Permit Application Status

PRCOM20250332


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20250332
Building Permit - Commercial
Issued
LSMO TUDOR APARTMENTS LLC
NEW MULTI-FAMILY
EVREN APARTMENTS BUILDING #8 TYPE A- NEW APARTMENT **Approved plans are in PRCOM20244879**
01/30/2025
06/11/2025
03/30/2025
Locations
Contacts
CITYSCAPE CONSTRUCTION - TUDOR LLC, Address:10 W CARMEL DRIVE STE 200, Phone:(317) 574-1600  
LSMO TUDOR APARTMENTS LLC, Address:10 W CARMEL DR STE 200  
Kevin O'Neill - Cityscape Construction, Address:10 W Carmel Dr. Suite 2000, Phone:(816) 874-2769  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
KAW VALLEY ENGINEERING INC, Address:14700 W 114TH TERR, Phone:(913) 894-5150  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
STANDARD HEATING & COOLING TOO LLC, Address:2006 E PRAIRIE CIRCLE , Phone:(913) 782-5409  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Rejected 08/27/2025 08/27/2025
Craig Hill
Miscellaneous Correction
Corrective Action Required
08/19/2025

Action Required: Safety Margins need to be 5 or greater. Page 38
Miscellaneous Correction
Corrective Action Required
08/19/2025

Action Required: Change fire department connection to a 4" storz with a 30 degree elbow.
Misc
Corrective Action Required
08/19/2025

Action Required: Ball drip is needed on the "type A, B. C, & D" riser.
Licensed Contractors Approved 11/15/2024 01/30/2025
Joe Frogge
Misc
Resolved
01/30/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/12/2024 - Standard Electric Co is not licensed with us.
Building Plan Review Approved with Conditions 11/15/2024 01/23/2025
Joe Frogge
Miscellaneous Correction
Resolved
01/30/2025

This review represents all structures on site. Permits for individual structures will be created later in this process. (not including clubhouse which is "by others") Action required: Comment is informational. 11/12/2024 - Acknowledged in letter.
Final Development Plan
Resolved
01/23/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 11/12/2024 - Acknowledged in letter.
Project cost
Resolved
11/12/2024

The project cost, which is used to establish the permit fee, has not been provided for individual structures. Action required: Provide estimated construction cost for every structure including garages, maintenance building, pool, trash enclosures, shade structures, and water meters, etc. (do not include site work)
Health Dept Review (aquatic)
Corrective Action Required
11/12/2024

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 11/14/2024 - Deferred per request.
Health Dept Inspection (aquatic)
Corrective Action Required
11/12/2024

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 11/12/2024 - Acknowledged in letter.
IBC 502.1 - Address Identification
Corrective Action Required
11/12/2024

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Comment is informational. Addressing scenario has not yet been decided upon. You will be made aware of building and suite addresses at a later date. 11/12/2024 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
11/12/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss submittals deferred per request. 11/12/2024 - Acknowledged in letter.
Misc
Corrective Action Required
11/12/2024

City of Lee's Summit Code of Ordinances Section 28-177. - Applicability. (of excise/license tax) (B)(1)(e) Development requiring a building permit and resulting in additional vehicle trips that is constructed by, or by a building contractor on behalf of, a person that is not subject to any Federal, State or local taxes, including Federal, State and local sales, income, personal property, real property, use, earnings, excise or license taxes. The burden of proof shall be on the building contractor claiming this credit to demonstrate to the License Tax Administrator, by clear and convincing evidence, that the development being constructed by, or by a building contractor on behalf of, a person claiming such credit is exempt from all Federal, State and local taxes as described in this subsection; Action required: Provide verification of tax exempt status. 11/12/2024 - Letter provided is only applicable to sales tax to purchase construction materials. Excise/License tax still applies.
Elevator Equipment Permit
Corrective Action Required
11/12/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 11/12/2024 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
11/12/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 11/12/2024 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
11/12/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 11/12/2024 - Acknowledged in letter.
Misc
Resolved
11/12/2024

2018 IBC 504.4 Number of stories. The maximum number of stories of a building shall not exceed the limits specified in Table 504.4. Action required: Building type D exceeds maximum 4 stories. 11/12/2024 - Per architect, basement does not meed definition of a story.
IBC 1803.1 General - geotech
Resolved
11/12/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (2,500psf cited in specs and S0.01)
IMC 306.5 Equipment on roofs
Corrective Action Required
11/12/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide minimum 30" side rail extenders at tops of roof hatches. 11/12/2024 - Per architect this is covered in spec. To be field verified.
IPC 708.1 Cleanouts required
Resolved
11/12/2024

2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary sewers exit building A.
IPC 604.9 Water hammer
Resolved
11/12/2024

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed as water hammer protection. Remove references in plumbing general notes.
IPC 604.8 Water pressure reducing valve
Resolved
11/12/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Remove notes that direct contractor to only install PRVs "if over 80 psig". (Our Water Department requires PRV installation in all locations regardless of pressure)
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Resolved
11/12/2024

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Additional receptacles required in dwelling units to comply.
NEC Article 230.2 (E) Identification of multiple services
Resolved
11/12/2024

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Specify signage at locations with electric services at each end of building.
Misc
Resolved
11/12/2024

Unified Development Ordinance Section 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of nonslip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Exception: Pools accessory to one- and two-family dwellings. Action required: At pool stairs and ladders provide a handrail on each side.
Final Development Plan Review Approved 12/13/2024 12/13/2024
Daniel Fernandez
Fire Plan Review Approved 11/15/2024 11/13/2024
Craig Hill
Posting of occupant load
Corrective Action Required
11/13/2024

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Construction documents for fire alarm systems
Corrective Action Required
11/13/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for review and approval. Provide as a deferred submital.
Knox box required
Corrective Action Required
11/13/2024

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Fire protection equipment identification
Corrective Action Required
11/13/2024

2018 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible.
Construction documents - Fire protection systems
Corrective Action Required
11/13/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for review and approval. Provide as a deferred submital.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
11/13/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
Portable fire extinguishers - general
Corrective Action Required
11/13/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Address numbers required
Corrective Action Required
11/13/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Special Inspections Review Approved 10/04/2024
Joe Frogge
Fire Plan Review Approved 09/30/2024 10/01/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
09/28/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for review and approval. Provide as a deferred submital.
Address numbers required
Corrective Action Required
09/28/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Knox box required
Corrective Action Required
09/28/2024

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Construction documents - Fire protection systems
Corrective Action Required
09/28/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for review and approval. Provide as a deferred submital.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
09/28/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
Building Plan Review Rejected 09/30/2024 09/25/2024
Joe Frogge
Misc
Corrective Action Required
09/23/2024

This review represents all structures on site. Permits for individual structures will be created later in this process. (not including clubhouse which is "by others") Action required: Comment is informational.
Final Development Plan
Corrective Action Required
09/23/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Project cost
Corrective Action Required
09/23/2024

The project cost, which is used to establish the permit fee, has not been provided for individual structures. Action required: Provide estimated construction cost for every structure including garages, maintenance building, pool, trash enclosures, shade structures, and water meters, etc. (do not include site work)
Health Dept Review (aquatic)
Corrective Action Required
09/23/2024

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection (aquatic)
Corrective Action Required
09/23/2024

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IBC 502.1 - Address Identification
Corrective Action Required
09/23/2024

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Comment is informational. Addressing scenario has not yet been decided upon. You will be made aware of building and suite addresses at a later date.
IBC 1704.2 Special Inspections
Resolved
10/04/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Engineered truss package
Corrective Action Required
09/23/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss submittals deferred per request.
Misc
Corrective Action Required
09/23/2024

