Permit Application Status

PRCOM20225202


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20225202
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
CHANGE OF TENANT
BODY WAXING SERVICES
10/14/2022
11/16/2022
08/08/2023
01/26/2023
Locations
Contacts
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
GRAYLING INC, Address:10258 W 87TH ST, Phone:(913) 341-5444  
METALCRAFT INC, Address:5138 MERRIAM DR., Phone:(913) 707-8824  
ROZIER ELECTRIC, Address:1608 SW JEFFERSON ST, Phone:(816) 246-9000  
DOUG COX, Address:8801 N. CENTRAL AVE, SUITE 101, Phone:(925) 437-0927  
HA PLUMBING, Address:10218 W 67TH ST, Phone:(913) 709-4333  
Adam Bertuglia, Address:10258 W. 87th St, Phone:(913) 980-0456  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/16/2022
Ben Hicks
Construction documents for fire alarm systems
Informational
12/15/2022

d plans e2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. NICET stamped plans received 12/12/2022.
Installation acceptance testing
Corrective Action Required
12/15/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required- Call (816) 969-1300 to schedule a test for before the regular business hours of adjacent tenants.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Informational
12/15/2022

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The existing system shall have a current annual inspection. Verified at time of inspection.
Sprinkler Plan Review Released for Construction 12/02/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
12/02/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Received 12/2/2022.
Installation acceptance testing
Corrective Action Required
12/02/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the occupancy inspection.
Licensed Contractors Approved 11/02/2022 11/15/2022
Joe Frogge
LC - General Contractor
Resolved
11/15/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
11/15/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 11/09/2022 11/02/2022
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
11/02/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Construction documents - Fire protection systems
Corrective Action Required
11/02/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Corrective Action Required
11/02/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Building Plan Review Approved 11/09/2022 11/02/2022
Joe Frogge
IMC 602.2.1 Materials within plenums
Resolved
11/02/2022

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC not allowed in plenum space. Either specify compliant DWV material or duct return air.
Fire Plan Review Approved with Conditions 10/26/2022 10/26/2022
Ben Hicks
Construction documents for fire alarm systems
Corrective Action Required
10/26/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Construction documents - Fire protection systems
Corrective Action Required
10/26/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Corrective Action Required
10/26/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Building Plan Review Rejected 10/26/2022 10/20/2022
Joe Frogge
IMC 602.2.1 Materials within plenums
Corrective Action Required
10/20/2022

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC not allowed in plenum space. Either specify compliant DWV material or duct return air.
Licensed Contractors Rejected 10/26/2022 10/20/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
10/20/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
10/20/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $400.00 $400.00 Paid 11/15/2022
$3,646.50
7232302-Commercial License Tax Fee $1,823.25 $1,823.25 Paid 10/18/2022
$1,823.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 12/07/2022
Misc
Corrective Action Required
12/07/2022
**Suites and restroom ok to cover -Complete dwv at breakroom -Complete electrical at hard lids- schedule as above ceiling when ready
Underslab Plumbing Inspection - Commercial Passed 12/07/2022
In-wall Inspection Passed 12/14/2022
Misc
Resolved
12/14/2022
**Suites and restroom ok to cover -Complete dwv at breakroom -Complete electrical at hard lids- schedule as above ceiling when ready
Above Ceiling Inspection Partial 12/14/2022 12/14/2022 12/14/2022
Misc
Informational
12/14/2022
-HARD LIDS AT ENTRY AND CORRIDOR OK
Above Ceiling Inspection Failed 12/21/2022 12/21/2022
Misc
Informational
12/14/2022
-HARD LIDS AT ENTRY AND CORRIDOR OK 12/21/22-NOTHING IS READY. CEILING GRID/MEP/SPRINKLER HAVE NOT BEEN INSTALLED.
Above Ceiling Inspection Failed 1/18/2023 1/18/2023 01/18/2023
Misc
Informational
12/21/2022
-HARD LIDS AT ENTRY AND CORRIDOR OK
Miscellaneous Correction
Corrective Action Required
01/18/2023
-Secure all mc per code -Support all wiring off of grid -Provide knockout covers at all openings in boxes -Land lv connecitons inside of box or fixture
Above Ceiling Inspection Passed 1/20/2023 1/20/2023 01/20/2023
Misc
Resolved
01/20/2023
-HARD LIDS AT ENTRY AND CORRIDOR OK
Miscellaneous Correction
Resolved
01/20/2023
-Secure all mc per code -Support all wiring off of grid -Provide knockout covers at all openings in boxes -Land lv connecitons inside of box or fixture
Alarm Test Passed 01/24/2023
Occupancy Inspection - Codes Commercial Failed 1/25/2023 1/25/2023 01/25/2023
Misc
Corrective Action Required
01/25/2023
-Provide box extension in suite 105 -Provide GFCI protection at receptacle in break room -Provide accessible restroom signage -Open faced toilet seat required -Move side wall grab bar to min. 54" from back wall
Occupancy Inspection - Fire Passed 1/25/2023 1/25/2023 01/25/2023
Occupancy Inspection - Codes Commercial Full C of O 1/26/2023 1/26/2023 01/26/2023
Misc
Resolved
01/26/2023
-Provide box extension in suite 105 -Provide GFCI protection at receptacle in break room -Provide accessible restroom signage -Open faced toilet seat required -Move side wall grab bar to min. 54" from back wall
Documents & Images
Date Uploaded File Type Document Name
10/14/2022 Application Form Commercial Permit Application
10/17/2022 Plans MO-042 Radiant Waxing - Permit Set 10-13-22
10/26/2022 Letter Fire Building Plan Review
10/26/2022 Letter DS P/R Corrections Document
11/01/2022 Plans MO-042 Radiant Waxing - Permit Set with Revised M-1 sheet
11/02/2022 Approved Plans APPROVED - MO-042 Radiant Waxing - Permit Set with Revised M-1 sheet
11/15/2022 Receipt Receipt for transaction:2022-008949
11/16/2022 Letter DS Building Permit
12/02/2022 Letter Fire (Sprinkler) Plan Review
12/07/2022 Letter INSPECTION SUMMARY
12/07/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter Fire Building Plan Review
12/14/2022 Letter INSPECTION SUMMARY
12/16/2022 Letter Fire (Alarm) Plan Review Notice
12/21/2022 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/24/2023 Letter Fire (Alarm) Plan Review Notice
01/24/2023 Letter Fire (Alarm) Plan Review Notice
01/25/2023 Letter INSPECTION SUMMARY
01/26/2023 Letter Fire (Alarm) Plan Review Notice
01/26/2023 Letter Field Certificate of Occupancy
01/26/2023 Letter Codes Final Certificate of Occupancy
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home