Summary
PRCOM20230889
Building Permit - Commercial
In Plan Review
NEW SHELL BUILDING
NEW SHELL BUILDING FOR FUTURE OFFICE AND MERCANTILE **Voided per PM - no activity in over a year** **Unvoided per PM - JOE FROGGE 01/23/2025 1:13 PM**
03/02/2023
09/11/2023
Locations
Contacts
SCHARHAG ARCHITECTS, Address:6247 BROOKSIDE BLVD STE 204, Phone:(816) 656-5055  
  
  
  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Rejected 01/29/2025 02/04/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
01/29/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 3/31/23 - acknowledged in letter.
LC - MEP Subs
Corrective Action Required
01/29/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/31/23 - acknowledged in letter.
Building Plan Review Approved with Conditions 04/03/2023 02/04/2025
Joe Frogge
Engineered truss package
Corrective Action Required
01/23/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. 3/31/23 - acknowledged in letter.
Fire Plan Review Approved with Conditions 04/03/2023 01/29/2025
Mike Weisenborn
Portable fire extinguishers - general
Resolved
04/02/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of one, 2A:10B:C fire extinguisher in each white box space. Verified at inspection.
Misc
Informational
04/02/2023

Building reviewed as a white box finish only. Additional fire protection or design features may be required at tenant finish depending on occupancy type.
Building Plan Review Approved with Conditions 04/03/2023 10/30/2023
Joe Frogge
Final Development Plan
Resolved
06/15/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 3/31/23 - acknowledged in letter.
Engineered truss package
Corrective Action Required
03/27/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. 3/31/23 - acknowledged in letter.
Planning - Screening of rooftop equipment
Resolved
03/31/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Modify parapet design such that mechanical equipment will be screened from all 4 sides per referenced UDO section.
IPC 708.1 Cleanouts required
Resolved
03/31/2023

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near where sewer exits building.
Misc
Resolved
03/31/2023

Coordinate Utility Plan #10 with MEP plan P101 such that utility entrances match.
Final Development Plan Review Approved 06/16/2023 06/15/2023
Mike Weisenborn
Summit Orchard, Lot 4E-2 - SWIG and InLine
Licensed Contractors Rejected 04/03/2023 03/31/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
03/27/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 3/31/23 - acknowledged in letter.
LC - MEP Subs
Corrective Action Required
03/27/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/31/23 - acknowledged in letter.
Fire Plan Review Approved with Conditions 03/16/2023 03/15/2023
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
03/15/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of one, 2A:10B:C fire extinguisher in each white box space. Verified at inspection.
Misc
Corrective Action Required
03/15/2023

Building reviewed as a white box finish only. Additional fire protection or design features may be required at tenant finish depending on occupancy type.
Building Plan Review Rejected 03/16/2023 03/13/2023
Joe Frogge
Final Development Plan
Corrective Action Required
03/13/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Engineered truss package
Corrective Action Required
03/13/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational.
Planning - Screening of rooftop equipment
Corrective Action Required
03/13/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Modify parapet design such that mechanical equipment will be screened from all 4 sides per referenced UDO section.
IPC 708.1 Cleanouts required
Corrective Action Required
03/13/2023

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near where sewer exits building.
Misc
Corrective Action Required
03/13/2023