City of Lee's Summit Code of Ordinances Section 28-177. - Applicability. (of license tax) (B)(1)(e) Development requiring a building permit and resulting in additional vehicle trips that is constructed by, or by a building contractor on behalf of, a person that is not subject to any Federal, State or local taxes, including Federal, State and local sales, income, personal property, real property, use, earnings, excise or license taxes. The burden of proof shall be on the building contractor claiming this credit to demonstrate to the License Tax Administrator, by clear and convincing evidence, that the development being constructed by, or by a building contractor on behalf of, a person claiming such credit is exempt from all Federal, State and local taxes as described in this subsection; Action required: Provide verification of tax exempt status.
Elevator Equipment Permit
Corrective Action Required
09/23/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
09/23/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
09/23/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Misc
Corrective Action Required
09/23/2024

2018 IBC 504.4 Number of stories. The maximum number of stories of a building shall not exceed the limits specified in Table 504.4. Action required: Building type D exceeds maximum 4 stories.
IBC 1803.1 General - geotech
Corrective Action Required
09/23/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (2,500psf cited in specs and S0.01)
IMC 306.5 Equipment on roofs
Corrective Action Required
09/23/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide minimum 30" side rail extenders at tops of roof hatches.
IPC 708.1 Cleanouts required
Corrective Action Required
09/23/2024

2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary sewers exit building A.
IPC 604.9 Water hammer
Corrective Action Required
09/24/2024

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed as water hammer protection. Remove references in plumbing general notes.
IPC 604.8 Water pressure reducing valve
Corrective Action Required
09/24/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Remove notes that direct contractor to only install PRVs "if over 80 psig". (Our Water Department requires PRV installation in all locations regardless of pressure)
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Corrective Action Required
09/24/2024

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Additional receptacles required in dwelling units to comply.
NEC Article 230.2 (E) Identification of multiple services
Corrective Action Required
09/24/2024

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Specify signage at locations with electric services at each end of building.
Miscellaneous Correction
Corrective Action Required
09/24/2024

