Permit Application Status

PRCOM20222070


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20222070
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
RENOVATION OF EXISTING WELL BABY SPACE AND WAITING AREA - INCLUDES RELOCATION OF SLEEP ROOMS/BREAK ROOM AND 3 NEW ANTEPARTUM ROOMS
05/16/2022
06/13/2022
01/25/2023
Locations
Contacts
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
Ben Pratt, Address:BPratt@McCarthy.com, Phone:(314) 520-1810  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 09/30/2022 09/30/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
09/30/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received Sept. 29, 2022
Installation acceptance testing
Corrective Action Required
09/30/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the occupancy inspection.
Licensed Contractors Approved 05/16/2022 05/26/2022
Joe Frogge
LC - General Contractor
Resolved
05/26/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
Fire Plan Review Approved with Conditions 05/26/2022 05/25/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
05/25/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
05/25/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Installation acceptance testing
Corrective Action Required
05/25/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection of the sprinkler system will be completed at the occupancy inspection. Call (816) 969-1300 to schedule an alarm test.
Building Plan Review Approved with Conditions 05/26/2022 05/17/2022
Joe Frogge
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
05/17/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: All circuits in patient care areas to have redundant ground system. To be field verified.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $2,926.54 $2,926.54 Paid 06/13/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 8/29/2022 8/29/2022 08/29/2022
Misc
Corrective Action Required
08/29/2022
-PHASE 1 -131, 131d, 130-130d **130e-complete dwv
In-wall Inspection Partial 9/2/2022 09/02/2022
Misc
Corrective Action Required
08/29/2022
-PHASE 1 2ND FLOOR -131, 131d, 130-130d 9/2/22 ROOM 2A 130E DWV
Above Ceiling Inspection Partial 9/7/2022 9/7/2022 09/07/2022
Misc
Informational
09/07/2022
9/7/22 ROOM 2F064 APPROVED
Above Ceiling Inspection Partial 9/27/2022 9/27/2022 09/27/2022
Misc
Informational
09/07/2022
9/7/22 ROOM 2F064 APPROVED - 9/27/22 ROOMS 2A131, 2A131D, 24130 A THRU E -
Above Ceiling Inspection Passed 10/24/2022 10/24/2022
Misc
Informational
09/27/2022
9/7/22 ROOM 2F064 APPROVED - 9/27/22 ROOMS 2A131, 2A131D, 24130 A THRU E -
In-wall Inspection Passed 10/24/2022 10/24/2022
Misc
Corrective Action Required
09/02/2022
-PHASE 1 2ND FLOOR -131, 131d, 130-130d 9/2/22 ROOM 2A 130E DWV
Rated Assembly Inspection Passed 9/27/2022 10/24/2022
Occupancy Inspection - Codes Commercial Failed 10/24/2022 10/24/2022 10/24/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/24/2022
OK TO OCCUPY THE FOLLOWING AREA WAITING ROOM # 2A-131
Alarm Test Partial 10/24/2022 10/24/2022
Occupancy Inspection - Fire Partial 10/24/2022 10/24/2022 10/24/2022
Occupancy Inspection - Codes Commercial Failed 11/2/2022 11/2/2022 11/02/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/24/2022
OK TO OCCUPY THE FOLLOWING AREAS WAITING ROOM # 2A-131 NICU ISOLATION ROOM # 2064
Occupancy Inspection - Fire Partial 11/2/2022 11/2/2022 11/02/2022
Corrective Action Required
11/02/2022
All life safety was appropriate. Okay to occupy room 2064 with approval from codes.
In-wall Inspection Partial 11/14/2022 11/14/2022 11/14/2022
Misc
Informational
11/14/2022
THE FOLLOWING AREAS ARE APPROVED PHASE 2 ROOM # SLEEP ROOM # 2A-098B
Occupancy Inspection - Codes Commercial Failed 11/14/2022 11/14/2022 11/14/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/02/2022
OK TO OCCUPY THE FOLLOWING AREAS PHASE 1 : PARTIAL FINAL : WAITING ROOM # 2A-131 NICU ISOLATION ROOM # 2064 NURSERY ROOMS # 2A-2130 A THRU E, 2A 2131D
Above Ceiling Inspection Failed 12/13/2022 12/13/2022 12/13/2022
Misc
Corrective Action Required
12/13/2022
-Secure mc within 12" of boxes, support light fixtures at opposite corners, open j box
In-wall Inspection Partial 12/13/2022 12/13/2022 12/13/2022
Misc
Informational
11/14/2022
THE FOLLOWING AREAS ARE APPROVED PHASE 2 ROOM # SLEEP ROOM # 2A-098B PHASE 3 2A111, 2A134, 2A11B, 2A110 ****COMPLETE RATED ASSEMBLY-DO NOT COVER RATED ASSEMBLY AT CHASE IN 2A110
Above Ceiling Inspection Partial 12/14/2022 12/14/2022
Misc
Informational
12/14/2022
Phase 2 -2a098.b ok
Above Ceiling Inspection Passed 1/9/2023 01/09/2023
Misc
Resolved
01/09/2023
Phase 2 -2a098.b ok -2A
In-wall Inspection Passed 01/09/2023
Misc
Resolved
01/09/2023
THE FOLLOWING AREAS ARE APPROVED PHASE 2 ROOM # SLEEP ROOM # 2A-098B PHASE 3 2A111, 2A134, 2A11B, 2A110 ****COMPLETE RATED ASSEMBLY-DO NOT COVER RATED ASSEMBLY AT CHASE IN 2A110
Occupancy Inspection - Codes Commercial Failed 1/9/2023 1/9/2023 01/09/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/14/2022
OK TO OCCUPY THE FOLLOWING AREAS PHASE 1 : WAITING ROOM # 2A-131 NICU ISOLATION ROOM # 2064 NURSERY ROOMS # 2A-2130 A THRU E, 2A 2131D PHASE 2: SLEEP ROOM 21-098B
Alarm Test Partial 01/09/2023
Occupancy Inspection - Codes Commercial Full C of O 1/25/2023 1/25/2023 01/25/2023
THE FOLLOWING AREAS ARE APPROVED
Resolved
01/25/2023
OK TO OCCUPY THE FOLLOWING AREAS PHASE 1 : WAITING ROOM # 2A-131 NICU ISOLATION ROOM # 2064 NURSERY ROOMS # 2A-2130 A THRU E, 2A 2131D PHASE 2: SLEEP ROOM 21-098B
Documents & Images
Date Uploaded File Type Document Name
05/16/2022 Application Form Comm Permit Application - Well Baby 22-0516
05/16/2022 Plans SLE MOTHER BABY PHASE 2 22-0513
05/26/2022 Approved Plans approved - SLE MOTHER BABY PHASE 2 22-0513
06/01/2022 Letter Fire Building Plan Review
06/13/2022 Receipt Receipt for transaction: 2022-004583
06/13/2022 Letter DS Building Permit
08/29/2022 Letter INSPECTION SUMMARY
09/02/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/30/2022 SLE - MOTHER BABY SK0834 - PE STAMPED
09/30/2022 Letter Fire (Sprinkler) Plan Review
10/24/2022 Drawing SLE - MOTHER BABY SK0834 - PE STAMPED
10/24/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter Fire Loss Reduction Form
10/31/2022 Plans SLE Mother Baby Refresh Fire Alarm Drawings Stamped
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter Fire Loss Reduction Form
11/14/2022 Letter INSPECTION SUMMARY
11/14/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/25/2023 Letter Codes Final Certificate of Occupancy
01/25/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home