Commercial Passed 08/22/2025
All Rough Inspection - Commercial Failed 9/24/2025 9/24/2025 09/24/2025
Misc
Corrective Action Required
08/22/2025
-Remove unused fitting at J box in soffit, install knockout cover, and provide access panel in soffit near hall 105. This can be verified at final **9/24/25 -Inspection requested for fire alarm-contact LSFD
Occupancy Inspection - Codes Commercial Failed 9/30/2025 9/30/2025 09/30/2025
Misc
Corrective Action Required
09/30/2025
-Complete any corrections for LSFSD -Restroom signs to be located on latch side of doors -Vertical bar in men's room to be 39" to 41" from back wall -Support expansion tank -Label panel
Above Ceiling Inspection Passed 09/30/2025
All Rough Inspection - Commercial Passed 09/30/2025
Misc
Resolved
09/30/2025
-Remove unused fitting at J box in soffit, install knockout cover, and provide access panel in soffit near hall 105. This can be verified at final **9/24/25 -Inspection requested for fire alarm-contact LSFD
Occupancy Inspection - Codes Commercial Full C of O 10/1/2025 10/1/2025 10/01/2025
Misc
Resolved
10/01/2025
-Complete any corrections for LSFSD -Restroom signs to be located on latch side of doors -Vertical bar in men's room to be 39" to 41" from back wall -Support expansion tank -Label panel
Occupancy Inspection - Fire Failed 9/30/2025 9/30/2025 10/01/2025
Alarm Test Failed 10/01/2025
Occupancy Inspection - Fire Passed 10/1/2025 10/1/2025 10/01/2025
Alarm Test Passed 10/01/2025
Documents & Images
Date Uploaded File Type Document Name
06/16/2025 Application Form APPLICATION
06/18/2025 Plans Fitness Studio CD-Set 6-16-25
06/18/2025 Letter License Tax Bill
06/25/2025 Approved Plans Approved construction plans
06/26/2025 Receipt Receipt for transaction:2025-004906
07/16/2025 Letter DS Building Permit
08/19/2025 FITNESS STUDIO
08/21/2025 Letter INSPECTION SUMMARY
08/22/2025 Letter INSPECTION SUMMARY
08/22/2025 Letter INSPECTION SUMMARY
08/22/2025 Letter INSPECTION SUMMARY
08/28/2025 STAMPED 08-20-2025 FA FITNESS STUDIO
08/28/2025 FITNESS STUDIO FA SUBMITTAL 08-20-2025
09/02/2025 FITNESS STUDIO RFC
09/02/2025 Letter Fire (Sprinkler) Plan Review
09/04/2025 STAMPED 08-20-2025 FA FITNESS STUDIO RFC
09/04/2025 Letter Fire (Alarm) Plan Review Notice
09/24/2025 Letter INSPECTION SUMMARY
09/30/2025 Letter INSPECTION SUMMARY
09/30/2025 Letter INSPECTION SUMMARY
09/30/2025 Letter INSPECTION SUMMARY
10/01/2025 Letter Codes Final Certificate of Occupancy
10/01/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home