Permit Application Status

PRCOM20220365


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220365
Building Permit - Commercial
Certificate of Occupancy
MIDWEST DIVISION LSH LLC
ADDITION COMMERCIAL
ADDITION TO EXISTING HOSPITAL ICU
01/27/2022
03/29/2022
08/23/2022
07/31/2023
Locations
Contacts
LYTLE CONSTRUCTION INC, Address:18505 E 163RD ST, Phone:(816) 524-7275  
deanhohenberg@lytleconst.com, Address:deanhohenberg@lytleconst.com, Phone:(816) 289-4132  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 05/08/2023 04/27/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
04/27/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Stamped plans received 4/23/2003
Installation acceptance testing
Corrective Action Required
04/27/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 04/20/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
04/20/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received 4/13/2022.
Installation acceptance testing
Corrective Action Required
04/20/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a hydrstatic test and above ceiling inspection.
Final Development Plan Review Approved 03/25/2022 03/29/2022
Joe Frogge
Building Plan Review Approved 03/01/2022 03/29/2022
Joe Frogge
IBC 706.1 Fire and Smoke Protection - General
Resolved
02/24/2022

Inadequate information to complete review. Provide the following: - Construction details for all rated wall and roof assemblies including exterior walls. (only able to find U465) - Plumbing piping material schedule.
Final Development Plan
Resolved
03/29/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 2/24/22 - Acknowledged in letter.
IBC 602.2 Type of Construction - Types I and II
Resolved
02/24/2022

2018 IBC 602.2 Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Specify fire protection at structural elements. (noted as "reference structural" but not found in S-series drawings)
ICC A117.1 904.3 Sales and Service Counters
Resolved
02/24/2022

ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) Action required: Provide minimum 36" length of accessible counter at Nurse Station 1-IC1501.
IMC 306.5 Equipment on roofs
Resolved
02/24/2022

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide means of permanent roof access. 2/24/22 - Per architect existing access is adeequate and new curb is less than 30"
IBC 1209.2 Finish materials
Resolved
02/24/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials adjacent to (not just behind) water closets. If paint is used it must be epoxy based.
Planning - Screening of rooftop equipment
Resolved
03/29/2022

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment (including exhaust fans) will be screened from all 4 sides per referenced UDO section. (unless otherwise approved, this must be accomplished at the parapets - contact Planning Department for more information - 816.969.1600) 2/24/22 - to be addressed at FDP - field verify
NEC Article 517.13 Grounding of receptacles patient care
Resolved
03/02/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system. 2/22/22 - this comment is for the redundant ground in patient care areas.. referenced note not adequate. 3/2/22 - covered in spec - all conduit
Licensed Contractors Approved 03/01/2022 03/08/2022
Joe Frogge
LC - General Contractor
Resolved
03/08/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent. 2/24/22 - Acknowledged in letter.
LC - MEP Subs
Resolved
03/08/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 2/24/22 - Acknowledged in letter.
Fire Plan Review Approved 03/01/2022 02/23/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
02/22/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Miscellaneous Correction
Corrective Action Required
02/22/2022

Provide a tempporary exiting plan.
Misc
Corrective Action Required
02/22/2022

5306.5 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall be installed in accordance with NFPA 99 and the general provisions of this chapter. Existing medical gas systems shall be maintained in accordance with the maintenance, inspection and testing provisions of NFPA 99 for medical gas systems. Action required- Provide documentation of gas line pressure testing. Labeling to be verified at time of inspection.
Fire Plan Review Approved with Conditions 02/10/2022 02/09/2022
Jim Eden
Construction documents for fire alarm systems
Informational
02/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Informational
02/22/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Miscellaneous Correction
Informational
02/22/2022

Provide a tempporary exiting plan.
Misc
Informational
02/22/2022

5306.5 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall be installed in accordance with NFPA 99 and the general provisions of this chapter. Existing medical gas systems shall be maintained in accordance with the maintenance, inspection and testing provisions of NFPA 99 for medical gas systems. Action required- Provide documentation of gas line pressure testing. Labeling to be verified at time of inspection.
Building Plan Review Rejected 02/10/2022 02/07/2022
Joe Frogge
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
02/03/2022