Unified Development Ordinance Section 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of nonslip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Exception: Pools accessory to one- and two-family dwellings. Action required: At pool stairs and ladders provide a handrail on each side.
Licensed Contractors Rejected 09/30/2024 09/23/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/23/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $25,528.40 $25,528.40 Paid 04/28/2025
Residential Excise Tax Fee $13,153.92 $13,153.92 Paid 04/28/2025
Water Tap Fee $26,485.00 $26,485.00 Paid 04/28/2025
Water Meter Fee $3,879.96 $3,879.96 Paid 04/28/2025
Sanitary Sewer Development Fee $15,241.00 $15,241.00 Paid 04/28/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 02/23/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 02/23/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 02/23/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 02/23/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 02/23/2026
Not Ready Inspection Fee $75.00 $75.00 Paid 02/23/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Pending
Sewer Service Inspection Pending
Water Service Inspection Pending
In-wall Inspection Pending
Sprinkler - Flow Test Pending
Miscellaneous Inspection Pending 4/6/2026 4/6/2026
Misc
Corrective Action Required
04/03/2026
4th floor units only approved
Footing Inspection - Commercial Partial 5/6/2025 5/6/2025 05/06/2025
Misc
Informational
05/06/2025
Perimeter complete except line AD
Footing Inspection - Commercial Partial 5/8/2025 5/8/2025 05/08/2025
Misc
Informational
05/06/2025
Perimeter complete except line AD -Elevator pit mat complete
Footing Inspection - Commercial Partial 5/9/2025 5/9/2025 05/09/2025
Misc
Informational
05/08/2025
Perimeter complete except line AD -Elevator pit mat complete -Thickened slab at east side
Footing Inspection - Commercial Partial 5/12/2025 5/12/2025 05/12/2025
Misc
Informational
05/09/2025
Perimeter complete except line AD -Elevator pit mat complete -Elevator pit walls complete -Thickened slab at east and west side
Footing Inspection - Commercial Partial 5/14/2025 5/14/2025 05/14/2025
Misc
Informational
05/12/2025
Perimeter complete except line AD -Elevator pit mat complete -Elevator pit walls complete -Thickened slab at east and west side -Line AD from A1 to A8 and A11 to A13
Underslab Plumbing Inspection - Commercial Passed 5/23/2025 5/23/2025 05/23/2025
Underslab Electrical Inspection - Commercial Partial 5/30/2025 5/30/2025 05/30/2025
Misc
Informational
05/30/2025
APPROVED AREAS: - Condui for 3 units from wall to island - 3 data conduits on East side
Footing Inspection - Commercial Passed 6/5/2025 6/5/2025 06/05/2025
Misc
Resolved
06/05/2025
Perimeter complete except line AD -Elevator pit mat complete -Elevator pit walls complete -Thickened slab at east and west side -Line AD from A1 to A8 and A11 to A13
Rated Assembly Inspection Failed 7/9/2025 7/9/2025 07/09/2025
Misc
Corrective Action Required
07/09/2025
Provide UL details and complete per detail
Rated Assembly Inspection Failed 7/10/2025 7/10/2025 07/10/2025
Misc
Corrective Action Required
07/09/2025
Provide UL details and complete per detail
Rated Assembly Inspection Failed 7/16/2025 7/16/2025 07/16/2025
Misc
Corrective Action Required
07/10/2025
-2 hour shaft assembly at stairs to be continous from foundation to underside of roof deck
Piers/Caissons Inspection - Commercial Partial 7/24/2025 7/24/2025 07/24/2025
Misc
Corrective Action Required
07/24/2025
(3) of (10) piers for deck posts
Rated Assembly Inspection Partial 7/24/2025 7/24/2025 07/24/2025
Misc
Corrective Action Required
07/16/2025
-2 hour shaft assembly at stairs to be continous from foundation to underside of roof deck
STAIR TOWER 1
Corrective Action Required
07/24/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Corrective Action Required
07/24/2025
1st floor: 1st layer band at stair side for landings
Piers/Caissons Inspection - Commercial Partial 07/24/2025
Misc
Corrective Action Required
07/24/2025
(2) of (10) piers for deck posts
Rated Assembly Inspection Not Ready 7/28/2025 7/28/2025 07/28/2025
Misc
Corrective Action Required
07/24/2025
-2 hour shaft assembly at stairs to be continous from foundation to underside of roof deck ***7/28/25 -Replace broken and damaged sheet rock -Complete screw pattern -Break all rock on framing members -Correct any gaps 1/4" or greater
STAIR TOWER 1
Informational
07/28/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
07/28/2025
1st floor: 1st layer band at stair side for landings
Rated Assembly Inspection Failed 7/30/2025 7/30/2025 07/30/2025
Misc
Corrective Action Required
07/28/2025
-2 hour shaft assembly at stairs to be continous from foundation to underside of roof deck ***729/25 -Complete screw pattern -Break all rock on framing members -Correct any gaps 1/4" or greater -Tape joints ****Installation of stringers will prevent drywall screw pattern from being achieved
STAIR TOWER 1
Informational
07/28/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
07/28/2025
1st floor: 1st layer band at stair side for landings
All Rough Inspection - Commercial Partial 8/8/2025 08/08/2025
FIRST FLOOR
Corrective Action Required
08/08/2025
SECOND FLOOR
Corrective Action Required
08/08/2025
THIRD FLOOR
Corrective Action Required
08/08/2025
FOURTH FLOOR
Corrective Action Required
08/08/2025
STAIR TOWER 1
Corrective Action Required
08/08/2025
STAIR TOWER 2
Corrective Action Required
08/08/2025
1st floor stringer side ok to cover 1st floor stair side ok for band
ELEVATOR 1
Corrective Action Required
08/08/2025
Rated Assembly Inspection Partial 8/8/2025 8/8/2025 08/08/2025
Misc
Corrective Action Required
07/30/2025
STAIR TOWER 1
Informational
07/30/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
07/30/2025
1st floor: 1st layer band at stair side for landings 1st layer screw pattern at stringer side only
ELEVATOR 1
Corrective Action Required
08/08/2025
FIRST FLOOR
Corrective Action Required
08/08/2025
SECOND FLOOR
Corrective Action Required
08/08/2025
THIRD FLOOR
Corrective Action Required
08/08/2025
FOURTH FLOOR
Corrective Action Required
08/08/2025
All Rough Inspection - Commercial Partial 08/13/2025
FIRST FLOOR
Corrective Action Required
08/08/2025
SECOND FLOOR
Corrective Action Required
08/08/2025
THIRD FLOOR
Corrective Action Required
08/08/2025
FOURTH FLOOR
Corrective Action Required
08/08/2025
STAIR TOWER 1
Corrective Action Required
08/08/2025
STAIR TOWER 2
Corrective Action Required
08/08/2025
-1st floor stringer side ok to cover -1st floor stair side ok for band -2nd floor stringer side only ok for rock
ELEVATOR 1
Corrective Action Required
08/08/2025
Rated Assembly Inspection Partial 8/13/2025 08/13/2025
Misc
Corrective Action Required
08/08/2025
STAIR TOWER 1
Informational
08/08/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
08/08/2025
1st floor: 1st layer band at stair side for landings 1st layer screw pattern at stringer side only 1st layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
08/08/2025
FIRST FLOOR
Corrective Action Required
08/08/2025
SECOND FLOOR
Corrective Action Required
08/08/2025
THIRD FLOOR
Corrective Action Required
08/08/2025
FOURTH FLOOR
Corrective Action Required
08/08/2025
Rated Assembly Inspection Failed 8/14/2025 8/14/2025 08/14/2025
Misc
Corrective Action Required
08/13/2025
STAIR TOWER 1
Informational
08/13/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
08/13/2025
1st floor: 1st layer band at stair side for landings 1st layer screw pattern at stringer side only 1st layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
08/13/2025
FIRST FLOOR
Corrective Action Required
08/13/2025
SECOND FLOOR
Corrective Action Required
08/13/2025
THIRD FLOOR
Corrective Action Required
08/13/2025
FOURTH FLOOR
Corrective Action Required
08/13/2025
Rated Assembly Inspection Partial 8/15/2025 8/15/2025 08/15/2025
Misc
Corrective Action Required
08/14/2025
STAIR TOWER 1
Informational
08/14/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
08/14/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
08/14/2025
FIRST FLOOR
Corrective Action Required
08/14/2025
SECOND FLOOR
Corrective Action Required
08/14/2025
THIRD FLOOR
Corrective Action Required
08/14/2025
FOURTH FLOOR
Corrective Action Required
08/14/2025
Rated Assembly Inspection Partial 08/15/2025
Misc
Corrective Action Required
08/15/2025
STAIR TOWER 1
Informational
08/15/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
08/15/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
08/15/2025
FIRST FLOOR
Corrective Action Required
08/15/2025
SECOND FLOOR
Corrective Action Required
08/15/2025
THIRD FLOOR
Corrective Action Required
08/15/2025
FOURTH FLOOR
Corrective Action Required
08/15/2025
Rated Assembly Inspection Partial 8/19/2025 8/19/2025 08/19/2025
Misc
Corrective Action Required
08/15/2025
STAIR TOWER 1
Informational
08/15/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
08/15/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
