Permit Application Status

PRCOM20233320


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20233320
Building Permit - Commercial
Certificate of Occupancy
MCPROPERTIES LLC
CHANGE OF TENANT
TENANT FINISH FOR INVESTMENT OFFICE
07/10/2023
08/21/2023
01/14/2024
09/13/2023
Locations
Contacts
MCPROPERTIES LLC, Address:221 W LEXINGTON 400  
APEX BUILDING CO, Address:604 BEL RUE, Phone:(316) 390-9723  
A & A ELECTRICAL INC, Address:705 SQUIRE CT, Phone:(816) 847-1902  
Ryan Sweat - Apex Building Company, Phone:(316) 390-9723  
CUSHMAN & WAKEFIELD, Address:777 NW BLUE PKWY - DOOR 43A, Phone:(816) 251-4106  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 08/21/2023 08/15/2023
Joe Frogge
Misc
Resolved
08/15/2023

Provide complete wall construction details.
Code analysis required
Corrective Action Required
08/15/2023

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete construction analysis. (FYI - this is a IIIB building) 8/15/23 - Change type manually.
Fire Plan Review Approved with Conditions 08/21/2023 08/15/2023
Joe Frogge
Construction documents - Fire protection systems
Corrective Action Required
08/14/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The position of the existing sprinkler head in the room and the location of the new partition MAY require location of addition of a sprinkler head and as built plans.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
08/14/2023

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The sprinkler and alarm system shall have a current annual inspection at time of occupancy inspection. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
08/14/2023

All new and existing conditions subject to inspection at occupancy. For information only.
Licensed Contractors Approved 08/21/2023 08/15/2023
Joe Frogge
LC - General Contractor
Resolved
08/15/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
08/15/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 07/20/2023 07/18/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/18/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The position of the existing sprinkler head in the room and the location of the new partition MAY require location of addition of a sprinkler head and as built plans.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
07/18/2023

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The sprinkler and alarm system shall have a current annual inspection at time of occupancy inspection. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
07/18/2023

All new and existing conditions subject to inspection at occupancy. For information only.
Building Plan Review Rejected 07/20/2023 07/12/2023
Joe Frogge
Gen - Plan submittal documents
Resolved
07/19/2023

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Designs are required to be sealed/signed by MO State design professional.
Misc
Corrective Action Required
07/12/2023

Provide complete wall construction details.
Code analysis required
Corrective Action Required
07/12/2023

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete construction analysis. (FYI - this is a IIIB building)
Licensed Contractors Rejected 07/12/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
07/12/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
07/12/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $80.02 $80.02 Paid 08/16/2023
7232302-Commercial License Tax Fee $1,427.25 $1,427.25 Paid 07/11/2023
$1,427.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 8/22/2023 08/22/2023
Above Ceiling Inspection Passed 9/12/2023 9/12/2023 09/12/2023
Occupancy Inspection - Codes Commercial Full C of O 9/13/2023 9/13/2023 09/13/2023
Documents & Images
Date Uploaded File Type Document Name
07/10/2023 Application Form APPLICATION
07/11/2023 Plans Jones #01643 plan
07/18/2023 Letter DS P/R Corrections Document
07/19/2023 Email architect waiver
08/14/2023 Plans Jones #01643 plan inc code &wal sec
08/15/2023 Approved Plans approved - Jones #01643 plan inc code &wal sec
08/15/2023 Letter License Tax Bill
08/16/2023 Receipt Receipt for transaction:2023-006368
08/21/2023 Letter DS Building Permit
08/22/2023 Letter INSPECTION SUMMARY
09/12/2023 Letter INSPECTION SUMMARY
09/13/2023 Letter Codes Final Certificate of Occupancy
09/13/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home