Inadequate information to complete review. Provide the following: - Construction details for all rated wall and roof assemblies including exterior walls. (only able to find U465) - Plumbing piping material schedule.
Final Development Plan
Corrective Action Required
02/03/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
IBC 602.2 Type of Construction - Types I and II
Corrective Action Required
02/03/2022

2018 IBC 602.2 Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Specify fire protection at structural elements. (noted as "reference structural" but not found in S-series drawings)
ICC A117.1 904.3 Sales and Service Counters
Corrective Action Required
02/07/2022

ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) Action required: Provide minimum 36" length of accessible counter at Nurse Station 1-IC1501.
IMC 306.5 Equipment on roofs
Corrective Action Required
02/07/2022

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide means of permanent roof access.
IBC 1209.2 Finish materials
Corrective Action Required
02/07/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials adjacent to (not just behind) water closets. If paint is used it must be epoxy based.
Planning - Screening of rooftop equipment
Corrective Action Required
02/07/2022

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment (including exhaust fans) will be screened from all 4 sides per referenced UDO section. (unless otherwise approved, this must be accomplished at the parapets - contact Planning Department for more information - 816.969.1600)
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
02/07/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Licensed Contractors Rejected 02/10/2022 02/03/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
02/03/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
02/03/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $9,625.00 $9,625.00 Paid 03/25/2022
7232302-Commercial Excise Tax Fee $3,097.50 $3,097.50 Paid 03/25/2022
9110068-Storm Sewer Inspection Fee $637.26 $637.26 Paid 03/25/2022
9110081-Paved Surface Inspection Fee $250.56 $250.56 Paid 03/25/2022
9110071-Site Grading Fee $648.39 $648.39 Paid 03/25/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/18/2023
Outstanding Fees Amount Paid Owing Date Paid
9110078-Temporary Occupancy Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Pavement-Curb Construction Partial 6/27/2022 06/27/2022
Misc
Informational
06/27/2022
06/27/22 Monday Contractor waiting for concrete, approximately 14yards schedule to be poured. 12” of concrete to be poured (4” more than project plans required) with wire mesh screen.
Storm Sewer Construction Inspection Partial 6/28/2022 06/28/2022
Misc
Informational
06/14/2022
06/14/22 Tuesday ( Rand Construction Co.) Contractor is cut and jackhammering existing storm box to install 24” HDPE storm line. Existing parking lot and light pole base structure was excavated to access storm box. 06/15/22 Wednesday ( Rand Construction Co.) Contractor was able to finish jackhammer storm box and was able to install one stick of 24” HDPE corrugated pipe. Contractor is waiting for concrete to to pour invert and collar. 06/16/22 Thursday (Rand Construction Co.) Contractor did not pour inverts are collars yesterday. 2 sticks of 24” HPDE was installed. 06/17/22 Friday (Rand Construction Co.) Contractor installed the base of Nyloplast to the new 24” HDPE and the existing 12” HDPE Storm lines. Contractor continued to excavate area as-per plan. 06/21/22 Tuesday ( Rand Construction Co.) Contractor poured the collar for the newly installed 24” HDPE storm pipe running to the existing storm box 06/20/22 Monday. Contractor will pour invert for existing storm box later. Contractor used remote control Tamper to compact the lifts over newly installed storm pipe 06/21 thru 06/21. Contractor installed one stick 20’ of 12” HDPE storm pipe out of the Nyloplast heading North as per plans. 