08/15/2025
FIRST FLOOR
Corrective Action Required
08/15/2025
SECOND FLOOR
Corrective Action Required
08/15/2025
THIRD FLOOR
Corrective Action Required
08/15/2025
FOURTH FLOOR
Corrective Action Required
08/15/2025
Rated Assembly Inspection Partial 8/26/2025 8/26/2025 08/26/2025
Misc
Corrective Action Required
08/19/2025
STAIR TOWER 1
Informational
08/19/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
08/19/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 2nd floor: 1st layer band at stair side for 3rd fl landings
ELEVATOR 1
Corrective Action Required
08/19/2025
FIRST FLOOR
Corrective Action Required
08/19/2025
SECOND FLOOR
Corrective Action Required
08/19/2025
THIRD FLOOR
Corrective Action Required
08/19/2025
FOURTH FLOOR
Corrective Action Required
08/19/2025
Rated Assembly Inspection Partial 8/29/2025 8/29/2025 08/29/2025
Misc
Corrective Action Required
08/26/2025
STAIR TOWER 1
Informational
08/26/2025
1st floor: 1st layer band at stair side for landings
STAIR TOWER 2
Informational
08/26/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
08/26/2025
FIRST FLOOR
Corrective Action Required
08/26/2025
SECOND FLOOR
Corrective Action Required
08/26/2025
THIRD FLOOR
Corrective Action Required
08/26/2025
FOURTH FLOOR
Corrective Action Required
08/26/2025
Rated Assembly Inspection Partial 9/12/2025 9/12/2025 09/12/2025
Misc
Corrective Action Required
08/29/2025
STAIR TOWER 1
Informational
08/29/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 2nd floor: 1st layer band at corridor side above ceiling 3rd floor: 1st layer band at corridor side above ceiling
STAIR TOWER 2
Informational
08/29/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
08/29/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner
FIRST FLOOR
Corrective Action Required
08/29/2025
SECOND FLOOR
Corrective Action Required
08/29/2025
THIRD FLOOR
Corrective Action Required
08/29/2025
FOURTH FLOOR
Corrective Action Required
08/29/2025
Rated Assembly Inspection Partial 9/26/2025 9/26/2025 09/26/2025
Misc
Corrective Action Required
09/12/2025
STAIR TOWER 1
Informational
09/12/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 2nd floor: 1st layer band at corridor side above ceiling 3rd floor: 1st layer band at corridor side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers
STAIR TOWER 2
Informational
09/12/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok
ELEVATOR 1
Corrective Action Required
09/12/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner
FIRST FLOOR
Corrective Action Required
09/12/2025
SECOND FLOOR
Corrective Action Required
09/12/2025
THIRD FLOOR
Corrective Action Required
09/12/2025
FOURTH FLOOR
Corrective Action Required
09/12/2025
Rated Assembly Inspection Partial 10/1/2025 10/1/2025 10/01/2025
Misc
Corrective Action Required
09/26/2025
STAIR TOWER 1
Informational
09/26/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 2nd floor: 1st layer band at corridor side above ceiling
STAIR TOWER 2
Informational
09/26/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing
ELEVATOR 1
Corrective Action Required
09/26/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner
FIRST FLOOR
Corrective Action Required
09/26/2025
SECOND FLOOR
Corrective Action Required
09/26/2025
THIRD FLOOR
Corrective Action Required
09/26/2025
FOURTH FLOOR
Corrective Action Required
09/26/2025
Rated Assembly Inspection Failed 10/2/2025 10/2/2025 10/02/2025
Misc
Corrective Action Required
10/01/2025
STAIR TOWER 1
Informational
10/01/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 2nd floor: 1st layer band at corridor side above ceiling
STAIR TOWER 2
Informational
10/01/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing
ELEVATOR 1
Corrective Action Required
10/01/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner
FIRST FLOOR
Corrective Action Required
10/01/2025
SECOND FLOOR
Corrective Action Required
10/01/2025
THIRD FLOOR
Corrective Action Required
10/01/2025
FOURTH FLOOR
Corrective Action Required
10/01/2025
Rated Assembly Inspection Not Ready 10/3/2025 10/3/2025 10/03/2025
Misc
Corrective Action Required
10/02/2025
10/3/25 -NOT READY -COMPLETE SCREW PATTERN, PATCH ROCK STUD TO STUD AT REPAIRS
STAIR TOWER 1
Informational
10/02/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 2nd floor: 1st layer band at corridor side above ceiling
STAIR TOWER 2
Informational
10/02/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing
ELEVATOR 1
Corrective Action Required
10/02/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner
FIRST FLOOR
Corrective Action Required
10/02/2025
SECOND FLOOR
Corrective Action Required
10/02/2025
THIRD FLOOR
Corrective Action Required
10/02/2025
FOURTH FLOOR
Corrective Action Required
10/02/2025
Rated Assembly Inspection Failed 10/7/2025 10/7/2025 10/07/2025
Misc
Corrective Action Required
10/03/2025
10/3/25 -NOT READY -COMPLETE SCREW PATTERN, PATCH ROCK STUD TO STUD AT REPAIRS
STAIR TOWER 1
Informational
10/03/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 2nd floor: 1st layer band at corridor side above ceiling 4th floor 1st layer at unit and corridor-complete screw pattern
STAIR TOWER 2
Informational
10/03/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st layer unit and corridor
ELEVATOR 1
Corrective Action Required
10/03/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st layer units and corridor-complete screw pattern and extend rock to roof sheathing
FIRST FLOOR
Corrective Action Required
10/03/2025
SECOND FLOOR
Corrective Action Required
10/03/2025
THIRD FLOOR
Corrective Action Required
10/03/2025
FOURTH FLOOR
Corrective Action Required
10/03/2025
All Rough Inspection - Commercial Failed 10/7/2025 10/7/2025 10/07/2025
FIRST FLOOR
Corrective Action Required
08/13/2025
SECOND FLOOR
Corrective Action Required
08/13/2025
THIRD FLOOR
Corrective Action Required
08/13/2025
FOURTH FLOOR
Corrective Action Required
08/13/2025
-Not ready Complete draft stopping, complete fire blocking, provide slope at dwv, inspection incomplete
STAIR TOWER 1
Corrective Action Required
08/13/2025
STAIR TOWER 2
Corrective Action Required
08/13/2025
-1st floor stringer side ok to cover -1st floor stair side ok for band -2nd floor stringer side only ok for rock
ELEVATOR 1
Corrective Action Required
08/13/2025
Sprinkler - Hydrostatic Test Passed 10/8/2025 10/08/2025
Rated Assembly Inspection Partial 10/9/2025 10/9/2025 10/09/2025
Misc
Corrective Action Required
10/07/2025
STAIR TOWER 1
Informational
10/07/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 2nd floor: 1st layer band at corridor side above ceiling 4th floor 1st layer at unit and corridor-complete screw pattern
STAIR TOWER 2
Informational
10/07/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st layer unit and corridor
ELEVATOR 1
Corrective Action Required
10/07/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st layer units and corridor
FIRST FLOOR
Corrective Action Required
10/07/2025
SECOND FLOOR
Corrective Action Required
10/07/2025
THIRD FLOOR
Corrective Action Required
10/07/2025
FOURTH FLOOR
Corrective Action Required
10/07/2025
All Rough Inspection - Commercial Failed 10/9/2025 10/9/2025 10/09/2025
FIRST FLOOR
Corrective Action Required
10/07/2025
SECOND FLOOR
Corrective Action Required
10/07/2025
THIRD FLOOR
Corrective Action Required
10/07/2025
FOURTH FLOOR
Corrective Action Required
10/07/2025
409-Install H2.s at both sides of triple girder truss 408-Install H2.s at both sides of triple girder truss, strap top plate at party wall, add cripple stud and nail sheathing at back bed, support dryer duct 48" oc 407-Strap top plate lapped less than 48" at back bed, strap over bored top plates at party wall 406-Support dryer duct 48" oc, strap party wall 403-Repair draft stop, strap top plate at back bed, complete vertical draft stop 402-Install H2.s at both sides of triple girder truss, support DWV 48" oc 401-Install H2.s at both sides of triple girder truss, nail strap at party wall, seal penetration at top plate by deck, seal gap at top of double wall Have engineer provide correction for notched trusses at stair 1 in corridor Finish draft stop at stair 1 in corridor
STAIR TOWER 1
Corrective Action Required
10/07/2025
STAIR TOWER 2
Corrective Action Required
10/07/2025
-1st floor stringer side ok to cover -1st floor stair side ok for band -2nd floor stringer side only ok for rock
ELEVATOR 1
Corrective Action Required
10/07/2025
All Rough Inspection - Commercial Partial 10/10/2025 10/10/2025 10/10/2025
FIRST FLOOR
Corrective Action Required
10/09/2025
SECOND FLOOR
Corrective Action Required
10/09/2025
THIRD FLOOR
Corrective Action Required
10/09/2025
- roughin approved, correction completed at time of inspection.
FOURTH FLOOR
Corrective Action Required
10/09/2025
403- complete vertical draft stop Have engineer provide correction for notched trusses at stair 1 in corridor Finish draft stop at stair 1 in corridor
STAIR TOWER 1
Corrective Action Required
10/09/2025
STAIR TOWER 2
Corrective Action Required
10/09/2025
