Permit Application Status

PRCOM20220967


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220967
Building Permit - Commercial
Final Completion
JPMORGAN CHASE BANK NATIONAL ASSOCIATION
NEW OTHER (COMMERCIAL)
NEW TEMPORARY SERVICE
03/15/2022
03/15/2022
04/12/2023
Locations
Contacts
JPMORGAN CHASE BANK NATIONAL ASSOCIATION, Address:1111 POLARIS PKWY STE 1J OH1-0241  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
DTREHEY@STACOELECTRIC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 03/29/2022 11/22/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
11/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received November 22, 2022.
Installation acceptance testing
Corrective Action Required
11/23/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule an alarm test. The test should be before regular business hours.
Misc
Corrective Action Required
11/23/2022

The room containing the fire alarm control panel shall be marked. Verified at inspection.
Licensed Contractors Approved 03/15/2022 03/15/2022
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Other $50.00 $50.00 Paid 03/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Passed 3/16/2022 3/16/2022 03/16/2022
Final Inspection - Commercial Passed 3/16/2022 3/16/2022 03/16/2022
Verify Final Inspection (Final) Complete 3/16/2022 03/16/2022
Alarm Test Passed 4/11/2023 4/11/2023 04/11/2023
Documents & Images
Date Uploaded File Type Document Name
03/15/2022 Application Form APPLICATION
03/15/2022 Receipt Receipt for transaction:2022-001416
03/15/2022 Letter DS Building Permit
03/16/2022 Letter INSPECTION SUMMARY
03/16/2022 Letter INSPECTION SUMMARY
11/23/2022 Letter Fire (Alarm) Plan Review Notice
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home