Summary
PRCOM20231334
Building Permit - Commercial
Certificate of Occupancy
GOLF PARK L P
NEW COMMERCIAL
GOLF RANCH - DRIVING RANGE BAYS
03/30/2023
05/04/2023
09/25/2023
01/16/2024
Locations
Contacts
GOLF PARK L P, Address:12122 MELROSE  
BLUE JEANS GOLF LLC, Address:3333 LEE PKWY, SUITE 460, Phone:(530) 520-0238  
MAPP, LLC, Address:344 Third Street  
THREE DIAMOND ELECTRIC LLC, Address:27606 E PINK HILL RD, Phone:(816) 228-5470  
HARRISON FRENCH AND ASSOCIATES, Address:1705 SOUTH WALSON BLVD STE 3, Phone:(479) 273-7780  
Joe Vogel - MAPP LLC, Address:3625 N Hall St. Suite 1400, Phone:(214) 213-4475  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 04/05/2023 04/24/2023
Jim Eden
Misc
Corrective Action Required
03/29/2023

Comments 1 -8 are for the main building and site. Item 9 is for the driving area. Permit approved per conditions for the driving area only.
Type I hood - Where required
Corrective Action Required
03/29/2023

2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. Action Required: Hood required in kitchen if producing grease laden vapors. Provide kitchen plans.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
03/29/2023

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. Action Required: Show class K extinguisher in kitchen. Provide ABC type extinguishers. Only class A are shown.
Installation acceptance testing
Corrective Action Required
03/29/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action Required: Call 816-969-1300 to schedule kitchen hood testing
Illumination required
Corrective Action Required
03/29/2023

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. Action Required: Show exterior illumination.
Misc
Corrective Action Required
03/29/2023

Per IFC definitions, this is not a U occupancy group. The main structure shall be classified as a B occupancy.
Miscellaneous Correction
Corrective Action Required
03/29/2023

Clarify what Existing Hardware is for the doors. All spaces shall have doors openable from the inside.
Locks on gates or barriers
Corrective Action Required
03/29/2023

2018 IFC 506.1.1-Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required- A Knox padlock shall be provided on the gate to the facility.
Portable fire extinguishers - general
Corrective Action Required
03/29/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required for the driving area- Provide ABC Type fire extinguishers along the driving area where travel distance would not exceed 75'.
Address numbers required
Corrective Action Required
03/29/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action Required: Verified at inspection
Miscellaneous Correction
Corrective Action Required
04/24/2023

Comment 1-8 apply to the main building. The canopy is released for construction per listed conditions.
Licensed Contractors Approved 04/05/2023 04/24/2023
Joe Frogge
LC - General Contractor
Resolved
04/24/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
04/24/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 04/05/2023 04/17/2023
Joe Frogge
Final Development Plan
Resolved
04/17/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Project cost
Resolved
03/30/2023

The project cost, which is used to establish the permit fee, has not been provided. Action required: Project cost breakdown between amenity building, and driving bay structure. You can remove site costs as they will be covered under the FDP and site permit.
Misc
Resolved
04/17/2023

Show panel locations on plans so we can verify main source of disconnect and grouping requirements.
Gen - Plan submittal documents
Resolved
04/17/2023

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Architectural drawings 1 thru 9 need to be updated with correct city in address and must be sealed/signed by MO state architect or engineer.
Licensed Contractors Rejected 01/25/2023 01/19/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
01/19/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
01/19/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Other $1,413.00 $1,413.00 Paid 04/11/2023
$0.00
Sanitary Sewer Insp Fees $150.00 $150.00 Paid 04/11/2023
Paved Surface Inspection Fee $6,086.72 $6,086.72 Paid 04/11/2023
Site Grading Fee $82.38 $82.38 Paid 04/11/2023
Temporary Occupancy Fee $50.00 $50.00 Paid 01/16/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 5/22/2023 05/22/2023
Misc
Informational
05/22/2023
5-22-23 NS Site visited and it appears work still has not started.
Underground Electrical Inspection - Commercial Partial 5/24/2023 5/24/2023 05/24/2023
Misc
Informational
05/24/2023
Underground electrical for golf canopy-OK
Erosion Control Inspection Partial 6/1/2023 06/01/2023
Misc
Informational
05/22/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues
Erosion Control Inspection Partial 6/9/2023 06/09/2023
Misc
Informational
06/01/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues
Erosion Control Inspection Partial 6/12/2023 06/12/2023
Misc
Informational
06/09/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues
Underground Electrical Inspection - Commercial Partial 6/22/2023 6/22/2023 06/22/2023
Misc
Informational
05/24/2023
Underground electrical OK below: -Golf canopy, UE from transformer to the MDP and other panels
Erosion Control Inspection Partial 7/17/2023 07/17/2023
Misc
Informational
06/12/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/24/2023 07/25/2023
Misc
Informational
07/17/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/31/2023 07/31/2023
Misc
Informational
07/25/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 9/1/2023 09/01/2023
Misc
Informational
07/31/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues
Electrical Service Inspection Failed 9/8/2023 9/8/2023 09/08/2023
Misc
Corrective Action Required
09/08/2023
-Bond the building metal structure to the grounding electrode or service with conductor sized per 250.102 -Install main bonding jumper sized per 250.102 connecting the service grounded conductor to the grounding electrode conductor and enclosure. 250.24 -Grounding electrode conductors shall be continuous or spliced with irreversible splice device or weld together. 250.64
Electrical Service Inspection Passed 9/11/2023 9/11/2023 09/11/2023
Misc
Resolved
09/11/2023
-Bond the building metal structure to the grounding electrode or service with conductor sized per 250.102 -Install main bonding jumper sized per 250.102 connecting the service grounded conductor to the grounding electrode conductor and enclosure. 250.24 -Grounding electrode conductors shall be continuous or spliced with irreversible splice device or weld together. 250.64
Occupancy Inspection - Engineering Temporary C of O 12/14/2023 12/14/2023 12/14/2023
Misc
Informational
12/14/2023
12-14-23 RH. Punchlist Parking lot is in place and so is sidewalks. Vegetation needs to be established but sod is on site. Sidewalk panels do have cracks which will need replaced.
Occupancy Inspection - Planning Failed 12/14/2023 12/14/2023 12/14/2023
Corrective Action Required
12/14/2023
Landscaping (sod) was on site but remains to be installed. All ground cover must be installed or the area must be seeded before a CO or TCO can be issued.
Corrective Action Required
12/14/2023
The ADA parking stall signs were not installed. ADA sings must be installed at the head of each ADA parking stall.
Corrective Action Required
12/14/2023
The accessible ADA path from the parking lot was blocked by an ADA parking stall. There were 7 ADA stalls at the time of my inspection, as the parking lot contains 135 stalls only 6 ADA stalls are required. I spoke with the GC and he stated he will stripe off the stall blocking the path to keep it clear.
Occupancy Inspection - Codes Commercial Failed 12/14/2023 12/14/2023 12/14/2023
Misc
Corrective Action Required
12/14/2023
-Provide engineer report for bay structure anchoring -Secure raceways within 3 ft of meter enclosure -Install panel cover -Label all breakers
Occupancy Inspection - Fire Passed 12/14/2023 12/14/2023 12/15/2023
Erosion Control Inspection Partial 12/18/2023 12/18/2023
Misc
Informational
09/01/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/20/2023 12/20/2023
Misc
Informational
12/18/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues
Sanitary - Material Verification Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and the sewer was already connected from the last building that was on the golf range. They just used the same one.
Sanitary Sewer Construction Inspection Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and the sewer was already connected from the last building that was on the golf range. They just used the same one.
Grading/Excavation/Fill Inspection Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and it appears grading is done.
Pavement-Proof Roll Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and it appears that the parking lot was repaved. I was not called or notified that the parking lot was going to be redone. Ryan Heckman said to pass the parking lot.
Pavement-Surface Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and it appears that the parking lot was repaved. I was not called or notified that the parking lot was going to be redone. Ryan Heckman said to pass the parking lot.
Pavement-Aggregate Base Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and it appears that the parking lot was repaved. I was not called or notified that the parking lot was going to be redone. Ryan Heckman said to pass the parking lot.
Pavement-Curb Construction Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and it appears that the parking lot was repaved. I was not called or notified that the parking lot was going to be redone. Ryan Heckman said to pass the parking lot.
Pavement-Stabilized Subgrade Passed 12/21/2023 12/21/2023
Misc
Informational
12/21/2023
12-21-23 NS Site Visited and it appears that the parking lot was repaved. I was not called or notified that the parking lot was going to be redone. Ryan Heckman said to pass the parking lot.
Erosion Control Inspection Partial 12/22/2023 12/22/2023
Misc
Informational
12/20/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/28/2023 12/28/2023
Misc
Informational
12/22/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/2/2024 01/03/2024
Misc
Informational
12/28/2023
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues
ESC - (Vegetation/Ground Cover) Passed 1/9/2024 01/09/2024
Misc
Informational
01/09/2024
1-9-24 NS Site visited and it appears that 70% has vegetation passed.
Occupancy Inspection - Engineering Passed 1/9/2024 01/09/2024
Misc
Informational
12/14/2023
12-14-23 RH. Punchlist Parking lot is in place and so is sidewalks. Vegetation needs to be established but sod is on site. Sidewalk panels do have cracks which will need replaced. 1-9-24 NS Site visited and it appears that all punch list items has be done besides the sidewalk which the contractor said he will just seal the sidewalk. Passed
Occupancy Inspection - Planning Passed 1/16/2024 1/16/2024 01/11/2024
Occupancy Inspection - Codes Commercial Ready for Temp CO 1/16/2024 1/16/2024 01/16/2024
Misc
Corrective Action Required
12/14/2023
-Provide engineer report for bay structure anchoring
Underground Electrical Inspection - Commercial Passed 01/16/2024
Misc
Informational
06/22/2023
Underground electrical OK below: -Golf canopy, UE from transformer to the MDP and other panels
Erosion Control Inspection Passed 1/9/2024 01/16/2024
Misc
Resolved
01/16/2024
5-22-23 NS Site visited and it appears work still has not started. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-3-24 NS Site Visited and no erosion control issues
Occupancy Inspection - Codes Commercial Full C of O 1/16/2024 01/16/2024
Misc
Resolved
01/16/2024
-Provide engineer report for bay structure anchoring
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home