-1st floor stringer side ok to cover -1st floor stair side ok for band -2nd floor stringer side only ok for rock
ELEVATOR 1
Corrective Action Required
10/09/2025
Rated Assembly Inspection Partial 10/13/2025 10/13/2025 10/13/2025
Misc
Corrective Action Required
10/09/2025
STAIR TOWER 1
Informational
10/09/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st layer at unit and corridor-complete screw pattern 1st layer approed
STAIR TOWER 2
Informational
10/09/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st layer unit and corridor 2nd layer approved
ELEVATOR 1
Corrective Action Required
10/09/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st layer units and corridor 2nd layer approved
FIRST FLOOR
Corrective Action Required
10/09/2025
SECOND FLOOR
Corrective Action Required
10/09/2025
THIRD FLOOR
Corrective Action Required
10/09/2025
FOURTH FLOOR
Corrective Action Required
10/09/2025
All Rough Inspection - Commercial Partial 10/13/2025 10/13/2025 10/13/2025
FIRST FLOOR
Corrective Action Required
10/10/2025
- Vertical fire blocking every 10’ throughout - Secure service entrance cable within 12” of panel throughout 104 - fire block gap at top plate at tub 102 - fire block gap at top plat at dead space above tub - Fire block penetration at top plate near tub
SECOND FLOOR
Corrective Action Required
10/10/2025
- seal all vertical fire blocking 208- missing vertical fire blocking every 10' 209 - fire block penetrations of plumbing in dead space at tub
THIRD FLOOR
Corrective Action Required
10/10/2025
- roughin approved, correction completed at time of inspection.
FOURTH FLOOR
Corrective Action Required
10/10/2025
403- complete vertical draft stop Have engineer provide correction for notched trusses at stair 1 in corridor Finish draft stop at stair 1 in corridor
STAIR TOWER 1
Corrective Action Required
10/10/2025
STAIR TOWER 2
Corrective Action Required
10/10/2025
-1st floor stringer side ok to cover -1st floor stair side ok for band -2nd floor stringer side only ok for rock
ELEVATOR 1
Corrective Action Required
10/10/2025
Rated Assembly Inspection Failed 10/15/2025 10/15/2025 10/15/2025
Misc
Corrective Action Required
10/13/2025
STAIR TOWER 1
Informational
10/13/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st layer at unit and corridor-complete screw pattern 1st layer approed
STAIR TOWER 2
Informational
10/13/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st layer unit and corridor 2nd layer approved
ELEVATOR 1
Corrective Action Required
10/13/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st layer units and corridor 2nd layer approved
FIRST FLOOR
Corrective Action Required
10/13/2025
SECOND FLOOR
Corrective Action Required
10/13/2025
THIRD FLOOR
Corrective Action Required
10/13/2025
FOURTH FLOOR
Corrective Action Required
10/13/2025
Rated Assembly Inspection Not Ready 10/16/2025 10/16/2025 10/16/2025
Misc
Corrective Action Required
10/15/2025
STAIR TOWER 1
Informational
10/15/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer screw pattern ok -Remove insulation for inspection, complete draft stopping at double walls
STAIR TOWER 2
Informational
10/15/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st layer unit and corridor 2nd layer screws approved unit and corridor -Remove insulation for inspection, complete draft stopping at double walls
ELEVATOR 1
Corrective Action Required
10/15/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st layer units and corridor 2nd layer screws approved at unit and corridor -Remove insulation for inspection, complete draft stopping at double walls
FIRST FLOOR
Corrective Action Required
10/15/2025
SECOND FLOOR
Corrective Action Required
10/15/2025
THIRD FLOOR
Corrective Action Required
10/15/2025
FOURTH FLOOR
Corrective Action Required
10/15/2025
Rated Assembly Inspection Partial 10/17/2025 10/17/2025 10/17/2025
Misc
Corrective Action Required
10/16/2025
STAIR TOWER 1
Informational
10/16/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side
STAIR TOWER 2
Informational
10/16/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
10/16/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st and 2nd layer approved at unit and corridor
FIRST FLOOR
Corrective Action Required
10/16/2025
SECOND FLOOR
Corrective Action Required
10/16/2025
THIRD FLOOR
Corrective Action Required
10/16/2025
FOURTH FLOOR
Corrective Action Required
10/16/2025
RC at units and corridors
Rated Assembly Inspection Partial 10/29/2025 10/29/2025 10/29/2025
Misc
Corrective Action Required
10/17/2025
STAIR TOWER 1
Informational
10/17/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side
STAIR TOWER 2
Informational
10/17/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
10/17/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st and 2nd layer approved at unit and corridor
FIRST FLOOR
Corrective Action Required
10/17/2025
SECOND FLOOR
Corrective Action Required
10/17/2025
THIRD FLOOR
Corrective Action Required
10/17/2025
RC at units and corridors
FOURTH FLOOR
Corrective Action Required
10/17/2025
RC at units and corridors
All Rough Inspection - Commercial Partial 11/3/2025 11/3/2025 11/03/2025
FIRST FLOOR
Corrective Action Required
10/13/2025
- Vertical fire blocking every 10’ throughout - Secure service entrance cable within 12” of panel throughout 104 - fire block gap at top plate at tub 102 - fire block gap at top plat at dead space above tub - Fire block penetration at top plate near tub
SECOND FLOOR
Corrective Action Required
10/13/2025
-Units and corridor approved
THIRD FLOOR
Corrective Action Required
10/13/2025
- roughin approved, correction completed at time of inspection.
FOURTH FLOOR
Corrective Action Required
10/13/2025
403- complete vertical draft stop Have engineer provide correction for notched trusses at stair 1 in corridor Finish draft stop at stair 1 in corridor
STAIR TOWER 1
Corrective Action Required
10/13/2025
-Strap top plates where not overlapped min 48" at 3rd floor
STAIR TOWER 2
Corrective Action Required
10/13/2025
-Strap top plates where not overlapped min 48" at 3rd floor
ELEVATOR 1
Corrective Action Required
10/13/2025
Rated Assembly Inspection Partial 11/3/2025 11/3/2025 11/03/2025
Misc
Corrective Action Required
10/29/2025
STAIR TOWER 1
Informational
10/29/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side
STAIR TOWER 2
Informational
10/29/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
10/29/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st and 2nd layer approved at unit and corridor
FIRST FLOOR
Corrective Action Required
10/29/2025
SECOND FLOOR
Corrective Action Required
10/29/2025
THIRD FLOOR
Corrective Action Required
10/29/2025
RC at units and corridors
FOURTH FLOOR
Corrective Action Required
10/29/2025
RC at units and corridors -Screw pattern at units and corridor complete
Rated Assembly Inspection Partial 11/4/2025 11/4/2025 11/04/2025
Misc
Corrective Action Required
11/03/2025
STAIR TOWER 1
Informational
11/03/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side
STAIR TOWER 2
Informational
11/03/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
11/03/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st and 2nd layer approved at unit and corridor
FIRST FLOOR
Corrective Action Required
11/03/2025
SECOND FLOOR
Corrective Action Required
11/03/2025
RC at units and corridors
THIRD FLOOR
Corrective Action Required
11/03/2025
RC at units and corridors
FOURTH FLOOR
Corrective Action Required
11/03/2025
RC at units and corridors -Screw pattern at units and corridor complete
All Rough Inspection - Commercial Partial 11/4/2025 11/4/2025 11/04/2025
FIRST FLOOR
Corrective Action Required
11/03/2025
- Vertical fire blocking every 10’ throughout - Secure service entrance cable within 12” of panel throughout 104 - fire block gap at top plate at tub 102 - fire block gap at top plat at dead space above tub - Fire block penetration at top plate near tub
SECOND FLOOR
Corrective Action Required
11/03/2025
- seal all vertical fire blocking 208- missing vertical fire blocking every 10' 209 - fire block penetrations of plumbing in dead space at tub
THIRD FLOOR
Corrective Action Required
11/03/2025
- roughin approved, correction completed at time of inspection.
FOURTH FLOOR
Corrective Action Required
11/03/2025
403- complete vertical draft stop Have engineer provide correction for notched trusses at stair 1 in corridor Finish draft stop at stair 1 in corridor
STAIR TOWER 1
Corrective Action Required
11/03/2025
Complete
STAIR TOWER 2
Corrective Action Required
11/03/2025
Complete
ELEVATOR 1
Corrective Action Required
11/03/2025
All Rough Inspection - Commercial Partial 11/05/2025
FIRST FLOOR
Corrective Action Required
11/04/2025
104 - fire block gap at top plate at tub
SECOND FLOOR
Corrective Action Required
11/04/2025
- seal all vertical fire blocking 208- missing vertical fire blocking every 10' 209 - fire block penetrations of plumbing in dead space at tub
THIRD FLOOR
Corrective Action Required
11/04/2025
- roughin approved, correction completed at time of inspection.
