Permit Application Status

PRCOM20241012


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20241012
Building Permit - Commercial
Expired
CITY OF LEES SUMMIT
CHANGE OF TENANT
LSMO TEMPORARY FIRE STATION 1 - TEMPORARY FIRE STATION WITH GARAGE STORAGE BAYS AND LIVING QUARTERS. EMERGENCY RESPONSE VEHICLES WILL BE STORED IN THE GARAGE BAYS
03/05/2024
06/04/2024
09/30/2024
Locations
Contacts
CITY OF LEES SUMMIT, Address:PO BOX 1600  
SERVPRO OF LEES SUMMIT, Address:1001 W HUNTERS RIDGE, Phone:(816) 246-5566  
JOEYWILSON@SERVPROLS.COM  
ATLAS MECHANICAL SERVICES INC, Address:26015 RA HWY, Phone:(913) 708-4695  
BID RIGHT ELECTRIC LLC, Address:1728 SE SILKWOOD CT, Phone:(816) 256-4105  
Epic Plumbing LLC, Address:17517 S Big Creek Blvd  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit A, Phone:(816) 249-2270  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/22/2024 06/04/2024
Joe Frogge
LC - MEP Subs
Resolved
06/04/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/1/24 - acknowledge in letter but list only included Atlas Mechanical which is not licensed with us. 4/19/24 - Atlas added but Bid Right and Unitad Service are not yet licensed.
Fire Plan Review Approved 04/22/2024 04/22/2024
Jim Eden
Building Plan Review Approved 04/22/2024 04/19/2024
Joe Frogge
IBC 706.1 Fire and Smoke Protection - General
Resolved
04/19/2024

2018 IBC 420.2 Separation walls. Walls separating dwelling units in the same building, walls separating sleeping units in the same building and walls separating dwelling or sleeping units from other occupancies contiguous to them in the same building shall be constructed as fire partitions in accordance with section 708. (see code for exceptions) Action required: Modify design to comply. 4/1/24 - Design modified to comply but more info required. Provide the following: - - **Penetrations in existing floor (assuming concrete) to be field verified.
IBC 2902.2 Separate facilities - fixture
Resolved
04/19/2024

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Provide code approved justification for restroom gender disparity, assignments, and lack of separate accessible water closets. If use of other than 2018 IBC regulations a Code Modification Request (CMR) process will be required. 4/1/24 - CMR received and is currently under review.
IBC 423.1 - Special Occ - Storm Shelters
Resolved
04/19/2024

2018 423.3 Critical emergency operations. In areas where the shelter design wind speed for tornados in accordance with Figure 304.2(1) of ICC 500 is 250 mph, 911 call stations, emergency operation centers and fire, rescue, ambulance and police stations shall comply with Table 1604.5 as a Risk Category IV structure and shall be provided with a storm shelter constructed in accordance with ICC 500. Action required: Provide information/report/design/similar to demonstrate compliance or justification for omission. 4/1/24 - CMR received and is currently under review.
Fire Plan Review Approved 04/02/2024 04/02/2024
Jim Eden
Construction documents - Fire protection systems
Informational
04/02/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Emergency power for illumination
Resolved
04/02/2024

2018 IFC 1008.3.1 & 3.2 Emergency power for lumination. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or mor means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. Provide emergency lighting over the outside of the egress doors. Verified at inspection.
Construction documents for fire alarm systems
Informational
04/02/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Building Plan Review Rejected 04/02/2024 04/01/2024
Joe Frogge
Code analysis required
Resolved
04/01/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Actions required: - Modify code info on G003 to show bunk areas as R2. (definition of Lodging not met - and this will make it consistent with last 2 stations) - Include basement in code analysis
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
03/26/2024

2018 IBC 420.2 Separation walls. Walls separating dwelling units in the same building, walls separating sleeping units in the same building and walls separating dwelling or sleeping units from other occupancies contiguous to them in the same building shall be constructed as fire partitions in accordance with section 708. (see code for exceptions) Action required: Modify design to comply. 4/1/24 - Design modified to comply but more info required. Provide the following: - Specify door ratings. - Specify nail/screw patterns in rated assemblies. **Penetrations in existing floor (assuming concrete) to be field verified.
IPC 403.1 Minimum number of fixtures
Resolved
04/01/2024

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Recalculate minimum fixture requirements based on residential use.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
03/26/2024

