Summary
PRCOM20215246
Building Permit - Commercial
Closed
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB FOR APARTMENT BUILDING **THIS PERMIT INCLUDES 1 STORY FRAMING BUT NO INSPECTIONS UNTIL WATER INFRASTRUCTURE IS FULLY TESTED AND APPROVED. ***INSPECTIONS COMPLETED UNDER PERMIT PRCOM20213681
10/07/2021
11/03/2021
12/15/2023
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
nwintjen@brinkmannconstructors.com, Address:nwintjen@brinkmannconstructors.com  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
TRI Architects, Address:9812 Manchester rd, Phone:(314) 395-9750  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/07/2021 10/07/2021
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,792.56 $1,792.56 Paid 10/27/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 11/9/2021 (1:00) 11/9/2021 11/09/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/09/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS @ NW CORNER TO NE -
Footing Inspection - Commercial Partial 11/10/2021 (11:00) 11/10/2021 11/10/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/09/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST -
Underslab Plumbing Inspection - Commercial Partial 11/11/2021 11/11/2021 11/11/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/11/2021
- 217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG -
Underslab Plumbing Inspection - Commercial Partial 11/12/2021 11/12/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/11/2021
- 217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG - -11/12/21 INSPECTED STUB UPS AT WYE FITTINGS OF TRUNK LINES INSPECTED ON 11/11/21 (217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG)
Footing Inspection - Commercial Partial 11/12/2021 11/12/2021 11/12/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/10/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST
Footing Inspection - Commercial Partial 11/15/2021 (1:00) 11/15/2021 11/15/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/12/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner
Footing Inspection - Commercial Partial 11/16/2021 (11:00) 11/16/2021 11/16/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/15/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner -
Footing Inspection - Commercial Partial 11/17/2021 (1:00) 11/17/2021 11/17/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/16/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south -
Footing Inspection - Commercial Partial 11/18/2021 (1:00) 11/18/2021 11/18/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/17/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA -
Footing Inspection - Commercial Partial 11/19/2021 (1:00) 11/19/2021 11/19/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/18/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING -
Underslab Plumbing Inspection - Commercial Partial 11/22/2021 11/22/2021 11/22/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/12/2021
- 217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG - -11/12/21 INSPECTED STUB UPS AT WYE FITTINGS OF TRUNK LINES INSPECTED ON 11/11/21 (217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG) - 11/22/21 EAST WING OF BLDG MAIN TRUCK FROM ELEVATOR PIT RUNNING SOUTH -
Footing Inspection - Commercial Partial 11/22/2021 11/22/2021 11/22/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/19/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW
Footing Inspection - Commercial Partial 11/24/2021 (8:00) 11/24/2021 11/24/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/22/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH -
Foundation Inspection - Commercial Partial 11/29/2021 11/29/2021
Misc
Informational
11/29/2021
- 11/29/21 foundation wall at elevator pit -