06/22/22 Wednesday (Rand Construction Co.) Contractor installed one more stick 20’ of 12” HDPE storm pipe & back filled and used remote control Tamper for compaction. 06/23/22 Thursday (Rand Construction Co.) Contractor installed Nyloplast at Sta 1 and 12” HDPE storm pipe. 06/28/22 Tuesday (Rand Construction CO.) Contractor installed approximately 40’ and 12” HDPE two Nyloplast & 13’ and 6” HDPE. Approximately 15’ of 8” HDPE was installed. 06/29/22 Wednesday (Rand Construction Co.) Backfilling filling site . Work at site will be more clean up throughout the rest of the week. 06/30/22 Thursday Contractor poured/reinstalled invert for the enlarged storm pipe to existing storm box. Clean up. 07/21/22 Thursday JMJ ( Rand Construction Co./ General - Lytle Const. ) Contractor installed 16’ of 8” HDPE storm drain in the courtyard with Nyloplast drain for the courtyard. As-per plan
Miscellaneous Correction
Informational
06/28/2022
06/27/22 Monday Contractor pour approximately 14yards of pavement in docking area Southeast end of project ( over the excavation to of the newly installed storm sewer.)
Site Visit Partial 7/7/2022 07/07/2022
Misc
Informational
07/07/2022
07/07/22 Thursday No work performed today but 6” HPDE corrugated storm piping coming from the building.
Misc
Informational
07/12/2022
07/12/2 General Lytle Construction Inc. Working with subcontractors on boring to run 4” pipe to a sump pump. 7-14-22 RH. Contractor still continuing to bore 4” pipe to a sump pump. 08/04/22 Thursday JMJ Site visit no work at this time 10:25AM.
Erosion Control Inspection Residential Partial 7/14/2022 07/14/2022
Misc
Informational
07/14/2022
7-24-22 RH. Erosion control is up and in working order.
Pavement-Surface Partial 8/1/2022 08/01/2022
Misc
Informational
08/01/2022
08/01/22 Monday JMJ ( Lytle Construction - JJ Martiny Concrete ) Part of the Pad for the courtyard was poured 15’x30’. Concrete tickets will be collected at the end of the day. 08/02/22 Tuesday JMJ ( Lytle Construction - JJ Martiny Concrete ) Started pouring South-part of courtyard. Contractor is waiting for concrete to finish courtyard patio.
Grading/Excavation/Fill Inspection Partial 8/11/2022 08/11/2022
Misc
Informational
08/11/2022
08/11/22 Thursday JMJ ( Lytle Construction ) Contractor grading rock for the construction of parking lot.
Erosion Control Inspection Partial 8/11/2022 08/11/2022
Misc
Informational
08/11/2022
Erosion control is good for this site . Steve Robbins 08/11/2022 3:38 PM
Piers/Caissons Inspection - Commercial Partial 8/22/2022 (10:30) 8/22/2022 08/22/2022
Misc
Corrective Action Required
08/22/2022
THE FOLLOWING AREAS ARE APPROVED: -PIERS AT: F.9/16.8, F.9/15.4, F.3/14.9
Piers/Caissons Inspection - Commercial Partial 8/22/2022 (2:00) 8/22/2022 08/22/2022
Misc
Corrective Action Required
08/22/2022
THE FOLLOWING AREAS ARE APPROVED: -PIERS AT: F.9/16.8, F.9/15.4, F.3/14.9 8/22: E.5/15.2, C.5/15.8, C.5/16.8, B.9/16.8
Piers/Caissons Inspection - Commercial Partial 8/23/2022 (1:30) 8/23/2022 08/23/2022
Misc
Corrective Action Required
08/22/2022
THE FOLLOWING AREAS ARE APPROVED: -PIERS AT: F.9/16.8, F.9/15.4, F.3/14.9, E.5/15.2, C.5/15.8, C.5/16.8, B.9/16.8, B.9/14.8 LINE 15.4 FROM F.4-D.1, LINE 16.8 FROM F.4 TO D.1
Footing Inspection - Commercial Partial 8/26/2022 (9:00) 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/26/2022
-All PIERS FOR GRADE BEAMS COMPLETED
Piers/Caissons Inspection - Commercial Partial 8/26/2022 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/23/2022
THE FOLLOWING AREAS ARE APPROVED: -PIERS AT: F.9/16.8, F.9/15.4, F.3/14.9, E.5/15.2, C.5/15.8, C.5/16.8, B.9/16.8, B.9/14.8 LINE 15.4 FROM F.4-D.1, LINE 16.8 FROM F.4 TO D.1, D.4/15.2, F.8/14.9
Footing Inspection - Commercial Partial 8/26/2022 (1:30) 8/26/2022 08/26/2022
Misc
Informational
08/26/2022
-All PIERS FOR GRADE BEAMS COMPLETED -GRADE BEAMS AT: LINE 16.8 FROM F.9 TO D.6, LINE F.4 FROM 16.8 TO 15.9
Footing Inspection - Commercial Partial 8/29/2022 (1:30) 8/29/2022 08/29/2022
Misc
Informational
08/26/2022
-All PIERS FOR GRADE BEAMS COMPLETED -GRADE BEAMS AT: LINE 16.8 FROM F.9 TO C.5 LINE F.4 COMPLETE LINE 14.9 COMPLETE
Footing Inspection - Commercial Passed 8/30/2022 (1:30) 8/30/2022 08/30/2022
Misc
Informational
08/29/2022
FOOTINGS FOR ADDITION COMPLETE
Underslab Plumbing Inspection - Commercial Partial 8/31/2022 08/31/2022
THE FOLLOWING AREAS ARE APPROVED
Informational
08/31/2022
-MAIN SANITARY TRUNK LINE: TIE IN TO EXISTING AND COMPLETE LENGTHs NORTH AND SOUTH
Underslab Plumbing Inspection - Commercial Partial 9/15/2022 9/15/2022 09/15/2022
THE FOLLOWING AREAS ARE APPROVED
Informational
08/31/2022
-ADDITION COMPLETE
In-wall Inspection Partial 11/14/2022 11/14/2022
Misc
Informational
11/14/2022
**EXTERIOR FRAMING OK TO COVER
Rated Assembly Inspection Partial 11/22/2022 11/22/2022 11/22/2022
Misc
Informational
11/22/2022
-Exterior sheathing ok to cover
Above Ceiling Inspection Partial 12/27/2022 12/28/2022 12/28/2022
Misc
Informational
12/28/2022
ABOVE-CEILING STORM DRAIN-OK
In-wall Inspection Partial 1/27/2023 01/27/2023
Misc
Informational
11/14/2022
**EXTERIOR FRAMING OK TO COVER IN-WALL OK BELOW: -Electrical room 1504 -OK to rock wall side in corridor 1511/1502/1524/1525 after protecting plumbing at bottom wall tracks with BOCA plates **Do not rock firewall at this time. Protect penetrations
Rated Assembly Inspection Partial 1/31/2023 1/31/2023 01/31/2023
Misc
Informational
11/22/2022
-Exterior sheathing ok to cover -Shaft layer at separation wall to existing ok
In-wall Inspection Partial 2/8/2023 2/8/2023 02/08/2023
Misc
Informational
01/27/2023
**EXTERIOR FRAMING OK TO COVER BOTH SIDES IN-WALL OK BELOW: -Electrical room 1504 -OK to rock wall side in corridor 1511/1502/1524/1525 after protecting plumbing at bottom wall tracks with BOCA plates
Rated Assembly Inspection Partial 2/8/2023 2/8/2023 02/08/2023
Misc
Informational
01/31/2023
-Exterior sheathing ok to cover -Shaft layer at separation wall to existing ok -First layer at fire wall ok
Rated Assembly Inspection Partial 2/21/2023 2/21/2023 02/21/2023
Misc
Informational
02/08/2023
-Exterior sheathing ok to cover -Shaft layer at separation wall to existing ok -First and second layer at fire wall ok
In-wall Inspection Partial 2/21/2023 2/21/2023 02/21/2023
Misc
Informational
02/08/2023
**EXTERIOR FRAMING OK TO COVER BOTH SIDES IN-WALL OK BELOW: -Rooms 1504-1506, 1508-1510, 1514, 1515, 1517, 1518, 1520-1522, 1530, 1531, 1534
In-wall Inspection Partial 3/13/2023 3/13/2023 03/13/2023
Misc
Informational
02/21/2023
**EXTERIOR FRAMING OK TO COVER BOTH SIDES IN-WALL OK BELOW: -Rooms 1504-1506, 1508-1510, 1514, 1515, 1517, 1518, 1520-1522, 1530, 1531, 1534 1512,1513,1523,1528,1532,1533,1503
Underslab Plumbing Inspection - Commercial Partial 3/30/2023 3/30/2023 03/30/2023
THE FOLLOWING AREAS ARE APPROVED
Informational
09/15/2022
-ADDITION COMPLETE -RESTROOMS 1-1C1413 AND 1-IC1395
In-wall Inspection Partial 4/3/2023 4/3/2023 04/03/2023
Misc
Informational
03/13/2023
**EXTERIOR FRAMING OK TO COVER BOTH SIDES IN-WALL OK BELOW: -Rooms 1504-1506, 1508-1510, 1514, 1515, 1517, 1518, 1520-1522, 1530, 1531, 1534 1512,1513,1523,1528,1532,1533,1503, 1395,1413 **PROTECT ALL PENETRATIONS OF RATED WALL
Above Ceiling Inspection Failed 4/25/2023 4/25/2023 04/25/2023
Misc
Informational
12/28/2022
ABOVE-CEILING STORM DRAIN-OK **PROVIDE IDENTIFICATION OF 1-HR RATED WALL PER CODE.
Alarm Test Passed 5/12/2023 05/12/2023
In-wall Inspection Passed 5/15/2023 05/15/2023
Misc
Resolved
05/15/2023
**EXTERIOR FRAMING OK TO COVER BOTH SIDES IN-WALL OK BELOW: -Rooms 1504-1506, 1508-1510, 1514, 1515, 1517, 1518, 1520-1522, 1530, 1531, 1534 1512,1513,1523,1528,1532,1533,1503, 1395,1413 **PROTECT ALL PENETRATIONS OF RATED WALL
Underslab Plumbing Inspection - Commercial Passed 5/15/2023 05/15/2023
THE FOLLOWING AREAS ARE APPROVED
Resolved
05/15/2023
-ADDITION COMPLETE -RESTROOMS 1-1C1413 AND 1-IC1395
Rated Assembly Inspection Passed 5/15/2023 05/15/2023
Misc
Resolved
05/15/2023
-Exterior sheathing ok to cover -Shaft layer at separation wall to existing ok -First and second layer at fire wall ok
Piers/Caissons Inspection - Commercial Passed 5/15/2023 05/15/2023
Misc
Resolved
05/15/2023
THE FOLLOWING AREAS ARE APPROVED: -PIERS AT: F.9/16.8, F.9/15.4, F.3/14.9, E.5/15.2, C.5/15.8, C.5/16.8, B.9/16.8, B.9/14.8 LINE 15.4 FROM F.4-D.1, LINE 16.8 FROM F.4 TO D.1, D.4/15.2, F.8/14.9
Occupancy Inspection - Fire Passed 5/15/2023 5/15/2023 05/15/2023
Above Ceiling Inspection Passed 5/15/2023 05/15/2023
Misc
Resolved
05/15/2023
ABOVE-CEILING STORM DRAIN-OK **PROVIDE IDENTIFICATION OF 1-HR RATED WALL PER CODE.
Occupancy Inspection - Codes Commercial Failed 5/15/2023 5/15/2023 05/15/2023
Misc
Corrective Action Required
05/15/2023
-Approval required from Development Service Engineering, Planning, and 3rd party special inspection -Provide handrail for north exit outdoor stair -Receptacle inside restroom shall be gfci-protected
Occupancy Inspection - Codes Commercial Failed 5/17/2023 5/17/2023 05/17/2023
Misc
Corrective Action Required
05/15/2023
-Approval required from Development Service Engineering, Planning, and 3rd party special inspection Approval required from all departments prior to occupying -Phase 1: following rooms: 1501, 1503-1515, 1517-1518, 1520-1521, 1523-1528, 1530-1537, 1413 staff toilets 1395 patient toilet
Occupancy Inspection - Codes Commercial Ready for Temp CO 5/18/2023 05/18/2023
Misc
Corrective Action Required
05/17/2023
-Approval required from Development Service Engineering, Planning **TCO approved for occupancy
Occupancy Inspection - Engineering Passed 5/18/2023 5/18/2023 05/18/2023
Misc
Informational
05/18/2023
No items for punch list. Occupancy Inspection-Passed
In-wall Inspection Passed 6/12/2023 6/12/2023 06/12/2023
Misc
Informational
06/12/2023
Phase I and II in-wall-OK
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/15/2023 06/15/2023
Misc
Corrective Action Required
05/18/2023
-Approval required from Development Service Engineering, Planning **TCO approved for occupancy
Misc
Corrective Action Required
05/18/2023
-Phase 1: following rooms: 1501, 1503-1515, 1517-1518, 1520-1521, 1523-1528, 1530-1537, 1413 staff toilets 1395 patient toilet
Above Ceiling Inspection Partial 7/6/2023 7/6/2023 07/06/2023
Misc
Corrective Action Required
07/05/2023
1st phase OK 2nd phase RT1425, IC1416 OK
Occupancy Inspection - Codes Commercial Failed 7/19/2023 7/19/2023 07/19/2023
Misc
Corrective Action Required
06/15/2023
-Approval required from: Planning, Fire **TCO approved for occupancy for phase 1 area only
Misc
Corrective Action Required
06/15/2023
-Phase 1: following rooms: 1501, 1503-1515, 1517-1518, 1520-1521, 1523-1528, 1530-1537, 1413 staff toilets 1395 patient toilet Phase II-Do not occupy until life safety (See Fire list) issue is resolved