Coordinate Utility Plan #10 with MEP plan P101 such that utility entrances match.
Licensed Contractors Rejected 03/16/2023 03/13/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
03/13/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
03/13/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Partial 1/5/2024 1/5/2024 01/05/2024
Misc
Informational
01/05/2024
01/05/24 JMJ Contractor continued to grade site off on for past two weeks (weather & holidays).
Erosion Control Inspection Partial 1/11/2024 1/11/2024 01/11/2024
Misc
Informational
01/11/2024
01/11/24 Thursday JMJ Erosion control appears to be working.
Erosion Control Inspection Partial 1/19/2024 1/19/2024 01/19/2024
Misc
Informational
01/11/2024
01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working.
Erosion Control Inspection Partial 1/22/2024 1/22/2024 01/22/2024
Misc
Informational
01/19/2024
01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working. 01/22/24 Monday JMJ Erosion control appears to be working.
Storm Sewer Construction Inspection Partial 2/2/2024 2/2/2024 02/02/2024
Misc
Informational
02/02/2024
01/02/24 Friday JMJ ( Larry Brown Excavation ) Contractor installed approximately 120' of 15" HPDE and structure 10 & 11. 01/05/24 Monday JMJ ( Larry Brown Excavation ) Contractor continued to installed 15" HPDE from outside structure 11 towards 12. Approximately 80' of 15" HPDE shall be installed today.
Storm Sewer Construction Inspection Partial 2/6/2024 2/6/2024 02/06/2024
Misc
Informational
02/02/2024
02/02/24 Friday JMJ ( Larry Brown Excavation ) Contractor installed approximately 120' of 15" HPDE and structure 10 & 11.
Misc
Informational
02/06/2024
02/06/24 Tuesday JMJ ( Larry Brown Excavation ) Contractor has installed the storm line as-per project plans structure 12 was installed yesterday with approximately 80' of 15" HPDE pipe. Today storm structure 20 was installed & inlet storm drain were installed to grade.
Erosion Control Inspection Partial 2/8/2024 2/8/2024 02/08/2024
Misc
Informational
01/22/2024
01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working. 01/22/24 Monday JMJ Erosion control appears to be working. 02/08/24 Thursday JMJ Erosion control appears to be working.
Site Visit Partial 2/13/2024 2/13/2024 02/13/2024
Misc
Informational
02/13/2024
02/13/24 Tuesday JMJ Contractor was performing survey at site for installation of construction. No work today on site.
Erosion Control Inspection Partial 2/13/2024 2/13/2024 02/13/2024
Misc
Informational
02/08/2024
01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working. 01/22/24 Monday JMJ Erosion control appears to be working. 02/08/24 Thursday JMJ Erosion control appears to be working. 02/13/24 Tuesday JMJ Erosion control appears to be working.
Grading/Excavation/Fill Inspection Partial 2/22/2024 2/22/2024 02/22/2024
Misc
Informational
01/05/2024
01/05/24 JMJ Contractor continued to grade site off on for past two weeks (weather & holidays). 02/22/24 JMJ General grading of on site. 02/26/24 Tuesday JMJ General grading of on site.
Erosion Control Inspection Partial 2/27/2024 2/27/2024 02/27/2024
Misc
Informational
02/13/2024
01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working. 01/22/24 Monday JMJ Erosion control appears to be working. 02/08/24 Thursday JMJ Erosion control appears to be working. 02/13/24 Tuesday JMJ Erosion control appears to be working. 02/26/24 Tuesday JMJ Erosion control appears to be working.
Site Visit Partial 3/1/2024 3/1/2024 03/01/2024
Misc
Informational
02/13/2024
02/13/24 Tuesday JMJ Contractor was performing survey at site for installation of construction. No work today on site. 03/01/24 Friday JMJ No work yesterday day on site. Contractor was on site earlier in the week, but was working on indoor plumbing for Codes.
Erosion Control Inspection Partial 3/6/2024 3/6/2024 03/06/2024
Misc
Informational
02/27/2024
01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working. 01/22/24 Monday JMJ Erosion control appears to be working. 02/08/24 Thursday JMJ Erosion control appears to be working. 02/13/24 Tuesday JMJ Erosion control appears to be working. 02/26/24 Tuesday JMJ Erosion control appears to be working. 03/06/24 Wednesday JMJ Erosion control appears to be working.
Site Visit Partial 3/6/2024 3/6/2024 03/06/2024
Misc
Informational
03/01/2024
02/13/24 Tuesday JMJ Contractor was performing survey at site for installation of construction. No work today on site. 03/01/24 Friday JMJ No work yesterday day on site. Contractor was on site earlier in the week, but was working on indoor plumbing for Codes. 03/06/24 Wednesday JMJ No work yesterday day on site.
Erosion Control Inspection Partial 3/14/2024 3/14/2024 03/14/2024
Misc
Informational
03/06/2024
01/11/24 Thursday JMJ Erosion control appears to be working. 01/19/24 Friday JMJ Erosion control appears to be working. 01/22/24 Monday JMJ Erosion control appears to be working. 02/08/24 Thursday JMJ Erosion control appears to be working. 02/13/24 Tuesday JMJ Erosion control appears to be working. 02/26/24 Tuesday JMJ Erosion control appears to be working. 03/06/24 Wednesday JMJ Erosion control appears to be working. 03/14/24 Thursday JMJ Erosion control appears to be working.
Site Visit Partial 3/20/2024 3/20/2024 03/20/2024
Misc
Informational
03/06/2024
02/13/24 Tuesday JMJ Contractor was performing survey at site for installation of construction. No work today on site. 03/01/24 Friday JMJ No work yesterday day on site. Contractor was on site earlier in the week, but was working on indoor plumbing for Codes. 03/06/24 Wednesday JMJ No work yesterday day on site. 03/20/24 Wednesday JMJ Contractor saw cut construction joint for approach on the North end. Spoke with contractor about flushing the fire line.
Site Visit Partial 3/20/2024 3/20/2024 03/20/2024
Misc
Informational
03/20/2024
02/13/24 Tuesday JMJ Contractor was performing survey at site for installation of construction. No work today on site. 03/01/24 Friday JMJ No work yesterday day on site. Contractor was on site earlier in the week, but was working on indoor plumbing for Codes. 03/06/24 Wednesday JMJ No work yesterday day on site. 03/20/24 Wednesday JMJ contractor were onsite but not working on related work.
Site Visit Partial 04/08/2024
Misc
Informational
03/20/2024
02/13/24 Tuesday JMJ Contractor was performing survey at site for installation of construction. No work today on site. 03/01/24 Friday JMJ No work yesterday day on site. Contractor was on site earlier in the week, but was working on indoor plumbing for Codes. 03/06/24 Wednesday JMJ No work yesterday day on site. 03/20/24 Wednesday JMJ contractor were onsite but not working on related work. 4-8-24 RH. A Proof roll was completed on rest of curb and passed using a truck with over 20 tons on it.
Documents & Images
Date Uploaded File Type Document Name
03/02/2023 Plans Summit Ochards full set with seal 3_1_23
03/02/2023 Engineer Report/Study Summit Orchards Structural Calculations 3_1_23
03/03/2023 Application Form APPLICATION
03/15/2023 Letter DS P/R Corrections Document
03/27/2023 Letter Summit Orchards Response Letter 3_27_23
03/27/2023 Plans Summit Ochards full set with seal 3_23_23
04/04/2023 Approved Plans approved - Summit Ochards full set with seal 3_23_23
01/05/2024 Letter INSPECTION SUMMARY
01/11/2024 Letter INSPECTION SUMMARY
01/11/2024 Letter Final Plan Review Conditions
01/19/2024 Letter INSPECTION SUMMARY
01/22/2024 Letter INSPECTION SUMMARY
02/02/2024 Letter INSPECTION SUMMARY
02/05/2024 Letter INSPECTION SUMMARY
02/06/2024 Letter INSPECTION SUMMARY
02/08/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/13/2024 Letter INSPECTION SUMMARY
02/22/2024 Letter INSPECTION SUMMARY
02/27/2024 Letter INSPECTION SUMMARY
02/27/2024 Letter INSPECTION SUMMARY
03/01/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/14/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home