Permit Application Status

PRCOM20222156


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20222156
Building Permit - Commercial
Certificate of Occupancy
WHD MANAGEMENT LLC
NEW COMMERCIAL
NEW 12 BAY SELF STORAGE BUILDING
05/18/2022
05/19/2022
09/26/2022
06/12/2023
Locations
Contacts
PELLA BUILDING SYSTEMS INCORPORATED, Address:906 W 9TH ST, Phone:(641) 628-9300  
Tporter@MegaStorageUSA.com, Address:troy porter, Phone:(515) 414-1101  
FAITH TECHNOLOGIES INC, Address:P O BOX 260, Phone:(920) 225-6500  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
WHD MANAGEMENT LLC, Address:PO BOX 1059  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/21/2022 05/18/2022
Joe Frogge
LC - MEP Subs
Resolved
05/18/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/14/22 - not addressed
LC - General Contractor
Resolved
05/18/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent. 4/14/22 - not addressed
Final Development Plan Review Approved 05/06/2022 04/22/2022
Joe Frogge
Building Plan Review Approved 04/21/2022 04/19/2022
Joe Frogge
Final Development Plan
Resolved
04/19/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Gen - Design professional seals
Resolved
04/14/2022

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record. (including pre-engineered metal building drawings)
Fire Plan Review Approved with Conditions 04/21/2022 04/14/2022
Joe Frogge
Portable fire extinguishers - general
Corrective Action Required
04/14/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a minimum 2A:10B:C fire extinguisher in each of the spaces, or provide a fire extinguisher(s) on the exterior of the building that meet travel distances. Verified at inspection.
Misc
Corrective Action Required
04/14/2022

[BE] 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Verified at inspection.
Fire Plan Review Approved with Conditions 03/29/2022 03/30/2022
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
03/30/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a minimum 2A:10B:C fire extinguisher in each of the spaces, or provide a fire extinguisher(s) on the exterior of the building that meet travel distances. Verified at inspection.
Misc
Corrective Action Required
03/30/2022

[BE] 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Verified at inspection.
Building Plan Review Rejected 03/29/2022 03/17/2022
Joe Frogge
Final Development Plan
Corrective Action Required
03/16/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Gen - Design professional seals
Corrective Action Required
03/16/2022

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record. (including pre-engineered metal building drawings)
Licensed Contractors Rejected 03/29/2022 03/16/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/16/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
03/16/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $583.88 $583.88 Paid 05/18/2022
7232302-Industrial/Warehouse License Tax Fee $850.00 $850.00 Paid 05/18/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Failed 10/18/2022 10/18/2022 10/18/2022
Misc
Corrective Action Required
10/18/2022
Engineer plan shows footing with 2 #5 steel rebars. Shall have engineer to address the 2 firberglass rebars in lieu of the #5 steel rebars.
Footing Inspection - Commercial Passed 05/09/2023
Misc
Resolved
05/09/2023
Engineer plan shows footing with 2 #5 steel rebars. Shall have engineer to address the 2 firberglass rebars in lieu of the #5 steel rebars.
Rough Electrical Inspection - Commercial Passed 5/9/2023 5/9/2023 05/09/2023
Informational
05/09/2023
BUILDING POWER SUPPLY FROM MAIN ELECTRICAL SERVICE AT BLDG 3-OK
Occupancy Inspection - Codes Commercial Failed 5/26/2023 5/26/2023 05/26/2023
Misc
Corrective Action Required
05/26/2023
-Approval required from Planning and Field Service Engineering -Underground electrical to light pole piers and the light pole piers themselves were never inspected by the city. Submit letter of approval from the engineer of record -Secure MC raceways within 12” of boxes. Check buildings A-D -Support loose receptacle yoke in storage unit 96
Occupancy Inspection - Water Utilities Passed 06/07/2023
Occupancy Inspection - Codes Commercial Full C of O 06/12/2023
Misc
Resolved
06/12/2023
-Approval required from Planning and Field Service Engineering -Underground electrical to light pole piers and the light pole piers themselves were never inspected by the city. Submit letter of approval from the engineer of record -Secure MC raceways within 12” of boxes. Check buildings A-D -Support loose receptacle yoke in storage unit 96
Documents & Images
Date Uploaded File Type Document Name
05/18/2022 Letter License Tax Bill
05/18/2022 Receipt Receipt for transaction:2022-003650
10/18/2022 Engineer Report/Study Engineer letter for slab reinforcement
10/18/2022 Letter INSPECTION SUMMARY
04/19/2022 Approved Plans approved - 20231 - Mega Storage Permit Set - 03_09_2022
05/09/2023 Letter INSPECTION SUMMARY
05/09/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter Codes Final Certificate of Occupancy
06/12/2023 Letter Field Certificate of Occupancy
06/12/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home