PRCOM20241652
Building Permit - Commercial
Final Completion
NEW OTHER (COMMERCIAL)
TEMP ELECTRIC SERVICE
04/04/2024
04/04/2024
08/29/2024
Locations
Contacts
PROSSER WILBERT CONSTRUCTION INC, Address:13730 W 108TH ST, Phone:(913) 906-0104  
Dave Noll - Prosser Wilbert, Phone:(785) 925-2552  
THREE DIAMOND ELECTRIC LLC, Address:27606 E PINK HILL RD, Phone:(816) 228-5470  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/04/2024 04/05/2024
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $50.00 $50.00 Paid 04/04/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Failed 4/5/2024 4/5/2024 04/05/2024
Misc
Corrective Action Required
04/05/2024
-Only one grounding electrode conductor for each grounding rod clamp -Grounding rods must be fully driven down into soil -Secure on-ground raceways in place. Put rock or soil onto it -Install proper size breakers for conductor ampacity -Connect the grounding electrode conductor inside the service disconnect to the service grounded bus bar (middle bus bars) -Provide a grounded neutral feeder conductor to trailer disconnect; isolate the neutral conductors from the equipment grounding conductors; bond the enclosure -Remove the bonding screw from the neutral bus bar; connect the feeder equipment grounding conductor to the EGC bus bar where the grounding electrode conductor is connected to
Electrical Service Inspection Passed 4/11/2024 4/11/2024 04/11/2024
Misc
Resolved
04/11/2024
-Only one grounding electrode conductor for each grounding rod clamp -Grounding rods must be fully driven down into soil -Secure on-ground raceways in place. Put rock or soil onto it -Install proper size breakers for conductor ampacity -Connect the grounding electrode conductor inside the service disconnect to the service grounded bus bar (middle bus bars) -Provide a grounded neutral feeder conductor to trailer disconnect; isolate the neutral conductors from the equipment grounding conductors; bond the enclosure -Remove the bonding screw from the neutral bus bar; connect the feeder equipment grounding conductor to the EGC bus bar where the grounding electrode conductor is connected to
Final Inspection - Commercial Passed 4/5/2024 08/29/2024
Documents & Images
Date Uploaded File Type Document Name
04/04/2024 Application Form Application form
04/04/2024 Receipt Receipt for transaction:2024-002172
04/05/2024 Letter DS Building Permit
04/05/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home