Permit Application Status

PRCOM20215821


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215821
Building Permit - Commercial
Final Completion
INSITE TOWERS DEVELPOMENT LLC
ALTERATION COMMERCIAL
ELECTRICAL MODIFICATIONS TO EXISTING TOWER SYSTEM
11/05/2021
03/02/2022
03/29/2022
Locations
Contacts
LAB ARCHITECTS, Address:49030 PONTIAC TRAIL SUITE 400, Phone:(248) 705-9212  
INSITE TOWERS DEVELPOMENT LLC, Address:PO BOX 460389  
kswenson@smj-llc.com, Address:kswenson@smj-llc.com  
FREEDOM ELECTRIC PROFESSIONALS INC, Address:P O BOX 534, Phone:(816) 847-9900  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 11/17/2021 03/01/2022
Joe Frogge
Final Development Plan
Resolved
03/01/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Licensed Contractors Approved 11/17/2021 02/24/2022
Joe Frogge
LC - MEP Subs
Resolved
02/24/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $80.00 $80.00 Paid 03/02/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Passed 3/29/2022 3/29/2022 03/29/2022
Misc
Informational
03/30/2022
METER SOCKET LABELED "A" T-MOBILE
Final Electrical Inspection - Commercial Passed 3/29/2022 03/29/2022
Misc
Informational
03/31/2022
METER SOCKET LABELED "A" T-MOBILE
Verify Final Inspection (Final) Complete 3/29/2022 03/29/2022
Underground Electrical Inspection - Commercial Passed 05/19/2022
Misc
Informational
05/19/2022
-Conduit from meter bank to pad with ground ring for Dish network equipment
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home