Footing Inspection - Commercial Partial 11/29/2021 (11:15) 11/29/2021 11/29/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/24/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT -
Footing Inspection - Commercial Partial 11/30/2021 (11:00) 11/30/2021 11/30/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/29/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING WEST EXTERIOR WALL 70' GOING SOUTH -
Underslab Plumbing Inspection - Commercial Partial 12/1/2021 12/1/2021 12/01/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/22/2021
- 217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG - -11/12/21 INSPECTED STUB UPS AT WYE FITTINGS OF TRUNK LINES INSPECTED ON 11/11/21 (217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG) - 11/22/21 EAST WING OF BLDG MAIN TRUCK FROM ELEVATOR PIT RUNNING SOUTH - - 12/1/21 EAST WING MAIN TRUNK 70' GOING NORTH, NORTH WING MAIN TRUNK 50' GOING EAST -
Footing Inspection - Commercial Partial 12/1/2021 (11:00) 12/1/2021 12/01/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/30/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH -
Underslab Plumbing Inspection - Commercial Partial 12/2/2021 12/2/2021 12/02/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/01/2021
- 217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG - -11/12/21 INSPECTED STUB UPS AT WYE FITTINGS OF TRUNK LINES INSPECTED ON 11/11/21 (217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG) - 11/22/21 EAST WING OF BLDG MAIN TRUCK FROM ELEVATOR PIT RUNNING SOUTH - - 12/1/21 EAST WING MAIN TRUNK 70' GOING NORTH, NORTH WING MAIN TRUNK 50' GOING EAST - - 12/2/21 UNDERSLAB NORTH WING BLDG 2 AREA A -
Footing Inspection - Commercial Partial 12/3/2021 (11:00) 12/3/2021 12/03/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/01/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINF SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL -
Footing Inspection - Commercial Partial 12/6/2021 (11:00) 12/6/2021 12/06/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/03/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT -
Footing Inspection - Commercial Partial 12/7/2021 (11:00) 12/7/2021 12/07/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/06/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT - - 12/7/21 EAST WING AREA C (7) PADS EAST OF MAIN TRUNK SOUTH OF ELEVATOR -
Footing Inspection - Commercial Partial 12/8/2021 (11:15) 12/8/2021 12/08/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/07/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT - - 12/7/21 EAST WING AREA C (7) PADS EAST OF MAIN TRUNK SOUTH OF ELEVATOR - -12/8/21 EAST WING AREA C 60' FOOTING EAST SIDE GOING SOUTH -
Footing Inspection - Commercial Partial 12/9/2021 (11:00) 12/9/2021 12/09/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/08/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT - - 12/7/21 EAST WING AREA C (7) PADS EAST OF MAIN TRUNK SOUTH OF ELEVATOR - -12/8/21 EAST WING AREA C 60' FOOTING EAST SIDE GOING SOUTH - - 12/9/21 EAST WING AREA C 5 PADS EAST OF MAIN TRUNK, EAST EXTERIOR WALL TO SOUTH END OF BLDG -
Footing Inspection - Commercial Partial 12/10/2021 12/10/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/09/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT - - 12/7/21 EAST WING AREA C (7) PADS EAST OF MAIN TRUNK SOUTH OF ELEVATOR - -12/8/21 EAST WING AREA C 60' FOOTING EAST SIDE GOING SOUTH - - 12/9/21 EAST WING AREA C 5 PADS EAST OF MAIN TRUNK, EAST EXTERIOR WALL TO SOUTH END OF BLDG - - 12/10/21 EAST WING AREA C WEST EXTERIOR WALL FOOTING GOING SOUTH 20' SHORT OF FIRE RISER LINES -