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Provide code approved justification for restroom gender disparity, assignments, and lack of separate accessible water closets. If use of other than 2018 IBC regulations a Code Modification Request (CMR) process will be required. 4/1/24 - CMR received and is currently under review.
IBC 423.1 - Special Occ - Storm Shelters
Corrective Action Required
03/26/2024

2018 423.3 Critical emergency operations. In areas where the shelter design wind speed for tornados in accordance with Figure 304.2(1) of ICC 500 is 250 mph, 911 call stations, emergency operation centers and fire, rescue, ambulance and police stations shall comply with Table 1604.5 as a Risk Category IV structure and shall be provided with a storm shelter constructed in accordance with ICC 500. Action required: Provide information/report/design/similar to demonstrate compliance or justification for omission. 4/1/24 - CMR received and is currently under review.
ICC A117.1 902.4 Dining and work surfaces
Resolved
04/01/2024

2018 IBC 1109.4 Kitchens and kitchenettes. Where kitchens and kitchenettes are provided in accessible spaces or rooms, they shall be accessible. ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify design to show kitchen island maximum 34" in height.
IBC 1209.2 Finish materials
Resolved
04/01/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Comment is informational. If paint is used in these areas it must be epoxy based. To be field verified.
Gen - Plan submittal documents
Resolved
04/01/2024

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: - All designs required to be sealed/signed, including MEP. - Remove "preliminary not for construction" stamp on MEP drawings.
Licensed Contractors Rejected 04/02/2024 04/01/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/26/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/1/24 - acknowledge in letter but list only included Atlas Mechanical which is not licensed with us.
Fire Plan Review Approved with Conditions 03/15/2024 03/20/2024
Jim Eden
Construction documents - Fire protection systems
Informational
04/02/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Emergency power for illumination
Corrective Action Required
03/20/2024

2018 IFC 1008.3.1 & 3.2 Emergency power for lumination. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or mor means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. Provide emergency lighting over the outside of the egress doors. Verified at inspection.
Construction documents for fire alarm systems
Informational
04/02/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Building Plan Review Rejected 03/15/2024 03/15/2024
Joe Frogge
Code analysis required
Corrective Action Required
03/15/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Actions required: - Modify code info on G003 to show bunk areas as R2. (definition of Lodging not met - and this will make it consistent with last 2 stations) - Include basement in code analysis
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
03/15/2024

2018 IBC 420.2 Separation walls. Walls separating dwelling units in the same building, walls separating sleeping units in the same building and walls separating dwelling or sleeping units from other occupancies contiguous to them in the same building shall be constructed as fire partitions in accordance with section 708. (see code for exceptions) Action required: Modify design to comply.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
03/15/2024

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Recalculate minimum fixture requirements based on residential use.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
03/15/2024

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Provide code approved justification for restroom gender disparity, assignments, and lack of separate accessible water closets. If use of other than 2018 IBC regulations a Code Modification Request (CMR) process will be required.
IBC 423.1 - Special Occ - Storm Shelters
Corrective Action Required
03/15/2024

2018 423.3 Critical emergency operations. In areas where the shelter design wind speed for tornados in accordance with Figure 304.2(1) of ICC 500 is 250 mph, 911 call stations, emergency operation centers and fire, rescue, ambulance and police stations shall comply with Table 1604.5 as a Risk Category IV structure and shall be provided with a storm shelter constructed in accordance with ICC 500. Action required: Provide information/report/design/similar to demonstrate compliance or justification for omission.
ICC A117.1 902.4 Dining and work surfaces
Corrective Action Required
03/15/2024

2018 IBC 1109.4 Kitchens and kitchenettes. Where kitchens and kitchenettes are provided in accessible spaces or rooms, they shall be accessible. ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Modify design to show kitchen island maximum 34" in height.
IBC 1209.2 Finish materials
Corrective Action Required
03/15/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Comment is informational. If paint is used in these areas it must be epoxy based. To be field verified.
Gen - Plan submittal documents
Corrective Action Required
03/15/2024

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Actions required: - All designs required to be sealed/signed, including MEP. - Remove "preliminary not for construction" stamp on MEP drawings.
Zoning Review Approved 03/15/2024 03/11/2024
Joe Frogge
verified in email
Licensed Contractors Rejected 03/15/2024 03/11/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/11/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $3,800.00 $3,800.00 Paid 06/04/2024
$13,530.00
Commercial Excise Tax Fee $6,765.00 $6,765.00 Paid 03/06/2024
$6,765.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Pending
Above Ceiling Inspection Pending
Rated Assembly Inspection Pending
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit