Permit Application Status

PRCOM20232100


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20232100
Building Permit - Commercial
Final Completion
NEW OTHER (COMMERCIAL)
CLOCK TOWER
05/09/2023
08/31/2023
11/18/2023
11/21/2023
Locations
Contacts
ARC GENERAL CONTRACTING, Address:7833 BARTON ST, Phone:(913) 492-8008  
Chris Diddle - ARC General Contracting, Phone:(913) 492-8008  
MJC ELECTRIC CO LLC, Address:4301 NW GATEWAY AVE, Phone:(816) 741-2111  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/06/2023 08/29/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
06/06/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/06/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 06/13/2023 06/19/2023
Joe Frogge
Final Development Plan
Resolved
06/19/2023

EASEMENTS. Show and label the existing private easements and public easements in the immediate vicinity. The clock tower may not be constructed within the limits of any existing public utility easement. Should the proposed location encroach into a public easement, it may be possible to vacate all or a portion of the public easement in order to accommodate the clock tower.
Gen - Plan submittal documents
Resolved
06/08/2023

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide complete designs for footing and connections. Must be sealed/signed by licensed engineer. (also, foundation plan by Verdin is incomplete)
Zoning Review Approved 06/20/2023 06/19/2023
Hector Soto Jr.
MISC
Corrective Action Required
06/19/2023

EASEMENTS. Show and label the existing private easements and public easements in the immediate vicinity. The clock tower may not be constructed within the limits of any existing public utility easement. Should the proposed location encroach into a public easement, it may be possible to vacate all or a portion of the public easement in order to accommodate the clock tower. If needed, a vacation of easement shall be applied for under separate cover for Planning Commission and City Council consideration.
Zoning Review Rejected 05/23/2023 05/19/2023
Hector Soto Jr.
MISC
Corrective Action Required
05/19/2023

EASEMENTS. Show and label the existing private easements and public easements in the immediate vicinity. The clock tower may not be constructed within the limits of any existing public utility easement. Should the proposed location encroach into a public easement, it may be possible to vacate all or a portion of the public easement in order to accommodate the clock tower. If needed, a vacation of easement shall be applied for under separate cover for Planning Commission and City Council consideration.
Building Plan Review Rejected 05/23/2023 05/17/2023
Joe Frogge
Final Development Plan
Corrective Action Required
05/17/2023

EASEMENTS. Show and label the existing private easements and public easements in the immediate vicinity. The clock tower may not be constructed within the limits of any existing public utility easement. Should the proposed location encroach into a public easement, it may be possible to vacate all or a portion of the public easement in order to accommodate the clock tower.
Gen - Plan submittal documents
Corrective Action Required
05/17/2023

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide complete designs for footing and connections. Must be sealed/signed by licensed engineer. (also, foundation plan by Verdin is incomplete)
Licensed Contractors Rejected 05/23/2023 05/17/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
05/17/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
05/17/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $292.50 $292.50 Paid 08/29/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Failed 9/8/2023 (10:30) 9/8/2023 09/08/2023
Misc
Corrective Action Required
09/08/2023
-Complete reinforcement per engineered detail -Provide Min 3” clearance to earth at all rebar -Remove all loose soil and debris from footing
Foundation Inspection - Commercial Passed 09/08/2023
Misc
Informational
09/08/2023
Footing per revised drawings on 9/7/23 -Complete rest of inspection on “Piers” inspection.
Piers/Caissons Inspection - Commercial Passed 9/8/2023 10/31/2023
Misc
Corrective Action Required
09/08/2023
Underground Electrical Inspection - Commercial Failed 11/7/2023 11/7/2023 10/31/2023
Misc
Corrective Action Required
10/31/2023
*Conduit covered without inspection. Expose all conduit for inspection -Provide minimum cover requirements per NEC 300.5
Rough Electrical Inspection - Commercial Failed 10/31/2023 10/31/2023 10/31/2023
Misc
Corrective Action Required
10/31/2023
-Provide bonding jumper to metallic junction box
Underground Electrical Inspection - Commercial Passed 11/07/2023
Misc
Resolved
11/07/2023
*Conduit covered without inspection. Expose all conduit for inspection -Provide minimum cover requirements per NEC 300.5
Rough Electrical Inspection - Commercial Passed 11/07/2023
Misc
Resolved
11/07/2023
-Provide bonding jumper to metallic junction box
Final Inspection - Commercial Passed 11/21/2023 11/21/2023 11/21/2023
Final Inspection - Commercial Passed 11/21/2023
Misc
Corrective Action Required
11/07/2023
-Complete landscaping and seating per plan
Documents & Images
Date Uploaded File Type Document Name
05/09/2023 Application Form Commercial Permit Application 5.9.23
05/09/2023 Drawing SOWP Lot 9-Sheet 01 CLOCK TOWER STAMPED 3.15.23
05/09/2023 Drawing 4MST
05/09/2023 Drawing Elec4678B
05/22/2023 Letter DS P/R Corrections Document
06/06/2023 Drawing POLEFDN for Clock Tower - Structural Stamped
06/06/2023 Drawing SOWP Lot 9-Sheet 01 CLOCK TOWER Revised 5_24_23
06/08/2023 Approved Plans approved - SOWP Lot 9-Sheet 01 CLOCK TOWER Revised 5_24_23
06/19/2023 Email Planning approval
08/29/2023 Receipt Receipt for transaction:2023-006711
08/31/2023 Letter DS Building Permit
09/08/2023 Drawing Updated Footing Detail - DOC090723-001 STAMPED
09/08/2023 Letter INSPECTION SUMMARY
09/08/2023 Letter INSPECTION SUMMARY
09/11/2023 Approved Plans approved - Updated Footing Detail - DOC090723-001 STAMPED
10/31/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/21/2023 Letter INSPECTION SUMMARY
11/21/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home