FOURTH FLOOR
Corrective Action Required
11/04/2025
403- complete vertical draft stop Have engineer provide correction for notched trusses at stair 1 in corridor Finish draft stop at stair 1 in corridor
STAIR TOWER 1
Corrective Action Required
11/04/2025
Complete
STAIR TOWER 2
Corrective Action Required
11/04/2025
Complete
ELEVATOR 1
Corrective Action Required
11/04/2025
Electrical Service Inspection Failed 11/5/2025 11/5/2025 11/05/2025
Miscellaneous Correction
Corrective Action Required
11/05/2025
-Install permanent address at disconnect and label house panel -Provide listing for compression connector at ufer
Rated Assembly Inspection Partial 11/5/2025 11/5/2025 11/05/2025
Misc
Corrective Action Required
11/04/2025
STAIR TOWER 1
Informational
11/04/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side
STAIR TOWER 2
Informational
11/04/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
11/04/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st and 2nd layer approved at unit and corridor
FIRST FLOOR
Corrective Action Required
11/04/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
11/04/2025
RC at units and corridors
THIRD FLOOR
Corrective Action Required
11/04/2025
RC at units and corridors
FOURTH FLOOR
Corrective Action Required
11/04/2025
RC at units and corridors -Screw pattern at units and corridor complete
All Rough Inspection - Commercial Failed 11/6/2025 11/6/2025 11/06/2025
FIRST FLOOR
Corrective Action Required
11/05/2025
104 - fire block gap at top plate at tub
SECOND FLOOR
Corrective Action Required
11/05/2025
- seal all vertical fire blocking 208- missing vertical fire blocking every 10' 209 - fire block penetrations of plumbing in dead space at tub
THIRD FLOOR
Corrective Action Required
11/05/2025
- roughin approved, correction completed at time of inspection.
FOURTH FLOOR
Corrective Action Required
11/05/2025
403- complete vertical draft stop Have engineer provide correction for notched trusses at stair 1 in corridor Finish draft stop at stair 1 in corridor
STAIR TOWER 1
Corrective Action Required
11/05/2025
Complete
STAIR TOWER 2
Corrective Action Required
11/05/2025
Complete
ELEVATOR 1
Corrective Action Required
11/05/2025
Rated Assembly Inspection Partial 11/10/2025 11/10/2025 11/10/2025
Misc
Corrective Action Required
11/05/2025
STAIR TOWER 1
Informational
11/05/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side
STAIR TOWER 2
Informational
11/05/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
11/05/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor 1st and 2nd layer approved at unit and corridor
FIRST FLOOR
Corrective Action Required
11/05/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
11/05/2025
RC at units and corridors
THIRD FLOOR
Corrective Action Required
11/05/2025
RC at units and corridors - Screw pattern of third floor rooms complete
FOURTH FLOOR
Corrective Action Required
11/05/2025
RC at units and corridors -Screw pattern at units and corridor complete
Electrical Service Inspection Passed 11/12/2025 11/12/2025 11/12/2025
Miscellaneous Correction
Informational
11/12/2025
Service for 31 units and house panel approved
Rated Assembly Inspection Partial 11/18/2025 11/18/2025 11/18/2025
Misc
Corrective Action Required
11/10/2025
STAIR TOWER 1
Informational
11/10/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side
STAIR TOWER 2
Informational
11/10/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
11/10/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor
FIRST FLOOR
Corrective Action Required
11/10/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
11/10/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
11/10/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
11/10/2025
RC at units and corridors -Screw pattern at units and corridor complete
Rated Assembly Inspection Failed 12/1/2025 12/1/2025 12/01/2025
Misc
Corrective Action Required
11/18/2025
STAIR TOWER 1
Informational
11/18/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
11/18/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
11/18/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor
FIRST FLOOR
Corrective Action Required
11/18/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
11/18/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
11/18/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
11/18/2025
RC at units and corridors -Screw pattern at units and corridor complete
Rated Assembly Inspection Failed 12/3/2025 12/3/2025 12/03/2025
Misc
Corrective Action Required
12/01/2025
STAIR TOWER 1
Informational
12/01/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
12/01/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
12/01/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor
FIRST FLOOR
Corrective Action Required
12/01/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
12/01/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
12/01/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
12/01/2025
RC at units and corridors -Screw pattern at units and corridor complete ***12/3/25 -Seal gaps and penetrations at soffits
Rated Assembly Inspection Partial 12/10/2025 12/10/2025 12/10/2025
Misc
Corrective Action Required
12/03/2025
STAIR TOWER 1
Informational
12/03/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
12/03/2025
1st floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern at stringer side only 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridior side above ceiling 1st layer band at stair side for landings 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
12/03/2025
Elevator: 1st floor - missing screws a south west corner 2nd floor: - missing screws a south west corner 3rd floor: - missing screws a south west corner 4th floor
FIRST FLOOR
Corrective Action Required
12/03/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
12/03/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
12/03/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
12/03/2025
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Rated Assembly Inspection Partial 12/11/2025 12/11/2025 12/11/2025
Misc
Corrective Action Required
12/10/2025
STAIR TOWER 1
Informational
12/10/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
12/10/2025
1st floor: 2nd layer band at stair side for landings 2nd layer band behind stringer ok 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridor side above ceiling 1st layer screw pattern 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
12/10/2025
Elevator: 1st layer at interior walls 1st layer and RC at ceiling
FIRST FLOOR
Corrective Action Required
12/10/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
12/10/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
12/10/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
12/10/2025
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Rated Assembly Inspection Failed 12/18/2025 12/18/2025 12/18/2025
Misc
Corrective Action Required
12/11/2025
STAIR TOWER 1
Informational
12/11/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
12/11/2025
1st floor: 2nd layer band at stair side for landings 2nd layer band behind stringer ok 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridor side above ceiling 1st layer screw pattern 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
12/11/2025
Elevator: 1st layer at interior walls 1st layer and RC at ceiling ***2nd layer at walls -Complete screw pattern
FIRST FLOOR
Corrective Action Required
12/11/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
12/11/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
12/11/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
12/11/2025
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Rated Assembly Inspection Partial 12/22/2025 12/22/2025 12/22/2025
Misc
Corrective Action Required
12/18/2025
STAIR TOWER 1
Informational
12/18/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
12/18/2025
1st floor: 2nd layer band at stair side for landings 2nd layer band behind stringer ok 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridor side above ceiling 1st layer screw pattern 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
12/18/2025
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
12/18/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
12/18/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
12/18/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
12/18/2025
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
All Rough Inspection - Commercial Partial 12/24/2025 12/24/2025
FIRST FLOOR
Corrective Action Required
11/06/2025
104 - fire block gap at top plate at tub
SECOND FLOOR
Corrective Action Required
11/06/2025
Complete
THIRD FLOOR
Corrective Action Required
11/06/2025
Complete
FOURTH FLOOR
Corrective Action Required
11/06/2025
Complete
STAIR TOWER 1
Corrective Action Required
11/06/2025
Complete
STAIR TOWER 2
Corrective Action Required
11/06/2025
Complete
ELEVATOR 1
Corrective Action Required
11/06/2025
Rated Assembly Inspection Failed 12/24/2025 12/24/2025
Misc
