Permit Application Status

PRCOM20233861


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20233861
Building Permit - Commercial
Final Completion
ALTERATION COMMERCIAL
Permit for Evergy to restore power (Defective manufacture part, needing to replace main panel for recall / warranty issues).
08/08/2023
08/08/2023
08/17/2023
Locations
Contacts
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
kmcguire@stacoelectric.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/18/2023 08/08/2023
Andrea Sessler
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $50.00 $50.00 Paid 08/08/2023
After Hours Inspection (Building Codes)(Per Hour) $100.00 $100.00 Paid 08/14/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Passed 8/17/2023 8/17/2023 08/17/2023
Rough Electrical Inspection - Commercial Passed 08/17/2023
Final Electrical Inspection Passed 8/17/2023 08/17/2023
Documents & Images
Date Uploaded File Type Document Name
08/08/2023 Scope of Work SCOPE OF WORK
08/08/2023 Receipt Receipt for transaction:2023-006142
08/08/2023 Letter DS Building Permit
08/14/2023 Receipt Receipt for transaction:2023-006263
08/17/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home