Permit Application Status

PRCOM20222344


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20222344
Building Permit - Commercial
Certificate of Occupancy
230 MAIN INVESTORS LLC
CHANGE OF TENANT
TENANT FINISH FOR OPEN CONCEPT OFFICE WITH COFFEE BAR - INCLUDES SOME CONSTRUCTION ON 2ND FLOOR
05/27/2022
01/09/2023
12/06/2022
07/18/2023
Locations
Contacts
230 MAIN INVESTORS LLC, Address:7200 W 132ND ST STE 150  
DAHMER CONTRACTING GROUP, Address:8375 NIEMAN RD, Phone:(913) 274-9982  
CHIEF HEATING & COOLING INC, Address:920 NW TECHNOLOGY DR, Phone:(816) 246-4646  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
CHAD DUMAS, Address:400 SW WATERFALL CT, Phone:(816) 517-3049  
Sewer Surgeon LLC, Address:6913 North Walnut Street  
ACE ELECTRICAL CONTRACTORS, Address:1353 NE BRANDYWINE RD, Phone:(816) 875-4761  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/09/2023 01/09/2023
Development Center
LC - General Contractor
Corrective Action Required
01/09/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 6/27/22 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
01/09/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/27/22 - acknowledged in letter
Fire Plan Review Approved 12/14/2022 12/13/2022
Ben Hicks
Licensed Contractors Rejected 12/14/2022 12/08/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
12/07/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 6/27/22 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
12/07/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/27/22 - acknowledged in letter
Building Plan Review Approved 12/14/2022 12/08/2022
Joe Frogge
Fire Plan Review Approved 06/30/2022 06/29/2022
Jim Eden
Miscellaneous Correction
Resolved
06/29/2022

Provide exterior emergency lighting over exit discharge areas on the first and second floor.
Misc
Resolved
06/29/2022

Plan review for the first floor tenant space. Complete plans not provided for the second floor.
Address numbers required
Resolved
06/29/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- Exterior tenant doors shall be marked with address and suite designation.
Portable fire extinguishers - general
Resolved
06/29/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide fire extinguishers in the tenant finish and shell building areas of the building.
Miscellaneous Correction
Resolved
06/29/2022

Provide information on door hardware for the rear door.
Building Plan Review Approved 06/30/2022 06/27/2022
Joe Frogge
IPC 916.3 Island vent installation below flood level rim
Resolved
06/27/2022

2018 IPC 916.3 Vent installation below the fixture flood level rim. The vent located below the flood level rim of the fixture being vented shall be installed as required for drainage piping in accordance with Chapter 7, except for sizing. The vent shall be sized in accordance with Section 906.2. The lowest point of the island fixture vent shall connect full size to the drainage system. The connection shall be to a vertical drain pipe or to the top half of a horizontal drain pipe. Cleanouts shall be provided in the island fixture vent to permit rodding of all vent piping located below the flood level rim of the fixtures. Rodding in both directions shall be permitted through a cleanout. Action required: Cleanouts are required near bottom of each vertical loop vent pipe. To be field verified.
Licensed Contractors Rejected 06/30/2022 06/27/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
06/23/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 6/27/22 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
06/23/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/27/22 - acknowledged in letter
Fire Plan Review Rejected 06/09/2022 06/09/2022
Jim Eden
Address numbers required
Corrective Action Required
06/09/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- Exterior tenant doors shall be marked with address and suite designation.
Misc
Corrective Action Required
06/09/2022

Plan review for the first floor tenant space. Complete plans not provided for the second floor.
Miscellaneous Correction
Corrective Action Required
06/09/2022

Provide exterior emergency lighting over exit discharge areas on the first and second floor.
Portable fire extinguishers - general
Corrective Action Required
06/09/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide fire extinguishers in the tenant finish and shell building areas of the building.
Miscellaneous Correction
Corrective Action Required
06/09/2022

Provide information on door hardware for the rear door.
Building Plan Review Approved with Conditions 06/09/2022 06/06/2022
Joe Frogge
IPC 916.3 Island vent installation below flood level rim
Corrective Action Required
06/06/2022

2018 IPC 916.3 Vent installation below the fixture flood level rim. The vent located below the flood level rim of the fixture being vented shall be installed as required for drainage piping in accordance with Chapter 7, except for sizing. The vent shall be sized in accordance with Section 906.2. The lowest point of the island fixture vent shall connect full size to the drainage system. The connection shall be to a vertical drain pipe or to the top half of a horizontal drain pipe. Cleanouts shall be provided in the island fixture vent to permit rodding of all vent piping located below the flood level rim of the fixtures. Rodding in both directions shall be permitted through a cleanout. Action required: Cleanouts are required near bottom of each vertical loop vent pipe. To be field verified.
Licensed Contractors Rejected 06/09/2022 06/03/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
06/03/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/03/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $400.00 $400.00 Paid 12/28/2022
$9,735.00
7232302-Commercial License Tax Fee $4,867.50 $4,867.50 Paid 06/02/2022
$4,867.50
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/22/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 2/14/2023 2/14/2023 02/14/2023
Above Ceiling Inspection Partial 02/14/2023
Misc
Corrective Action Required
02/14/2023
Hard lids ok
Occupancy Inspection - Codes Commercial Failed 5/30/2023 5/30/2023 05/30/2023
Misc
Corrective Action Required
05/30/2023
-Complete all corrections for LSFD -Provide address at front and rear entry -Provide electrical panel doors, labels, and schedules -Restroom signage to be on latch side of both doors -Non absorbant wall finish in restrooms must be min 48" aff -Mirrors to be max 40" to reflective surface -Install cover plates at mechanical room -Stair handrail must extend 12" past last tread
Occupancy Inspection - Fire Failed 5/30/2023 5/30/2023 05/30/2023
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/22/2023 6/22/2023 06/22/2023
Misc
Corrective Action Required
05/30/2023
-Complete all corrections for LSFD
Occupancy Inspection - Fire Temporary C of O 6/22/2023 6/22/2023 06/22/2023
Above Ceiling Inspection Passed 07/18/2023
Misc
Resolved
07/18/2023
Hard lids ok
Occupancy Inspection - Codes Commercial Full C of O 7/18/2023 7/18/2023 07/18/2023
Misc
Resolved
07/18/2023
-Complete all corrections for LSFD
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home