Occupancy Inspection - Planning Passed 7/19/2023 07/21/2023
Occupancy Inspection - Codes Commercial Full C of O 7/31/2023 07/31/2023
Misc
Resolved
07/31/2023
-Approval required from: Planning, Fire **TCO approved for occupancy for phase 1 area only
Misc
Resolved
07/31/2023
-Phase 1: following rooms: 1501, 1503-1515, 1517-1518, 1520-1521, 1523-1528, 1530-1537, 1413 staff toilets 1395 patient toilet Phase II-Do not occupy until life safety (See Fire list) issue is resolved
Documents & Images
Date Uploaded File Type Document Name
01/27/2022 Application Form 3-21112_LSMC ICU Bldg Permit Application_rev
01/27/2022 Specifications Project Manual Volume 2
01/27/2022 Specifications Project Manual Volume 1
01/27/2022 Plans Expansion Bid Documents
02/09/2022 Letter Fire Building Plan Review
02/10/2022 Letter DS P/R Corrections Document
02/21/2022 Plans LSMC_ICU Permit Revised Plan Sheets
02/21/2022 Letter Permit Review Response_20220221
02/23/2022 Letter Fire Building Plan Review
02/24/2022 Letter DS P/R Corrections Document
03/02/2022 Email Elec Ground Comment response
03/25/2022 Receipt Receipt for transaction: 2022-001650
03/29/2022 Approved Plans approved plans
03/29/2022 Letter License Tax Bill
03/29/2022 Approved Plans Approved LSMC ICU Expansion FDP 3.29.2022
03/30/2022 Letter DS Building Permit
04/13/2022 LEE'S SUMMIT MEDICAL CENTER ICU EXPANSION PE STAMPED
04/13/2022 LSMC ICU EXPANSION CALC AREA 1 PE STAMPED
04/13/2022 LSMC ICU EXPANSION CALC AREA 2 PE STAMPED
04/13/2022 City Submittal - LEE'S SUMMIT MEDICAL CENTER ICU EXPANSION
04/20/2022 Letter Fire (Sprinkler) Plan Review
04/27/2022 Letter Codes Residential Plan Review
06/14/2022 image
06/14/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/17/2022 image0
06/21/2022 image1
06/22/2022 image2
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
07/07/2022 image3
07/07/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 image4
08/01/2022 image5
08/01/2022 image6
08/01/2022 Letter INSPECTION SUMMARY
08/02/2022 image7
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/23/2022 Excavation Equipment for Piers
08/23/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter INSPECTION SUMMARY
08/30/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
09/15/2022 Letter INSPECTION SUMMARY
11/14/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
12/28/2022 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
01/31/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
02/21/2023 Letter INSPECTION SUMMARY
02/21/2023 Letter INSPECTION SUMMARY
03/13/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/25/2023 44OP-331138 - HCA - Lees Summit-ICU Exp TLS Signed
04/25/2023 44OP-331138 HCA - Lees Summit-ICU Exp Submittal-R0 TLS Signed
04/25/2023 Letter INSPECTION SUMMARY
04/27/2023 Letter Fire (Alarm) Plan Review Notice
05/15/2023 Letter INSPECTION SUMMARY
05/15/2023 Letter INSPECTION SUMMARY
05/15/2023 Letter INSPECTION SUMMARY
05/15/2023 Letter INSPECTION SUMMARY
05/15/2023 Letter INSPECTION SUMMARY
05/15/2023 Letter INSPECTION SUMMARY
05/17/2023 Terracon Reports
05/17/2023 27 - med gas report - MTA - 5_15_23
05/17/2023 Letter INSPECTION SUMMARY
05/18/2023 Certificate/License Codes Temporary Certificate of Occupancy
05/18/2023 Receipt Receipt for transaction:2023-003426
05/18/2023 Letter INSPECTION SUMMARY
05/18/2023 Letter INSPECTION SUMMARY
06/07/2023 TCOExtension Request Form Filled Out
06/12/2023 Letter INSPECTION SUMMARY
07/06/2023 Letter INSPECTION SUMMARY
07/19/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter Codes Final Certificate of Occupancy
01/02/2024 Codes Temporary Certificate of Occupancy199
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home