Corrective Action Required
12/22/2025
STAIR TOWER 1
Informational
12/22/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
12/22/2025
1st floor: 2nd layer band at stair side for landings 2nd layer band behind stringer ok 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridor side above ceiling 1st layer screw pattern 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
12/22/2025
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
12/22/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
12/22/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
12/22/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
12/22/2025
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Corrective Action Required
12/24/2025
-Building 8 garage needs all missing fire blocking addressed in all bays
Rated Assembly Inspection Failed 1/2/2026 1/2/2026 01/02/2026
Misc
Corrective Action Required
12/24/2025
STAIR TOWER 1
Informational
12/24/2025
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
12/24/2025
1st floor: 2nd layer band at stair side for landings 2nd layer band behind stringer ok 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridor side above ceiling 1st layer screw pattern 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
12/24/2025
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
12/24/2025
RC at units and corridors
SECOND FLOOR
Corrective Action Required
12/24/2025
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
12/24/2025
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
12/24/2025
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Corrective Action Required
12/24/2025
-Building 8 garage needs all missing fire blocking addressed in all bays
Rated Assembly Inspection Failed 01/06/2026
Misc
Corrective Action Required
01/02/2026
STAIR TOWER 1
Informational
01/02/2026
1st floor: 1st layer band at stair side for landings 1st layer band at corridor side above ceiling 1st layer approved 2nd floor: 1st layer band at corridor side above ceiling 1st layer approoved 4th floor 1st and 2nd layer ok at unit and corridor side -
STAIR TOWER 2
Informational
01/02/2026
1st floor: 2nd layer band at stair side for landings 2nd layer band behind stringer ok 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridor side above ceiling 1st layer screw pattern 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
01/02/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/02/2026
RC at units and corridors -Complete rated assembly per design at garage separation walls
SECOND FLOOR
Corrective Action Required
01/02/2026
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
01/02/2026
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
01/02/2026
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Corrective Action Required
01/02/2026
-Building 8 garage needs all missing fire blocking addressed in all bays
All Rough Inspection - Commercial Not Ready 1/6/2026 1/6/2026 01/06/2026
FIRST FLOOR
Corrective Action Required
12/24/2025
104 - fire block gap at top plate at tub ***Not ready 1/6/26
SECOND FLOOR
Corrective Action Required
12/24/2025
Complete
THIRD FLOOR
Corrective Action Required
12/24/2025
Complete
FOURTH FLOOR
Corrective Action Required
12/24/2025
Complete
STAIR TOWER 1
Corrective Action Required
12/24/2025
Complete
STAIR TOWER 2
Corrective Action Required
12/24/2025
Complete
ELEVATOR 1
Corrective Action Required
12/24/2025
All Rough Inspection - Commercial Passed 1/9/2026 1/9/2026 01/09/2026
FIRST FLOOR
Resolved
01/09/2026
SECOND FLOOR
Resolved
01/09/2026
Complete
THIRD FLOOR
Resolved
01/09/2026
Complete
FOURTH FLOOR
Resolved
01/09/2026
Complete
STAIR TOWER 1
Resolved
01/09/2026
Complete
STAIR TOWER 2
Resolved
01/09/2026
Complete
ELEVATOR 1
Resolved
01/09/2026
Rated Assembly Inspection Partial 1/16/2026 1/16/2026 01/16/2026
Misc
Corrective Action Required
01/06/2026
STAIR TOWER 1
Informational
01/06/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -1st layer walls and ceiling
STAIR TOWER 2
Informational
01/06/2026
1st floor: 2nd layer band at stair side for landings 2nd layer band behind stringer ok 1st layer approved 2nd floor: 1st and 2nd layer band at stair side for landings 1st layer screw pattern 2nd layer band behind stringer ok 3rd floor: 1st layer band at corridor side above ceiling 1st layer screw pattern 2nd layer strip for stringers 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor
ELEVATOR 1
Corrective Action Required
01/06/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/06/2026
RC at units and corridors -Complete rated assembly per design at garage separation walls
SECOND FLOOR
Corrective Action Required
01/06/2026
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
01/06/2026
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
01/06/2026
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Corrective Action Required
01/06/2026
-Building 8 garage needs all missing fire blocking addressed in all bays
Rated Assembly Inspection Partial 1/21/2026 1/21/2026 01/21/2026
Misc
Corrective Action Required
01/16/2026
STAIR TOWER 1
Informational
01/16/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -1st layer walls and ceiling
STAIR TOWER 2
Informational
01/16/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer-PATCH ROCK FROM STUD TO STUD
ELEVATOR 1
Corrective Action Required
01/16/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/16/2026
RC at units and corridors -Complete rated assembly per design at garage separation walls -RC AT GARAGES AND STORAGE UNITS NOT READY-MISSING RC, MISSING SUPPORTS FOR RC
SECOND FLOOR
Corrective Action Required
01/16/2026
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
01/16/2026
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
01/16/2026
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Corrective Action Required
01/16/2026
-Building 8 garage needs all missing fire blocking addressed in all bays
All Rough Inspection - Commercial Not Ready 1/23/2026 1/23/2026 01/23/2026
Misc
Corrective Action Required
01/23/2026
*Inspection for riser room and mechanical room -NOT READY, remove insulation for inspection
Rated Assembly Inspection Not Ready 1/23/2026 1/23/2026 01/23/2026
Misc
Corrective Action Required
01/21/2026
STAIR TOWER 1
Informational
01/21/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -1st layer walls and ceiling
STAIR TOWER 2
Informational
01/21/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer-PATCH ROCK FROM STUD TO STUD
ELEVATOR 1
Corrective Action Required
01/21/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/21/2026
RC at units and corridors -Complete rated assembly per design at garage separation walls -RC AT GARAGES AND STORAGE UNITS NOT READY-MISSING RC, MISSING SUPPORTS FOR RC
SECOND FLOOR
Corrective Action Required
01/21/2026
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
01/21/2026
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
01/21/2026
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Corrective Action Required
01/21/2026
-Building 8 garage needs all missing fire blocking addressed in all bays
All Rough Inspection - Commercial Failed 1/27/2026 1/27/2026 01/27/2026
Misc
Corrective Action Required
01/23/2026
*Inspection for riser room and mechanical room -NOT READY, remove insulation for inspection
Rated Assembly Inspection Partial 1/27/2026 1/27/2026 01/27/2026
Misc
Corrective Action Required
01/23/2026
STAIR TOWER 1
Informational
01/23/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -1st layer walls and ceiling
STAIR TOWER 2
Informational
01/23/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer at walls and ceiling
ELEVATOR 1
Corrective Action Required
01/23/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/23/2026
RC at units and corridors -Complete rated assembly per design at garage separation walls -RC AT GARAGES AND STORAGE UNITS APPROVED EXCEPT AS NOTED: Garage 1, riser and mechanical room
SECOND FLOOR
Corrective Action Required
01/23/2026
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Corrective Action Required
01/23/2026
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Corrective Action Required
01/23/2026
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Corrective Action Required
01/23/2026
-Building 8 garage needs all missing fire blocking addressed in all bays
All Rough Inspection - Commercial Passed 1/28/2026 1/28/2026 01/28/2026
Misc
Resolved
01/28/2026
*Inspection for riser room and mechanical room -NOT READY, remove insulation for inspection
Rated Assembly Inspection Partial 01/28/2026
Misc
Corrective Action Required
01/27/2026
STAIR TOWER 1
Informational
01/27/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -1st layer walls and ceiling
STAIR TOWER 2
Informational
01/27/2026
1st floor: complete-TAPE BEHIND WALL UNDER STAIRS-DO NOT COVER UNTIL INSPECTED 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer at walls and ceiling
ELEVATOR 1
Corrective Action Required
01/27/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/27/2026
