Permit Application Status

PRCOM20225417


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20225417
Building Permit - Commercial
Certificate of Occupancy
PEREGRINE VALLEY INVESTMENTS LLC
CHANGE OF TENANT
MENTAL HEALTH OFFICE
10/28/2022
12/06/2022
03/09/2023
Locations
Contacts
SCHARHAG ARCHITECTS, Address:6247 BROOKSIDE BLVD STE 204, Phone:(816) 656-5055  
THOLEN-WOLFE CONTRACTORS INC, Address:516 NE TOPAZ DR, Phone:(816) 215-0029  
Greg w/ Tholen Wolfe, Address:greg.gwconstruction@gmail.com, Phone:(816) 215-0029  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
SMART POWER SERVICES, Address:1151 SE CENTURY DR, Phone:(816) 366-0385  
FIVE STAR MECHANICAL CONTRACT INC, Address:P O BOX 11964, Phone:(816) 358-4444  
PEREGRINE VALLEY INVESTMENTS LLC, Address:3730 NE TROON DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 02/13/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/13/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received for existing system modification 2/13/2023.
Installation acceptance testing
Corrective Action Required
02/13/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a test.
Licensed Contractors Approved 11/09/2022 11/30/2022
Joe Frogge
LC - General Contractor
Resolved
11/30/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
11/30/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 11/09/2022 11/10/2022
Ben Hicks
Construction documents for fire alarm systems
Corrective Action Required
11/10/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Acknowledged Deferred Submittal. Submit shop drawings to Lee's Summit Fire
Construction documents - Fire protection systems
Corrective Action Required
11/10/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Acknowledged deferred submittal. Submit shop drawings to Lee's Summit Fire
Installation acceptance testing
Corrective Action Required
11/10/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action Required: Call 816-969-1300 for testing
Emergency power for illumination
Corrective Action Required
11/10/2022

2018 IFC 1008.3.1 & 3.2 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or mor means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. Action Required: If existing emergency lighting is utuilzed, not shown on submitted plans, it will be field tested priot to acceptance.
Illumination required
Corrective Action Required
11/10/2022

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. Action Required: If existing lighting is utilized. Not shown on submitted plans, field testing is required.
Building Plan Review Approved with Conditions 11/09/2022 10/28/2022
Joe Frogge
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
10/28/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: All circuits in patient care areas shall have redundant ground system. To be field verified.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $232.00 $232.00 Paid 12/01/2022
$0.00
Commercial Excise Tax Fee $4,463.25 $4,463.25 Paid 10/28/2022
$4,463.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 12/27/2022 12/27/2022 12/27/2022
Above Ceiling Inspection Passed 1/13/2023 01/13/2023
Alarm Test Passed 03/07/2023
Occupancy Inspection - Fire Passed 3/7/2023 03/07/2023
Occupancy Inspection - Codes Commercial Full C of O 3/9/2023 3/9/2023 03/09/2023
Documents & Images
Date Uploaded File Type Document Name
10/28/2022 Application Form Ellie Mental Health Permit Application rev 10.28.22
10/28/2022 Plans Ellie Mental Health with seal 10_26_22
11/10/2022 Letter Fire Building Plan Review
11/10/2022 Approved Plans approved - Ellie Mental Health with seal 10_26_22
11/30/2022 Letter License Tax Bill
12/01/2022 Receipt Receipt for transaction:2022-009204
12/06/2022 Letter DS Building Permit
12/27/2022 Letter INSPECTION SUMMARY
01/13/2023 Letter INSPECTION SUMMARY
02/13/2023 Letter Fire (Alarm) Plan Review Notice
03/09/2023 Letter Codes Final Certificate of Occupancy
03/09/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home