Permit Application Status

PRCOM20220895


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220895
Building Permit - Commercial
Certificate of Occupancy
NEW MULTI-FAMILY
NEW 4 UNIT TOWNHOMES **Approved plans are in PRCOM20214607
03/10/2022
04/29/2022
09/27/2023
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
nwintjen@brinkmannconstructors.com, Address:nwintjen@brinkmannconstructors.com  
ALDEN PLUMBING & MECHANICAL LLC, Address:5600 W 95TH ST STE307, Phone:(816) 666-8662  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
TRI Architects, Address:9812 Manchester rd, Phone:(314) 395-9750  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 04/29/2022
Joe Frogge
Building Plan Review Approved 04/29/2022
Joe Frogge
Licensed Contractors Approved 09/17/2021 03/10/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $5,496.86 $5,496.86 Paid 04/19/2022
8331507-Sewer Connection Fee $1,320.00 $1,320.00 Paid 04/19/2022
7232302-Residential License Tax Fee $2,437.12 $2,437.12 Paid 04/19/2022
8331401-Water Tap Fee $14,620.00 $14,620.00 Paid 04/19/2022
8350015-Water Meter Fee $1,916.96 $1,916.96 Paid 04/19/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/26/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/27/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 07/27/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 8/2/2022 (2:00) 8/2/2022 08/02/2022
Misc
Informational
08/02/2022
Main footing for all buildings complete
Underslab Plumbing Inspection - Commercial Passed 8/12/2022 8/12/2022 08/12/2022
Water Service Inspection Partial 08/15/2022
Misc
Informational
08/15/2022
Miller plumbing had installed water service using poly line. Not 10’ of copper coming from meter pit. ESS needs to correct copper out of meter pit to have at least 10’ for all 4 services connected to poly going to building. 8/15/22 ES
Underslab Electrical Inspection - Commercial Passed 8/16/2022 08/16/2022
Water Service Inspection Partial 08/18/2022
Misc
Informational
08/15/2022
Miller plumbing had installed water service using poly line. Not 10’ of copper coming from meter pit. ESS needs to correct copper out of meter pit to have at least 10’ for all 4 services connected to poly going to building. 8/15/22 ES ESS fixed 3 of the 4 service lines 1061, 1063, 1065 are good with copper and poly connection. 1059 still needs copper replaced coming out of meter pit. 8/18/22 ES
Water Service Inspection Passed 08/29/2022
Misc
Informational
08/18/2022
Miller plumbing had installed water service using poly line. Not 10’ of copper coming from meter pit. ESS needs to correct copper out of meter pit to have at least 10’ for all 4 services connected to poly going to building. 8/15/22 ES ESS fixed 3 of the 4 service lines 1061, 1063, 1065 are good with copper and poly connection. 1059 still needs copper replaced coming out of meter pit. 8/18/22 ES ESS replaced copper on meter at 1059. Now has at least 10’ of copper out of meter before connecting to poly for run into building. 8/25/22 ES
Sewer Service Inspection Passed 09/16/2022
Misc
Informational
09/16/2022
Tied this buildings sanitary connection on south side into line running along with building 9 line using a 6" wye connection and 6" SDR26 pipe to 6" wye main connection. 9/9/22 ES
Footing Inspection - Commercial Passed 9/21/2022 9/21/2022 09/21/2022
Misc
Informational
08/02/2022
Main footing for all buildings complete Patio footing complete
All Rough Inspection - Commercial Failed 1/19/2023 1/19/2023 01/19/2023
Misc
Corrective Action Required
01/19/2023
Land electrical at all bath fans, provide bonding screw and jumper at all metallic boxes at all units In addition: 1063-Provide anchor bolts rear exterior wall both sides of sgd, land electrical upstairs bath ceilings, support dwv 4’ oc in attic space bath 2 1059-seal penetrations and protect dryer.
Electrical Service Inspection Passed 1/23/2023 1/23/2023 01/23/2023
Misc
Informational
01/23/2023
Service for building 11: Units 1059, 1061, 1063, 1065, and House panel
All Rough Inspection - Commercial Partial 01/24/2023
Misc
Corrective Action Required
01/19/2023
-Provide bonding screw and jumper at metallic boxes at all entry doors **OK FOR ROCK
All Rough Inspection - Commercial Passed 01/27/2023
Misc
Resolved
01/27/2023
-Provide bonding screw and jumper at metallic boxes at all entry doors **OK FOR ROCK
Rated Assembly Inspection Passed 01/27/2023
Rated Assembly Inspection Passed 01/27/2023
Occupancy Inspection - Codes Commercial Failed 5/25/2023 5/25/2023 05/25/2023
Misc
Corrective Action Required
05/25/2023
1063-Install sinks 1065-Seal mechanical room penetrations
Occupancy Inspection - Codes Commercial Ready for Temp CO 5/26/2023 5/26/2023 05/26/2023
Misc
Resolved
05/26/2023
1063-Install sinks 1065-Seal mechanical room penetrations
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/26/2023 6/26/2023 06/26/2023
Occupancy Inspection - Codes Commercial Ready for Temp CO 7/27/2023 07/27/2023
Erosion Control Inspection Residential Passed 09/27/2023
Erosion Control Inspection Residential Passed 09/27/2023
Occupancy Inspection - Codes Commercial Full C of O 8/26/2023 09/27/2023
Documents & Images
Date Uploaded File Type Document Name
04/19/2022 Receipt Receipt for transaction:2022-002190
04/29/2022 Letter DS Building Permit
08/02/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/16/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
09/21/2022 Letter INSPECTION SUMMARY
01/19/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/24/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
05/25/2023 Letter INSPECTION SUMMARY
05/26/2023 Certificate/License Codes Temporary Certificate of Occupancy
05/26/2023 Receipt Receipt for transaction:2023-003714
06/26/2023 Substantial Completion and TCO Extension Request_prcom20220895 - 6_26_23
06/27/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/27/2023 Receipt Receipt for transaction:2023-004912
07/27/2023 Certificate/License Codes Temporary Certificate of Occupancy
07/27/2023 Receipt Receipt for transaction:2023-005857
09/27/2023 Letter Field Certificate of Occupancy
09/27/2023 Letter INSPECTION SUMMARY
09/27/2023 Letter INSPECTION SUMMARY
09/27/2023 Letter Codes Final Certificate of Occupancy
01/02/2024 Codes Temporary Certificate of Occupancy206
01/02/2024 Codes Temporary Certificate of Occupancy245
01/02/2024 Codes Temporary Certificate of Occupancy266
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home