Permit Application Status

PRCOM20246373


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20246373
Building Permit - Commercial
Voided
MIDWEST DIVISION LSH LLC
NEW TENANT FINISH
TENANT FINISH FOR NEW LOCATION OF ADMINISTRATION OFFICE **voided per architect - project moving to different address
12/12/2024
06/17/2025
02/11/2025
Locations
Contacts
NABHOLZ CONSTRUCTION CORPORATION, Address:PO BOX 2090, Phone:(501) 505-5800  
  
  
  
  
Devenney Group, Address:6900 East Camelback Road, Phone:(602) 943-8950  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Rejected 12/24/2024 12/19/2024
Joe Frogge
License Tax - Payment
Corrective Action Required
12/19/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $ 8,712.00.
Suite address
Corrective Action Required
12/19/2024

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: The address for this building is 1980 SE Blue Pkwy, Unit:???. After verifying with hospital and Fire Department, provide suite number.
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
12/19/2024

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Amend plans to show door 2-2022 swinging in direction of egress.
IPC 605.4 Water distribution pipe
Corrective Action Required
12/19/2024

2018 IPC 605.4 Water distribution pipe. Water distribution pipe and tubing shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2018 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule. (note: no plastic in plenums)
IBC 1606.2 Design dead load - structural
Corrective Action Required
12/19/2024

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new hvac equipment.
Licensed Contractors Rejected 12/24/2024 12/19/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
12/19/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
12/19/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 12/24/2024 12/18/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
12/18/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/18/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
12/12/2024 Application Form Commercial Permit Application - Admin.
12/16/2024 Plans 241205_LSMC ADMIN_100% CD_DRAWINGS
12/17/2024 Letter License Tax Bill
12/19/2024 Letter DS P/R Corrections Document
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home