Permit Application Status

PRCOM20250182


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20250182
Building Permit - Commercial
Issued - Partial
OLDHAM INVESTORS LLC
NEW COMMERCIAL
CHICK-FIL-A - NEW RESTAURANT WITH DINE IN AND DRIVE THRU
01/17/2025
08/18/2025
08/03/2025
Locations
Contacts
JE FOSTER BUILDING CO, Address:108 Green Park Industrial Ct.   
JE Foster Building Company, Address:108 Green Park Industrial Ct. , Phone:(314) 842-3300  
METALCRAFT INC, Address:5138 MERRIAM DR., Phone:(913) 707-8824  
RODINA COMPANY INC, Address:1204 N 59TH ST, Phone:(913) 334-5336  
C & C MECHANICAL LLC, Address:20 S OSAGE ST., Phone:(816) 255-8842  
CHIPMAN DESIGN ARCHITECTURE, Address:1350 E TOUHY AVE FIRST FLOOR EAST, Phone:(847) 298-6900  
OLDHAM INVESTORS LLC, Address:7200 W 132ND ST STE 150  
Not shown for privacy reasons.
Bull Creek Construction, LLC, Address:6418 College Blvd  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 02/03/2025 08/04/2025
Joe Frogge
Final Development Plan
Resolved
08/04/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
01/31/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. After credit for previous mercantile occupant the fee will be $57,684.00 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process).
Misc
Resolved
08/04/2025

Demolition permits are required to remove existing buildings. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
01/31/2025

Health Department Inspection (food) For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
Final Development Plan Review Approved 07/25/2025 07/14/2025
Grant White
Health Department Review Approved 02/13/2025
Joe Frogge
Fire Plan Review Approved with Conditions 02/03/2025 02/04/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
02/04/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
02/04/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Licensed Contractors Approved 02/03/2025 01/31/2025
Joe Frogge
LC - General Contractor
Resolved
09/03/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Resolved
09/03/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Commercial Excise Tax Fee $70,133.25 $12,276.00 Paid 01/31/2025
$12,449.25
Parks Impact Fee Non-Residential - Zone 4 $1,029.20 $1,029.20 Paid 08/15/2025
Sanitary Sewer Insp Fees $59.76 $59.76 Paid 08/15/2025
Water Insp Fee $470.52 $470.52 Paid 08/15/2025
Storm Sewer Inspection Fee $1,063.78 $1,063.78 Paid 08/15/2025
Paved Surface Inspection Fee $5,324.66 $5,324.66 Paid 08/15/2025
Site Grading Fee $2,308.94 $2,308.94 Paid 08/15/2025
Water Test Fee $200.00 $200.00 Paid 08/15/2025
Water Meter Fee $3,922.34 $3,922.34 Paid 08/15/2025
Sanitary Sewer Development Fee $15,995.00 $15,995.00 Paid 08/15/2025
Right of Way Permit Fee $85.00 $85.00 Paid 08/15/2025
Water Tap Fee $27,200.00 $27,200.00 Paid 08/15/2025
Outstanding Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $3,400.00 $0.00 $3,400.00 Not Paid
Commercial Excise Tax Fee $70,133.25 $12,449.25 $57,684.00 Not Paid
$12,449.25


$61,084.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Pending
Footing Inspection - Commercial Pending
Underslab Plumbing Inspection - Commercial Pending
Water Service Inspection Pending
Grading/Excavation/Fill Inspection Pending
Pavement-Proof Roll Pending
Pavement-Surface Pending
Install Street and Stop Signs Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Underslab Electrical Inspection - Commercial Pending
Storm Sewer Construction Inspection Pending
Misc
Informational
08/28/2025
8-22-25 Dustin A, Storm has been laid and boxes 1-3 -1-5 have been set. Informed contractor of flowable fill requirements around structures . 8-25-25 Dustin A, working on storm, 1-4 thru 1-2 set , inverts and flow fill in place. working towards 1-1 8-26-25 Dustin A, pouring collars
Site Visit Pending
Misc
Informational
09/08/2025
8-25-25 Dustin A, working on storm, 1-4 thru 1-2 set , inverts and flow fill in place. working towards 1-1 8-26-25 Dustin A, pouring collars 8-28-25 Dustin A, Working on sewer service . Cannot hook up to sewer stub until sewer is released. 9-8-25 Dustin A, No work being done
Underground Electrical Inspection - Commercial Pending
Misc
Informational
09/10/2025
The following areas inspected -underground conduit for light poles
Sanitary Sewer Construction Inspection Pending
Misc
Informational
09/11/2025
8-28-25 Dustin A, Working on sewer service, contractor is aware that cannot attach to existing stub until sewer is released. 9-10-25 Dustin A, Contractor hooked sewer service up to a sewer main that was not released yet. Informed contractor that would need to be dug up and unconnected from the sewer stub until sewer is released. 9-11-25 Dustin A, Contractor is digging up sewer service to disconnect unapproved connection
Erosion Control Inspection Pending
Misc
Informational
09/15/2025
8-20-25 Dustin A. ESC is in place, no construction entrance due to lack of road at this time 8-26-25 Dustin A, Esc is in place for the conditions of site 9-15-26 Dustin A , Erosion control needs fixed. Talked with logan and it was coming this week. They are pouring curbs and parking lot soon so there is no reason for a construction entrance at this point.
Water Line - Construction Inspection Pending
Misc
Informational
09/15/2025
9-15-25 Dustin A, Working on running fire line under what would be paved surfaces. Pouring thrust blocks for hydrant near trash enclosure today. prepping for vault and ran sump line to storm drain.
Pavement-Aggregate Base Pending
Misc
Informational
09/15/2025
9-15-25 Dustin A, Started laying geogrid for parking
Erosion Control Inspection Partial 08/20/2025
Misc
Informational
08/20/2025
8-20-25 Dustin A. ESC is in place, no construction entrance due to lack of road at this time
Storm Sewer Construction Inspection Partial 08/22/2025
Misc
Informational
08/22/2025
8-22-25 Dustin A, Storm has been laid and boxes 1-3 -1-5 have been set. Informed contractor of flowable fill requirements around structures .
Erosion Control Inspection Partial 08/26/2025
Misc
Informational
08/20/2025
8-20-25 Dustin A. ESC is in place, no construction entrance due to lack of road at this time 8-26-25 Dustin A, Esc is in place for the conditions of site
Site Visit Partial 08/26/2025
Misc
Informational
08/26/2025
8-25-25 Dustin A, working on storm, 1-4 thru 1-2 set , inverts and flow fill in place. working towards 1-1
Storm Sewer Construction Inspection Partial 08/26/2025
Misc
Informational
08/22/2025
8-22-25 Dustin A, Storm has been laid and boxes 1-3 -1-5 have been set. Informed contractor of flowable fill requirements around structures . 8-25-25 Dustin A, working on storm, 1-4 thru 1-2 set , inverts and flow fill in place. working towards 1-1
Site Visit Partial 8/28/2025 8/28/2025 08/28/2025
Misc
Informational
08/26/2025
8-25-25 Dustin A, working on storm, 1-4 thru 1-2 set , inverts and flow fill in place. working towards 1-1 8-26-25 Dustin A, pouring collars 8-28-25 Dustin A, Working on sewer service . Cannot hook up to sewer stub until sewer is released.
Sanitary Sewer Construction Inspection Partial 8/28/2025 8/28/2025 08/28/2025
Misc
Informational
08/28/2025
8-28-25 Dustin A, Working on sewer service, contractor is aware that cannot attach to existing stub until sewer is released.
Storm Sewer Construction Inspection Partial 8/28/2025 8/28/2025 08/28/2025
Misc
Informational
08/26/2025
8-22-25 Dustin A, Storm has been laid and boxes 1-3 -1-5 have been set. Informed contractor of flowable fill requirements around structures . 8-25-25 Dustin A, working on storm, 1-4 thru 1-2 set , inverts and flow fill in place. working towards 1-1 8-26-25 Dustin A, pouring collars
Site Visit Partial 09/08/2025
Misc
Informational
08/28/2025
8-25-25 Dustin A, working on storm, 1-4 thru 1-2 set , inverts and flow fill in place. working towards 1-1 8-26-25 Dustin A, pouring collars 8-28-25 Dustin A, Working on sewer service . Cannot hook up to sewer stub until sewer is released. 9-8-25 Dustin A, No work being done
Underground Electrical Inspection - Commercial Partial 9/10/2025 9/10/2025 09/10/2025
Misc
Informational
09/10/2025
The following areas inspected -underground conduit for light poles
Sanitary Sewer Construction Inspection Partial 09/11/2025
Misc
Informational
08/28/2025
8-28-25 Dustin A, Working on sewer service, contractor is aware that cannot attach to existing stub until sewer is released. 9-10-25 Dustin A, Contractor hooked sewer service up to a sewer main that was not released yet. Informed contractor that would need to be dug up and unconnected from the sewer stub until sewer is released. 9-11-25 Dustin A, Contractor is digging up sewer service to disconnect unapproved connection
Erosion Control Inspection Partial 9/15/2025 9/15/2025 09/15/2025
Misc
Informational
08/26/2025
8-20-25 Dustin A. ESC is in place, no construction entrance due to lack of road at this time 8-26-25 Dustin A, Esc is in place for the conditions of site 9-15-26 Dustin A , Erosion control needs fixed. Talked with logan and it was coming this week. They are pouring curbs and parking lot soon so there is no reason for a construction entrance at this point.
Water Line - Construction Inspection Partial 9/15/2025 9/15/2025 09/15/2025
Misc
Informational
09/15/2025
9-15-25 Dustin A, Working on running fire line under what would be paved surfaces. Pouring thrust blocks for hydrant near trash enclosure today. prepping for vault and ran sump line to storm drain.
Pavement-Aggregate Base Partial 9/15/2025 9/15/2025 09/15/2025
Misc
Informational
09/15/2025
9-15-25 Dustin A, Started laying geogrid for parking
Documents & Images
Date Uploaded File Type Document Name
01/17/2025 Application Form APPLICATION
01/20/2025 Plans CFA 05248 Oldham Village FSU - Permit set
01/20/2025 Engineer Report/Study 78797 CFA#05248 ORDER CANOPY CALCS
01/20/2025 Plans 78797 CFA#05248 ORDER CANOPY DRAWINGS
01/20/2025 Engineer Report/Study 78798 CFA#05248 OMD CANOPY CALCS
01/20/2025 Plans 78798 CFA#05248 OMD CANOPY DRAWINGS
01/20/2025 Engineer Report/Study CFA #5248 - Lees Summit, MO - Mech and Envelope Comcheck
01/20/2025 Engineer Report/Study CFA#05248 Calculation Package
01/20/2025 Engineer Report/Study COMcheck-Web_compliance_report_20241118_064404_125
01/21/2025 Email 05248 Health approval
01/31/2025 Letter License Tax Bill
02/04/2025 Letter DS P/R Corrections Document
07/14/2025 Approved Plans Approved FDP_Chick Fil A_Oldham Village_7.14.2025_PL2025014
08/04/2025 Approved Plans Approved building plans
08/04/2025 Approved Plans Approved detached canopy plans
08/04/2025 Approved Plans Approved attached canopy plans
08/15/2025 Receipt Receipt for transaction:2025-006449
08/18/2025 Letter DS Building Permit - Site work only
08/20/2025 Letter INSPECTION SUMMARY
08/22/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
08/28/2025 Letter INSPECTION SUMMARY
08/28/2025 Letter INSPECTION SUMMARY
08/28/2025 Letter INSPECTION SUMMARY
09/08/2025 Letter INSPECTION SUMMARY
09/10/2025 Letter INSPECTION SUMMARY
09/11/2025 Letter INSPECTION SUMMARY
09/15/2025 Letter INSPECTION SUMMARY
09/15/2025 Letter INSPECTION SUMMARY
09/15/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home