Permit Application Status

PRCOM20250530


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20250530
Building Permit - Commercial
Issued
RED SUMMIT FAIR LLC
ALTERATION COMMERCIAL
EXTENDING SERVICE CORRIDOR
02/18/2025
03/14/2025
Locations
Contacts
Origin Build Co LLC, Address:5723 Nall Ave  
IPLUMBKC LLC, Address:34108 E TRUMAN RD, Phone:(833) 758-6252  
EMPOWERED ELECTRIC , Address:110 E 13TH AVE, Phone:(816) 401-8949  
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Ryan Stamer - Origin Build Co, Address:5723 Nall Ave, Phone:(913) 636-5867  
CLOCKWORK, Address:423 DELAWARE STREET #102, Phone:(816) 807-3787  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 04/25/2025 04/24/2025
Craig Hill
Sprinkler Plan Review Released for Construction 05/07/2025 04/24/2025
Craig Hill
Building Plan Review Approved with Conditions 03/06/2025 03/10/2025
Joe Frogge
Misc
Corrective Action Required
03/10/2025

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. We have assigned this new tenant suite as 'Y' as suit 'M' would need to be on the other side of the building. Please update your records and inform your client.
Fire Plan Review Approved 03/06/2025 03/05/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
03/05/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
03/05/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Licensed Contractors Approved 07/29/2025 02/28/2025
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $120.00 $120.00 Paid 03/12/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Pending
Above Ceiling Inspection Pending
Rated Assembly Inspection Pending
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Alarm Test Pending
Rated Assembly Inspection Partial 4/11/2025 4/11/2025 04/11/2025
Informational
04/11/2025
1 side screw pattern only approved
Documents & Images
Date Uploaded File Type Document Name
02/18/2025 Application Form APPLICATION
02/28/2025 Plans 2025.02.13 SUMMIT FAIR - BLDG D SERVICE CORRIDOR - Permit Set
03/10/2025 Approved Plans Approved construction plans
03/12/2025 Receipt Receipt for transaction:2025-001486
03/14/2025 Letter DS Building Permit
04/11/2025 Letter INSPECTION SUMMARY
04/11/2025 Summit FaIr Building D FA 2025
04/23/2025 SUMMIT FAIR CORRIDOR-(FP 1)
04/24/2025 SUMMIT FAIR CORRIDOR-(FP 1) RFC
04/24/2025 Letter Fire (Sprinkler) Plan Review
04/24/2025 Summit FaIr Building D FA 2025 RFC
04/24/2025 Letter Fire (Alarm) Plan Review Notice
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home