RC at units and corridors -RC AT GARAGES AND STORAGE UNITS
SECOND FLOOR
Resolved
01/28/2026
RC at units and corridors -Screw pattern at units and corridor complete
THIRD FLOOR
Resolved
01/28/2026
RC at units and corridors -Screw pattern at units and corridor complete
FOURTH FLOOR
Resolved
01/28/2026
RC at units and corridors -Screw pattern at units and corridor complete -Soffits ok to cover
Misc
Resolved
01/28/2026
-Building 8 garage needs all missing fire blocking addressed in all bays
Rated Assembly Inspection Partial 1/29/2026 1/29/2026 01/29/2026
Misc
Corrective Action Required
01/28/2026
STAIR TOWER 1
Informational
01/28/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -2nd layer walls -1st layer and RC at ceiling
STAIR TOWER 2
Informational
01/28/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer at walls and ceiling
ELEVATOR 1
Corrective Action Required
01/28/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/28/2026
RC at units and corridors -RC AT GARAGES AND STORAGE UNITS
Rated Assembly Inspection Partial 1/30/2026 1/30/2026 01/30/2026
Misc
Corrective Action Required
01/29/2026
STAIR TOWER 1
Informational
01/29/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -2nd layer walls -1st layer and RC at ceiling
STAIR TOWER 2
Informational
01/29/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer at walls and ceiling
ELEVATOR 1
Corrective Action Required
01/29/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/29/2026
RC at units and corridors -RC AT GARAGES AND STORAGE UNITS -Screw pattern at garages and storage units except: Garage 1, Storage 6, Garage 10, sprinkler and mechanical rooms
Rated Assembly Inspection Partial 2/2/2026 2/2/2026 02/02/2026
Misc
Corrective Action Required
01/30/2026
STAIR TOWER 1
Informational
01/30/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -2nd layer walls -1st, 2nd layer and RC at ceiling
STAIR TOWER 2
Informational
01/30/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer at walls and ceiling
ELEVATOR 1
Corrective Action Required
01/30/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
01/30/2026
RC at units and corridors -RC AT GARAGES AND STORAGE UNITS -Screw pattern at garages and storage units except: Garage 1, Storage 6, Garage 10, sprinkler and mechanical rooms
Rated Assembly Inspection Partial 2/3/2026 2/3/2026 02/03/2026
Misc
Corrective Action Required
02/02/2026
STAIR TOWER 1
Informational
02/02/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor 1st and 2nd layer ok at unit and corridor side -2nd layer walls -1st, 2nd layer and RC at ceiling
STAIR TOWER 2
Informational
02/02/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer and RC at walls and ceiling
ELEVATOR 1
Corrective Action Required
02/02/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
02/02/2026
RC at units and corridors -RC AT GARAGES AND STORAGE UNITS -Screw pattern at garages and storage units except: Garage 1, Storage 6, Garage 10, sprinkler and mechanical rooms
Rated Assembly Inspection Partial 2/5/2026 2/5/2026 02/05/2026
Misc
Corrective Action Required
02/03/2026
STAIR TOWER 1
Informational
02/03/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
02/03/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st layer and RC at walls and ceiling
ELEVATOR 1
Corrective Action Required
02/03/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
02/03/2026
RC at units and corridors -RC AT GARAGES AND STORAGE UNITS -Screw pattern at garages and storage units except: Garage 1, Storage 6, Garage 10, sprinkler and mechanical rooms
Rated Assembly Inspection Partial 2/17/2026 2/17/2026 02/17/2026
Misc
Corrective Action Required
02/05/2026
STAIR TOWER 1
Informational
02/05/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
02/05/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor 1st and 2nd layer strip for landing 1st and 2nd layer approved unit and corridor 1st and 2nd layer and RC at walls and ceiling
ELEVATOR 1
Corrective Action Required
02/05/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
02/05/2026
Complete
Rated Assembly Inspection Partial 2/19/2026 2/19/2026 02/19/2026
Misc
Corrective Action Required
02/17/2026
STAIR TOWER 1
Informational
02/17/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
02/17/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
02/17/2026
Elevator: 1st and 2nd layer at interior walls 1st,2nd layer and RC at ceilings
FIRST FLOOR
Corrective Action Required
02/17/2026
Complete
Rated Assembly Inspection Partial 3/10/2026 3/10/2026 03/10/2026
Misc
Corrective Action Required
02/19/2026
STAIR TOWER 1
Informational
02/19/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
02/19/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
02/19/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st and 4th floor corridor side interior wall
FIRST FLOOR
Corrective Action Required
02/19/2026
Complete
Rated Assembly Inspection Partial 3/11/2026 3/11/2026 03/11/2026
Misc
Corrective Action Required
03/10/2026
STAIR TOWER 1
Informational
03/10/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
03/10/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
03/10/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st-4th floor corridor side interior wall
FIRST FLOOR
Corrective Action Required
03/10/2026
Complete
Rated Assembly Inspection Partial 3/13/2026 3/13/2026 03/13/2026
Misc
Corrective Action Required
03/11/2026
STAIR TOWER 1
Informational
03/11/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
03/11/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
03/11/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st-4th floor corridor side interior wall - 2nd layer infill at door elevator shaft
FIRST FLOOR
Corrective Action Required
03/11/2026
Complete
Rated Assembly Inspection Failed 3/16/2026 3/16/2026 03/16/2026
Misc
Corrective Action Required
03/13/2026
STAIR TOWER 1
Informational
03/13/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
03/13/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
03/13/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st-4th floor corridor side interior wall - 2nd layer infill at door elevator shaft
FIRST FLOOR
Corrective Action Required
03/13/2026
Complete
Rated Assembly Inspection Partial 3/18/2026 3/18/2026 03/18/2026
Misc
Corrective Action Required
03/16/2026
STAIR TOWER 1
Informational
03/16/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
03/16/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
03/16/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st-4th floor corridor side interior wall - 2nd layer infill at door elevator shaft -1st layer lobby all floors
FIRST FLOOR
Corrective Action Required
03/16/2026
Complete
Rated Assembly Inspection Partial 3/19/2026 3/19/2026 03/19/2026
Misc
Corrective Action Required
03/18/2026
STAIR TOWER 1
Informational
03/18/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
03/18/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
03/18/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st-4th floor corridor side interior wall - 2nd layer infill at door elevator shaft -1st layer lobby all floors -2nd layer at lobby 3-4 floor
FIRST FLOOR
Corrective Action Required
03/18/2026
Complete
Rated Assembly Inspection Partial 3/25/2026 3/25/2026 03/25/2026
Misc
Corrective Action Required
03/19/2026
STAIR TOWER 1
Informational
03/19/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Informational
03/19/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Corrective Action Required
03/19/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st-4th floor corridor side interior wall - 2nd layer infill at door elevator shaft -1st layer lobby all floors -2nd layer at lobby all floors
FIRST FLOOR
Corrective Action Required
03/19/2026
Complete
Rated Assembly Inspection Passed 4/2/2026 4/2/2026 04/02/2026
Misc
Resolved
04/02/2026
STAIR TOWER 1
Resolved
04/02/2026
1st floor: complete 2nd floor: complete 3rd floor complete 4th floor complete
STAIR TOWER 2
Resolved
04/02/2026
1st floor: complete 2nd floor: Complete 3rd floor: Complete 4th floor complete
ELEVATOR 1
Resolved
04/02/2026
Elevator: 1st and 2nd layer at unit side interior walls 1st,2nd layer and RC at ceilings -1st layer at 1st-4th floor corridor side interior wall - 2nd layer infill at door elevator shaft -1st layer lobby all floors -2nd layer at lobby all floors
FIRST FLOOR
Resolved
04/02/2026
Complete
Miscellaneous Inspection Failed 4/2/2026 4/2/2026 04/02/2026
Misc
Corrective Action Required
04/02/2026
Not Ready
Piers/Caissons Inspection - Commercial Passed 04/02/2026
Misc
Resolved
04/02/2026
(2) of (10) piers for deck posts
Underslab Electrical Inspection - Commercial Passed 04/02/2026
Misc
Resolved
04/02/2026
APPROVED AREAS: - Condui for 3 units from wall to island - 3 data conduits on East side
Footing Inspection - Commercial Passed 04/02/2026
Miscellaneous Inspection Partial 4/3/2026 4/3/2026 04/03/2026
Misc
Corrective Action Required
04/02/2026
4th floor units only approved
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit