Permit Application Status

PRCOM20246374


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20246374
Building Permit - Commercial
Issued
MIDWEST DIVISION LSH LLC
ADDITION COMMERCIAL
LEE'S SUMMIT MEDICAL CENTER - ADDITION/RENOVATION 2024 - IP BED EXPANSION- WEST BRIDGE AND PARKING LOT.
12/12/2024
08/06/2025
06/28/2025
Locations
Contacts
NABHOLZ CONSTRUCTION CORPORATION, Address:PO BOX 2090, Phone:(501) 505-5800  
Lelan Olsen - Nabholz Construction, Phone:(913) 490-6082  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
ELECTRICAL CORP OF AMERICA, Address:7320 ARLINGTON, Phone:(816) 737-3206  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
Devenney Group, Address:6900 East Camelback Road, Phone:(602) 943-8950  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Don Kelley - Nabholz Construction, Phone:(913) 353-2531  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 11/26/2025 11/24/2025
Craig Hill
Misc
Corrective Action Required
11/21/2025

Information Only: For alarm test call (816) 696-1300 one business day before needing the test.
Fire Plan Review Approved with Conditions 11/25/2025 11/21/2025
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
11/18/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/18/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Sprinkler Plan Review Released for Construction 11/21/2025 11/21/2025
Craig Hill
Building Plan Review Rejected 11/25/2025 11/20/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
11/18/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $51,001.50 2/11/2025 - Acknowledged in letter.
Misc
Corrective Action Required
11/18/2025

Inadequate information as concerns fire rated assemblies to complete review. Provide the following: - Provide complete UL details for fire rated assemblies. Must, at a minimum, include nail/screw patterns. 2/11/2025 - Deferred per request. - -
Misc
Corrective Action Required
11/18/2025

Plans submitted are for multiple projects. After review is complete and approved we will create the other permits. (MOB vs. Hospital vs. Pedestrian walkway) Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
11/18/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
11/20/2025

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of doors adjacent to new curtains.
Fire Plan Review Approved with Conditions 09/17/2025 09/18/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
09/09/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
09/09/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Approved with Conditions 09/17/2025 09/15/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
09/09/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $51,001.50 2/11/2025 - Acknowledged in letter.
Misc
Corrective Action Required
09/09/2025

Inadequate information as concerns fire rated assemblies to complete review. Provide the following: - Provide complete UL details for fire rated assemblies. Must, at a minimum, include nail/screw patterns. 2/11/2025 - Deferred per request. - -
Misc
Corrective Action Required
09/09/2025

Plans submitted are for multiple projects. After review is complete and approved we will create the other permits. (MOB vs. Hospital vs. Pedestrian walkway) Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
09/09/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
Licensed Contractors Approved 02/14/2025 07/28/2025
Joe Frogge
LC - MEP Subs
Resolved
07/01/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 2/11/2025 - This comment was unintentionally left off of original report.
LC - General Contractor
Resolved
02/11/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
Building Plan Review Approved with Conditions 07/25/2025 07/28/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
07/21/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $51,001.50 2/11/2025 - Acknowledged in letter.
Misc
Corrective Action Required
07/21/2025

Inadequate information as concerns fire rated assemblies to complete review. Provide the following: - Provide complete UL details for fire rated assemblies. Must, at a minimum, include nail/screw patterns. 2/11/2025 - Deferred per request. - -
Misc
Corrective Action Required
07/21/2025

Plans submitted are for multiple projects. After review is complete and approved we will create the other permits. (MOB vs. Hospital vs. Pedestrian walkway) Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
07/21/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
Fire Plan Review Approved with Conditions 07/25/2025 07/22/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
07/22/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
07/22/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Approved with Conditions 02/14/2025 05/01/2025
Joe Frogge
Final Development Plan
Resolved
03/13/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
02/07/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $51,001.50 2/11/2025 - Acknowledged in letter.
Project cost
Resolved
05/01/2025

The project cost, which is used to establish the permit fee, seems high. You can remove the site costs from this number to save in permit fees. Action required: Comment is informational. Also, we need a cost breakdown between MOB work, Hospital work, and Pedestrian walkway. 2/11/2025 - Acknowledged in letter.
Misc
Corrective Action Required
02/07/2025

Inadequate information as concerns fire rated assemblies to complete review. Provide the following: - Provide complete UL details for fire rated assemblies. Must, at a minimum, include nail/screw patterns. 2/11/2025 - Deferred per request. - -
IBC 1803.1 General - geotech
Resolved
02/11/2025

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (3,000psf shown on sheet S011)
Misc
Corrective Action Required
02/07/2025

Plans submitted are for multiple projects. After review is complete and approved we will create the other permits. (MOB vs. Hospital vs. Pedestrian walkway) Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
02/07/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 2/11/2025 - Acknowledged in letter.
IMC 306.5 Equipment on roofs
Resolved
02/11/2025

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide side rail extender at roof hatch shown on 3/AE533.
IBC 716.2 Fire and Smoke Protection - fire door assemblies
Resolved
02/11/2025

2018 IBC 716.2.2 Performance requirements. Fire door assemblies shall be installed in the assemblies specified in Table 716.1(2) and shall comply with the fire protection rating specified. Action required: Amend door schedule to show that doors 3-2039B & 3-2121 are rated for 45 minutes.
IBC 603.1 Type of Construction - Allowable Materials
Resolved
02/11/2025

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Amend designs to show that top plate nailers at exterior walls/parapets are fire retardant treated.
IPC 708.1 Cleanouts required
Resolved
02/11/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where SS leaves building.
IMC 506.3.13.3 Grease fan termination location
Resolved
02/11/2025

2018 IMC 506.3.13.3 Termination location. Exhaust outlets shall be located not less than 10 feet horizontally from parts of the same or contiguous buildings, adjacent buildings and adjacent property lines and shall be located not less than 10 feet above the adjoining grade level. Exhaust outlets shall be located not less than 10 feet horizontally from or not less than 3 feet above air intake openings into any buildings. (see code for exception) Action required: Relocated kitchen hood exhaust fans to comply. (too close to parapet)
IBC 1008.3 Emergency power for illumination - at exit discharge
Resolved
02/11/2025

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency illumination at exterior landings at exit doors and in stair wells.
IBC 1704.2 Special Inspections
Resolved
04/15/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Special Inspections Review Approved 04/15/2025
Joe Frogge
Final Development Plan Review Approved 02/18/2025 02/19/2025
Daniel Fernandez
Fire Plan Review Approved 02/14/2025 02/13/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
02/07/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
02/07/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Miscellaneous Correction
Resolved
02/13/2025

1008.1 Means of egress illumination. Illumination shall be provided in the means of egress in accordance with Section 1008.2. Under emergency power, means of egress illumination shall comply with Section 1008.3. Action required: Provide emergency illumination at exterior landings at exit doors and in stair wells.
Health Department Review Approved 01/08/2025
Joe Frogge
Fire Plan Review Rejected 12/30/2024 12/30/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
12/30/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/30/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Miscellaneous Correction
Corrective Action Required
12/30/2024

1008.1 Means of egress illumination. Illumination shall be provided in the means of egress in accordance with Section 1008.2. Under emergency power, means of egress illumination shall comply with Section 1008.3. Action required: Provide emergency illumination at exterior landings at exit doors and in stair wells.
Building Plan Review Rejected 12/30/2024 12/27/2024
Joe Frogge
Final Development Plan
Corrective Action Required
12/27/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
12/27/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $51,001.50
Project cost
Corrective Action Required
12/27/2024

The project cost, which is used to establish the permit fee, seems high. You can remove the site costs from this number to save in permit fees. Action required: Comment is informational. Also, we need a cost breakdown between MOB work, Hospital work, and Pedestrian walkway.
Misc
Corrective Action Required
12/27/2024

Inadequate information as concerns fire rated assemblies to complete review. Provide the following: - Provide complete UL details for fire rated assemblies. Must, at a minimum, include nail/screw patterns. - Pipe material schedule. - Complete light pole base detail.
IBC 1803.1 General - geotech
Corrective Action Required
12/27/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (3,000psf shown on sheet S011)
Misc
Corrective Action Required
12/27/2024

Plans submitted are for multiple projects. After review is complete and approved we will create the other permits. (MOB vs. Hospital vs. Pedestrian walkway) Action required: Comment is informational.
Health Dept Review
Resolved
01/08/2025

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
12/27/2024

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IMC 306.5 Equipment on roofs
Corrective Action Required
12/27/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide side rail extender at roof hatch shown on 3/AE533.
IBC 716.2 Fire and Smoke Protection - fire door assemblies
Corrective Action Required
12/27/2024

2018 IBC 716.2.2 Performance requirements. Fire door assemblies shall be installed in the assemblies specified in Table 716.1(2) and shall comply with the fire protection rating specified. Action required: Amend door schedule to show that doors 3-2039B & 3-2121 are rated for 45 minutes.
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
12/27/2024

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Amend designs to show that top plate nailers at exterior walls/parapets are fire retardant treated.
IPC 708.1 Cleanouts required
Corrective Action Required
12/30/2024

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where SS leaves building.
IMC 506.3.13.3 Grease fan termination location
Corrective Action Required
12/30/2024

2018 IMC 506.3.13.3 Termination location. Exhaust outlets shall be located not less than 10 feet horizontally from parts of the same or contiguous buildings, adjacent buildings and adjacent property lines and shall be located not less than 10 feet above the adjoining grade level. Exhaust outlets shall be located not less than 10 feet horizontally from or not less than 3 feet above air intake openings into any buildings. (see code for exception) Action required: Relocated kitchen hood exhaust fans to comply. (too close to parapet)
IBC 1008.3 Emergency power for illumination - at exit discharge
Corrective Action Required
12/30/2024

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency illumination at exterior landings at exit doors and in stair wells.
Licensed Contractors Rejected 12/30/2024 12/27/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
12/27/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
LC - MEP Subs
Corrective Action Required
12/27/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
Alarm Plan Review Pending 03/24/2026
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Addition to Commercial $100,786.11 $100,786.11 Paid 08/06/2025
Commercial Excise Tax Fee $51,001.50 $51,001.50 Paid 08/06/2025
Right of Way Permit Fee $85.00 $85.00 Paid 08/06/2025
Storm Sewer Inspection Fee $1,367.25 $1,367.25 Paid 08/06/2025
Paved Surface Inspection Fee $30,021.96 $30,021.96 Paid 08/06/2025
Site Grading Fee $8,557.14 $8,557.14 Paid 08/06/2025
Parks Impact Fee Non-Residential - Zone 2 $4,080.80 $4,080.80 Paid 08/06/2025
Water Meter Fee $1,113.00 $1,113.00 Paid 02/18/2026
Water Tap Fee $10,880.00 $10,880.00 Paid 02/18/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Hood/Duct Inspection Pending
Alternate Protection Systems Inspection Pending
Water Service Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
Above Ceiling Inspection Pending
Rated Assembly Inspection Pending
Suspended Slab Inspection Pending
Misc
Corrective Action Required
10/31/2025
Provide 3rd party inspection report.
Piers/Caissons Inspection - Commercial Pending
Misc
Informational
11/19/2025
The following approved -2 light pole bases center of parking lot -light pole base starting at entrance of new parking lot clockwise 1-9(all) -1 light pole pier at east base of pedestrian bridge
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Alarm Test Pending
Underslab Electrical Inspection - Commercial Pending
Misc
Informational
02/12/2026
The following areas inspected 2-2011 boardroom 2-2001 reception 2-2010 conference 2-2002 CEO Office 1-1301 servery
Foundation Inspection - Commercial Pending
Footing Inspection - Commercial Pending
Misc
Informational
02/13/2026
-footings for phase 1 (parkings lot retaining wall and pedistrian Bridge) passed -footing & pads for Dietary Expansion S121 Passed
Site Visit Pending
Misc
Corrective Action Required
02/23/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system. 1/22/26 Tyler S. More irrigation work and grading. 1/28/26 Tyler S. No work due to weather and snow. 2/4/26 PS Made site visit, no work on site within parking lot addition/bridge vicinity 2/9/26 Tyler S. No work being done on the parking lot and area around. 2/12/26 Tyler S. Skid steer tucking curb and grading 2/23/26 Tyler S No work for FEI. Some work being done on bridge.
Underground Plumbing Inspection - Commercial Pending
Misc
Informational
02/27/2026
Following areas inspected Grease interceptor 70’ from grease interceptor 2/25/26-Connection of grease interceptor discharge to site sewer Remaining line from site sewer to building
Underground Electrical Inspection - Commercial Pending
Misc
Informational
03/10/2026
Following areas inspected 6 1” 2 2” -Conduit at East abutment for pedestrian bridge, continuing across parking lot, continuing under sidewalk to construction fencing -conduit from CUP to parking lot under ground and sidewalk -conduit continuing on an additional 20 feet heading south in parking lot , conduit continuing to storm drain in parking lot -conduit from E to W connecting
Underslab Plumbing Inspection - Commercial Pending
Misc
Informational
03/12/2026
The following areas inspected -hallway 2022 -toilet 2018/2019 -BR 2015 -plumbing in existing dietary -plumbing in new addition -lab
In-wall Inspection Pending
Misc
Informational
03/13/2026
Following areas inspected -admin area
Underground Electrical Inspection - Commercial Partial 10/3/2025 10/3/2025 10/03/2025
Misc
Informational
10/03/2025
Underground conduit for light poles, and emergency phones east side of parking lot to West side, excluding West side 5 to 6 poles to be determined placement
Underground Electrical Inspection - Commercial Partial 10/6/2025 10/6/2025 10/06/2025
Misc
Informational
10/03/2025
-Underground conduit for light poles, and emergency phones east side of parking lot to West side, excluding West side 5 to 6 poles to be determined placement -under ground conduit on N side of lot continuing to W entrance
Underground Electrical Inspection - Commercial Partial 10/9/2025 10/9/2025 10/09/2025
Misc
Informational
10/06/2025
-Underground conduit for light poles, and emergency phones east side of parking lot to West side, excluding West side 5 to 6 poles to be determined placement -under ground conduit on N side of lot continuing to W entrance -all remaining conduit W side of parking lot.
Footing Inspection - Commercial Partial 10/14/2025 10/14/2025 10/14/2025
Misc
Informational
10/14/2025
Retaining wall footing on NE side of parking lot okay to pour
Footing Inspection - Commercial Partial 10/15/2025 10/15/2025 10/15/2025
Misc
Informational
10/14/2025
Following areas inspected -Retaining wall footing on NE side of parking lot
Footing Inspection - Commercial Partial 10/20/2025 10/20/2025 10/20/2025
Misc
Informational
10/15/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge (upload RFI as discussed on site)
Footing Inspection - Commercial Failed 10/21/2025 10/21/2025 10/21/2025
Misc
Informational
10/20/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge (upload RFI as discussed on site)
Misc
Corrective Action Required
10/21/2025
Inspection denied pending engineered uploads
Piers/Caissons Inspection - Commercial Partial 10/21/2025 10/21/2025 10/21/2025
Misc
Informational
10/21/2025
The following approved -2 light pole bases center of parking lot
Footing Inspection - Commercial Partial 10/21/2025 10/21/2025
Misc
Informational
10/21/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge -rebar for pedestrian bridge columns
Misc
Resolved
10/21/2025
Inspection denied pending engineered uploads
Miscellaneous Inspection Partial 10/29/2025 10/29/2025
Misc
Corrective Action Required
10/29/2025
Discussion of special inspections
Suspended Slab Inspection Partial 10/31/2025 10/31/2025 10/31/2025
Misc
Corrective Action Required
10/31/2025
Provide 3rd party inspection report.
Footing Inspection - Commercial Partial 10/31/2025 10/31/2025 10/31/2025
Misc
Informational
10/21/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge -rebar for pedestrian bridge columns Provide 3rd party inspection report for “top footings”
Footing Inspection - Commercial Partial 11/4/2025 11/4/2025 11/04/2025
Misc
Informational
10/31/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge -rebar for pedestrian bridge columns -W most footing for pedestrian bridge at new parking lot Provide 3rd party inspection report for “top footings”
Pavement-Proof Roll Passed 11/5/2025 11/5/2025 11/05/2025
Misc
Corrective Action Required
11/05/2025
11/5/25 Tyler S. Proof roll was done on parking lot. No soft or spongy spot. Pass.
Piers/Caissons Inspection - Commercial Partial 11/5/2025 11/5/2025 11/05/2025
Misc
Informational
10/21/2025
The following approved -2 light pole bases center of parking lot -light pole base starting at entrance clockwise 3,4,5,7
Footing Inspection - Commercial Partial 11/5/2025 11/5/2025 11/05/2025
Misc
Corrective Action Required
11/05/2025
Stem wall at pedestrian bridge, new parking lot side
Piers/Caissons Inspection - Commercial Partial 11/6/2025 11/6/2025 11/06/2025
Misc
Informational
11/05/2025
The following approved -2 light pole bases center of parking lot -light pole base starting at entrance of new parking lot clockwise 1-9(all)
Pavement-Surface Partial 11/10/2025 11/10/2025 11/10/2025
Misc
Corrective Action Required
11/10/2025
11/10/25 Tyler S. Pavement base was laid Saturday 11/8/25. Still need to lay the pavement cap. Plan is to do that sometime this week.
Footing Inspection - Commercial Partial 11/12/2025 11/12/2025 11/12/2025
Misc
Corrective Action Required
11/05/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge -rebar for pedestrian bridge columns -W most footing for pedestrian bridge at new parking lot Provide 3rd party inspection report for “top footings” -Stem wall at pedestrian bridge, new parking lot side -stem walls at pedestrian bridge abutments E side. Upload inspect report for E abutment footing. Before any further inspections
Pavement-Surface Passed 11/13/2025 11/13/2025 11/13/2025
Misc
Corrective Action Required
11/10/2025
11/10/25 Tyler S. Pavement base was laid Saturday 11/8/25. Still need to lay the pavement cap. Plan is to do that sometime this week. 11/13/25 Tyler S. Asphalt cap has been done. Parking lot is paved.
Curb - Proof Roll Partial 10/28/2025 10/28/2025 11/17/2025
Misc
Corrective Action Required
10/28/2025
10/28/25 Tyler S. Curb was poured before proof roll inspection was done. Proof roll failed in a couple spots on the south east side or parking lot. Curb will need to be removed and before pouring curb a pre pour inspection will need to be done. 11/17/25 Tyler S. Curb in failed spots has been removed. and is starting to be prepped. Will do the pre pour inspection on Wednesday this week.
Site Visit Partial 11/17/2025 11/17/2025 11/17/2025
Misc
Corrective Action Required
11/17/2025
11/17/25 Tyler S. working on underground electrical at the bridge.
Underground Electrical Inspection - Commercial Partial 11/17/2025 11/17/2025 11/17/2025
Misc
Resolved
11/17/2025
-Underground conduit for light poles, and emergency phones east side of parking lot to West side, excluding West side 5 to 6 poles to be determined placement -under ground conduit on N side of lot continuing to W entrance -all remaining conduit W side of parking lot.
Misc
Informational
11/17/2025
Conduit at East abutment for pedestrian bridge
Site Visit Partial 11/18/2025 11/18/2025 11/18/2025
Misc
Corrective Action Required
11/17/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots.
Curb - Proof Roll Partial 11/19/2025 11/19/2025
Misc
Corrective Action Required
10/28/2025
10/28/25 Tyler S. Curb was poured before proof roll inspection was done. Proof roll failed in a couple spots on the south east side or parking lot. Curb will need to be removed and before pouring curb a pre pour inspection will need to be done. 11-19-25 NS Site visited for the curb inspection. Spots are 5 feet or less which a truck can not proof roll but has clean compacted gravel.
Footing Inspection - Commercial Partial 11/19/2025 11/19/2025
Misc
Corrective Action Required
11/12/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge -rebar for pedestrian bridge columns -W most footing for pedestrian bridge at new parking lot Provide 3rd party inspection report for “top footings” -Stem wall at pedestrian bridge, new parking lot side -stem walls at pedestrian bridge abutments E side. -turn down slab at both east&west bases of predestrian bridge Upload inspect report for E abutment footing. Before any further inspections
Piers/Caissons Inspection - Commercial Partial 11/19/2025 11/19/2025
Misc
Informational
11/06/2025
The following approved -2 light pole bases center of parking lot -light pole base starting at entrance of new parking lot clockwise 1-9(all) -1 light pole pier at east base of pedestrian bridge
Curb - Proof Roll Passed 11/19/2025 11/19/2025
Misc
Corrective Action Required
11/19/2025
10/28/25 Tyler S. Curb was poured before proof roll inspection was done. Proof roll failed in a couple spots on the south east side or parking lot. Curb will need to be removed and before pouring curb a pre pour inspection will need to be done. 11-19-25 NS Site visited for the curb inspection. Spots are 5 feet or less which a truck can not proof roll but has clean compacted gravel.
Site Visit Partial 11/20/2025 11/20/2025 11/20/2025
Misc
Corrective Action Required
11/18/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done.
Footing Inspection - Commercial Partial 11/21/2025 11/21/2025
Misc
Resolved
11/21/2025
Following areas inspected -Retaining wall footing on NE side of parking lot -4 footing pads for pedestrian bridge -rebar for pedestrian bridge columns -W most footing for pedestrian bridge at new parking lot Provide 3rd party inspection report for “top footings” -Stem wall at pedestrian bridge, new parking lot side -stem walls at pedestrian bridge abutments E side. -turn down slab at both east&west bases of predestrian bridge Upload inspect report for E abutment footing. Before any further inspections
Misc
Informational
11/21/2025
footings for phase 1 (parkings lot retaining wall and pedistrian Bridge) passed
Erosion Control Inspection Passed 11/21/2025 11/21/2025 11/21/2025
Misc
Corrective Action Required
11/21/2025
11/21/25 Tyler S. Erosion control is all in compliance with city standards. Pass.
Sidewalk Inspection Passed 11/26/2025 11/26/2025 11/26/2025
Misc
Informational
11/19/2025
11-19-25 NS Site visited for a sidewalk inspection. on the north side and east side of the remote parking spot sidewalk passed its pre-pour inspection. 11/24/25 Tyler S. Sidewalk for some of the bridge and at each end of the bridge is formed and compacted. Approve to pour.
Sidewalk Inspection Passed 11/19/2025 11/19/2025 11/26/2025
Misc
Informational
11/19/2025
11-19-25 NS Site visited for a sidewalk inspection. on the north side and east side of the remote parking spot sidewalk passed its pre-pour inspection. 11/26/25 Tyler S. Sidewalk slopes are in compliance with city and ADA specs. Pass.
Site Visit Partial 12/1/2025 12/1/2025 12/01/2025
Misc
Corrective Action Required
11/20/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow.
Site Visit Partial 12/4/2025 12/4/2025 12/04/2025
Misc
Corrective Action Required
12/01/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions.
Sidewalk Inspection Partial 12/10/2025 12/10/2025 12/09/2025
Misc
Corrective Action Required
12/09/2025
12/8/25 Tyler S. Sidewalk section at the approach of the bridge on each side and portion along the northwest of the west side of the bridge in in compliance with ADA and city standards. Sidewalk still needs to have the red rumble strip add.
Site Visit Partial 12/15/2025 12/15/2025 12/15/2025
Misc
Corrective Action Required
12/04/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday.
Erosion Control Inspection Failed 12/17/2025 12/17/2025 12/17/2025
Misc
Corrective Action Required
12/17/2025
12/17/15 Tyler S. Mud has been tracked through the parking lot and out into the road on SE Cumberland Dr. Please clean up as soon as possible.
Site Visit Partial 12/19/2025 12/19/2025 12/19/2025
Misc
Corrective Action Required
12/15/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done.
Driveway Inspection Passed 12/22/2025 12/22/2025 12/22/2025
Misc
Corrective Action Required
12/22/2025
12/22/25 Tyler S. Driveway approach is compacted. Slopes are in compliance with ADA and city standards. Approve to pour.
Sidewalk Inspection Passed 12/22/2025 12/22/2025 12/22/2025
Misc
Corrective Action Required
12/09/2025
12/8/25 Tyler S. Sidewalk section at the approach of the bridge on each side and portion along the northwest of the west side of the bridge in in compliance with ADA and city standards. Sidewalk still needs to have the red rumble strip add. 12/22/25 Tyler S. Sidewalk is compacted and slopes are in compliance. Approve to pour.
Site Visit Partial 12/29/2025 12/29/2025 12/29/2025
Misc
Corrective Action Required
12/19/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles.
Site Visit Partial 12/30/2025 12/30/2025 12/30/2025
Misc
Corrective Action Required
12/29/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge.
Site Visit Partial 1/5/2026 1/5/2026 01/05/2026
Misc
Corrective Action Required
12/30/2025
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge.
Site Visit Partial 1/8/2026 1/8/2026 01/08/2026
Misc
Corrective Action Required
01/05/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain.
Site Visit Partial 1/12/2026 1/12/2026 01/12/2026
Misc
Corrective Action Required
01/08/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together.
Site Visit Partial 1/21/2026 1/21/2026 01/21/2026
Misc
Corrective Action Required
01/12/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system.
Site Visit Partial 1/22/2026 1/22/2026 01/22/2026
Misc
Corrective Action Required
01/21/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system. 1/22/26 Tyler S. More irrigation work and grading.
Site Visit Partial 1/28/2026 1/28/2026 01/28/2026
Misc
Corrective Action Required
01/22/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system. 1/22/26 Tyler S. More irrigation work and grading. 1/28/26 Tyler S. Nor work due to weather and snow.
Site Visit Partial 2/4/2026 2/4/2026 02/04/2026
Misc
Corrective Action Required
01/28/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system. 1/22/26 Tyler S. More irrigation work and grading. 1/28/26 Tyler S. Nor work due to weather and snow. 2/4/26 PS Made site visit, no work on site within parking lot addition/bridge vicinity
Underslab Plumbing Inspection - Commercial Partial 2/5/2026 2/5/2026 02/05/2026
Misc
Informational
02/05/2026
The following areas inspected -hallway 2022 -toilet 2018/2019 -BR 2015
Site Visit Partial 2/9/2026 2/9/2026 02/09/2026
Misc
Corrective Action Required
02/04/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system. 1/22/26 Tyler S. More irrigation work and grading. 1/28/26 Tyler S. No work due to weather and snow. 2/4/26 PS Made site visit, no work on site within parking lot addition/bridge vicinity 2/9/26 Tyler S. No work being done on the parking lot and area around.
Underground Electrical Inspection - Commercial Partial 2/9/2026 2/9/2026 02/09/2026
Misc
Informational
11/17/2025
Following areas inspected -Conduit at East abutment for pedestrian bridge -conduit from CUP to parking lot under ground and sidewalk
Underground Electrical Inspection - Commercial Partial 2/10/2026 2/10/2026 02/10/2026
Misc
Informational
02/09/2026
Following areas inspected 6 1” 2 2” -Conduit at East abutment for pedestrian bridge -conduit from CUP to parking lot under ground and sidewalk -conduit continuing on an additional 20 feet heading south in parking lot
Erosion Control Inspection Failed 2/11/2026 2/11/2026 02/11/2026
Misc
Corrective Action Required
12/17/2025
12/17/15 Tyler S. Mud has been tracked through the parking lot and out into the road on SE Cumberland Dr. Please clean up as soon as possible. 2/11/26 Tyler S. Failed erosion control. There has been big pieces of curb and concrete chunks and dirt and metal dumped in the parking lot that is north of the new parking lot that needs to be cleaned up. Also, there has been concrete trucks washing out quit a bit of concrete strait into the ground that needed to be cleaned up too. Trucks need to wash out in concrete wash out. There is no erosion control set up. I have spoke to Don with Nabholz and also spoke with J. E. Dunn and both know about this issue. If this is not taken care of quickly then a 2 day STOP WORK order could be issued.
Underslab Electrical Inspection - Commercial Partial 2/12/2026 02/12/2026
Misc
Informational
02/12/2026
The following areas inspected 2-2011 boardroom 2-2001 reception 2-2010 conference 2-2002 CEO Office 1-1301 servery
Site Visit Partial 2/12/2026 2/12/2026 02/12/2026
Misc
Corrective Action Required
02/09/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system. 1/22/26 Tyler S. More irrigation work and grading. 1/28/26 Tyler S. No work due to weather and snow. 2/4/26 PS Made site visit, no work on site within parking lot addition/bridge vicinity 2/9/26 Tyler S. No work being done on the parking lot and area around. 2/12/26 Tyler S. Skid steer tucking curb and grading
Erosion Control Inspection Failed 2/13/2026 2/13/2026 02/13/2026
Misc
Corrective Action Required
02/11/2026
12/17/15 Tyler S. Mud has been tracked through the parking lot and out into the road on SE Cumberland Dr. Please clean up as soon as possible. 2/11/26 Tyler S. Failed erosion control. There has been big pieces of curb and concrete chunks and dirt and metal dumped in the parking lot that is north of the new parking lot that needs to be cleaned up. Also, there has been concrete trucks washing out quit a bit of concrete strait into the ground that needed to be cleaned up too. Trucks need to wash out in concrete wash out. There is no erosion control set up. I have spoke to Don with Nabholz and also spoke with J. E. Dunn and both know about this issue. If this is not taken care of quickly then a 2 day STOP WORK order could be issued. 2/13/26 Tyler S. Concrete and metal and debris have been dumped in parking lot at shenandoah and cumberland, just north of the new parking lot. 2 day stop work order is issued. will have 2 day to get this cleaned up or a failed STOP WORK order will be issued.
Underground Electrical Inspection - Commercial Partial 2/13/2026 2/13/2026 02/13/2026
Misc
Informational
02/10/2026
Following areas inspected 6 1” 2 2” -Conduit at East abutment for pedestrian bridge, continuing across parking lot. -conduit from CUP to parking lot under ground and sidewalk -conduit continuing on an additional 20 feet heading south in parking lot
Footing Inspection - Commercial Partial 2/13/2026 2/13/2026 02/13/2026
Misc
Informational
02/13/2026
-footings for phase 1 (parkings lot retaining wall and pedistrian Bridge) passed -footing for Dietary Expansion S121 Passed
Underslab Plumbing Inspection - Commercial Partial 2/17/2026 2/17/2026 02/17/2026
Misc
Informational
02/05/2026
The following areas inspected -hallway 2022 -toilet 2018/2019 -BR 2015 -plumbing in existing dietary
Erosion Control Inspection Passed 2/17/2026 2/17/2026 02/17/2026
Misc
Corrective Action Required
02/13/2026
12/17/15 Tyler S. Mud has been tracked through the parking lot and out into the road on SE Cumberland Dr. Please clean up as soon as possible. 2/11/26 Tyler S. Failed erosion control. There has been big pieces of curb and concrete chunks and dirt and metal dumped in the parking lot that is north of the new parking lot that needs to be cleaned up. Also, there has been concrete trucks washing out quit a bit of concrete strait into the ground that needed to be cleaned up too. Trucks need to wash out in concrete wash out. There is no erosion control set up. I have spoke to Don with Nabholz and also spoke with J. E. Dunn and both know about this issue. If this is not taken care of quickly then a 2 day STOP WORK order could be issued. 2/13/26 Tyler S. Concrete and metal and debris have been dumped in parking lot at shenandoah and cumberland, just north of the new parking lot. 2 day stop work order is issued. will have 2 day to get this cleaned up or a failed STOP WORK order will be issued. 2/17/26 Tyler S. Erosion control in compliance.
Underground Electrical Inspection - Commercial Partial 2/18/2026 2/18/2026 02/18/2026
Misc
Informational
02/13/2026
Following areas inspected 6 1” 2 2” -Conduit at East abutment for pedestrian bridge, continuing across parking lot, continuing under sidewalk to construction fencing -conduit from CUP to parking lot under ground and sidewalk -conduit continuing on an additional 20 feet heading south in parking lot
Underground Electrical Inspection - Commercial Partial 2/20/2026 2/20/2026 02/20/2026
Misc
Informational
02/18/2026
Following areas inspected 6 1” 2 2” -Conduit at East abutment for pedestrian bridge, continuing across parking lot, continuing under sidewalk to construction fencing -conduit from CUP to parking lot under ground and sidewalk -conduit continuing on an additional 20 feet heading south in parking lot , conduit continuing to storm drain in parking lot
Underground Plumbing Inspection - Commercial Partial 2/23/2026 2/23/2026 02/23/2026
Misc
Informational
02/20/2026
Following areas inspected Grease interceptor 70’ from grease interceptor
Site Visit Partial 2/23/2026 2/23/2026 02/23/2026
Misc
Corrective Action Required
02/12/2026
11/17/25 Tyler S. working on underground electrical at the bridge. 11/18/25 Tyler S. Installing french drain. Setting storm box. Working on walking bridge to connect parking lots. 11/20/25 Tyler S. Poured curb and sidewalk yesterday. Pre pour inspection was done. 12/01/25 Tyler S. No work due to snow. 12/04/25 Tyler S. Still no work due to weather conditions. 12/15/25 Tyler S. Working on the steel for the bridge connecting parking lots. Going to try and pour th approach for the parking lot on thursday or friday. 12/19/25 Tyler S. Poured more concrete for the bridge. No work being done. 12/29/25 Tyler S. Working on the bridge to connect parking lot together. Also, working on installing light poles. 12/30/25 Tyler S. Continue work on the bridge. 1/5/26 Tyler S. Some work on the bridge. 1/8/26 Tyler S. No work due to rain. 1/12/26 Tyler S. Pouring concrete on the bridge walkway connecting the two parking lots together. 1/21/26 Tyler S. Installing irrigation system. 1/22/26 Tyler S. More irrigation work and grading. 1/28/26 Tyler S. No work due to weather and snow. 2/4/26 PS Made site visit, no work on site within parking lot addition/bridge vicinity 2/9/26 Tyler S. No work being done on the parking lot and area around. 2/12/26 Tyler S. Skid steer tucking curb and grading 2/23/26 Tyler S No work for FEI. Some work being done on bridge.
Underground Plumbing Inspection - Commercial Partial 2/25/2026 2/25/2026 02/25/2026
Misc
Informational
02/23/2026
Following areas inspected Grease interceptor 70’ from grease interceptor 2/25/26-Connection of grease interceptor discharge to site sewer
Underground Plumbing Inspection - Commercial Partial 2/27/2026 2/27/2026 02/27/2026
Misc
Informational
02/25/2026
Following areas inspected Grease interceptor 70’ from grease interceptor 2/25/26-Connection of grease interceptor discharge to site sewer Remaining line from site sewer to building
Underslab Plumbing Inspection - Commercial Partial 3/4/2026 3/4/2026 03/04/2026
Misc
Informational
02/17/2026
The following areas inspected -hallway 2022 -toilet 2018/2019 -BR 2015 -plumbing in existing dietary -plumbing in new addition
Underground Electrical Inspection - Commercial Partial 3/10/2026 3/10/2026 03/10/2026
Misc
Informational
02/20/2026
Following areas inspected 6 1” 2 2” -Conduit at East abutment for pedestrian bridge, continuing across parking lot, continuing under sidewalk to construction fencing -conduit from CUP to parking lot under ground and sidewalk -conduit continuing on an additional 20 feet heading south in parking lot , conduit continuing to storm drain in parking lot -conduit from E to W connecting
Underslab Plumbing Inspection - Commercial Partial 3/12/2026 3/12/2026 03/12/2026
Misc
Informational
03/04/2026
The following areas inspected -hallway 2022 -toilet 2018/2019 -BR 2015 -plumbing in existing dietary -plumbing in new addition -lab
In-wall Inspection Partial 3/13/2026 3/13/2026 03/13/2026
Misc
Informational
03/13/2026
Following areas inspected -admin area
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home