Footing Inspection - Commercial Partial 12/10/2021 (11:15) 12/10/2021 12/10/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/10/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT - - 12/7/21 EAST WING AREA C (7) PADS EAST OF MAIN TRUNK SOUTH OF ELEVATOR - -12/8/21 EAST WING AREA C 60' FOOTING EAST SIDE GOING SOUTH - - 12/9/21 EAST WING AREA C 5 PADS EAST OF MAIN TRUNK, EAST EXTERIOR WALL TO SOUTH END OF BLDG - - 12/10/21 EAST WING AREA C WEST EXTERIOR WALL FOOTING GOING SOUTH 20' SHORT OF FIRE RISER LINES - - 12/10/21 EAST WING AREA C 4 PADS WEST OF MAIN TRUNK, COMPLETE FOOTING WEST EXTERIOR & SOUTH EXTERIOR -
Underslab Electrical Inspection - Commercial Partial 12/13/2021 12/13/2021 12/13/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/13/2021
- 12/13/21 UNDERSLAB CONDUIT KITCHEN ISLANDS, AREA A (2) C1 UNITS, (1) BI UNIT -
Footing Inspection - Commercial Partial 12/13/2021 12/13/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/10/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT - - 12/7/21 EAST WING AREA C (7) PADS EAST OF MAIN TRUNK SOUTH OF ELEVATOR - -12/8/21 EAST WING AREA C 60' FOOTING EAST SIDE GOING SOUTH - - 12/9/21 EAST WING AREA C 5 PADS EAST OF MAIN TRUNK, EAST EXTERIOR WALL TO SOUTH END OF BLDG - - 12/10/21 EAST WING AREA C WEST EXTERIOR WALL FOOTING GOING SOUTH 20' SHORT OF FIRE RISER LINES - - 12/10/21 EAST WING AREA C 4 PADS WEST OF MAIN TRUNK, COMPLETE FOOTING WEST EXTERIOR & SOUTH EXTERIOR - - 12/13/21 AREA A GRADE BEAMS REBAR PER PLAN-
Underslab Plumbing Inspection - Commercial Partial 12/15/2021 12/15/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/02/2021
- 217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG - -11/12/21 INSPECTED STUB UPS AT WYE FITTINGS OF TRUNK LINES INSPECTED ON 11/11/21 (217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG) - 11/22/21 EAST WING OF BLDG MAIN TRUCK FROM ELEVATOR PIT RUNNING SOUTH - - 12/1/21 EAST WING MAIN TRUNK 70' GOING NORTH, NORTH WING MAIN TRUNK 50' GOING EAST - - 12/2/21 UNDERSLAB NORTH WING BLDG 2 AREA A - - 12/15/21 UNDERSLAB PLUMBING BLDG 2 AREA B -
Underslab Plumbing Inspection - Commercial Partial 12/21/2021 12/21/2021 12/21/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/15/2021
- 217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG - -11/12/21 INSPECTED STUB UPS AT WYE FITTINGS OF TRUNK LINES INSPECTED ON 11/11/21 (217' MAIN TRUNK DOWN CENTER OF BLDG IN CORRIDOR STARTED AT 60' FROM EAST END OF BLDG) - 11/22/21 EAST WING OF BLDG MAIN TRUCK FROM ELEVATOR PIT RUNNING SOUTH - - 12/1/21 EAST WING MAIN TRUNK 70' GOING NORTH, NORTH WING MAIN TRUNK 50' GOING EAST - - 12/2/21 UNDERSLAB NORTH WING BLDG 2 AREA A - - 12/15/21 UNDERSLAB PLUMBING BLDG 2 AREA B - -12/21/21 UNDERSLAB PLUMBING BLDG 2 AREA C -
Footing Inspection - Commercial Partial 12/21/2021 12/21/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/13/2021
: NO GRID LINES ON CITY APPROVED PLANS : - HIGH LIGHTED PLANS APPROVED AREAS 50' @ NW CORNER TO NE - - 100' FOOTING NORTH EXTERIOR WALL WEST TO EAST - -11/12/21 90' FOOTING NORTH EXT WALL WEST TO EAST -11/15/21 90’ West to East around corner - 11/16/21 south exterior wall west to east to mid point of cell towers to 940 pryor, ufer located SW corner - - 11/17/21 50' west to east at above to corner going south - - 11/18/21 NORTH EAST CORNER TO SOUTH 35' FOOTING, 7 COLUMN PADS NE AREA - - 11/19/21 EAST END OF NORTH BUILDING 40' NORTH TO SOUTH, 4 PADS IN NORTH WING OF BUILDING - - 11/22/21 NORTH WING (5) PADS 9 BARS EW, (7) PADS 6 BARS EW - - 11/24/21 ELEVATOR PIT, 2 PADS & FOOTING ANGLE WALL AT COURTYARD TO SOUTH - - 11/29/21 EAST WING 20' EXTERIOR WALL EAST SIDE IN LINE WITH ELEVATOR PIT - -11/30/21 EAST WING EAST EXTERIOR WALL 70' GOING SOUTH - - 12/1/21 EAST WING EAST EXTERIOR WALL 50' GOING SOUTH - - 12/3/21 EAST WINg SECTION B 17 COLUMN PADS @ MAIN TRUNK (6) SOUTH OF ELEVATOR PIT, 35' FOOTING EAST WING SECTION C EXTERIOR WALL - - 12/6/21 EAST WING (5) PADS EAST OF MAIN TRUNK NEAR ELEVATOR PIT - - 12/7/21 EAST WING AREA C (7) PADS EAST OF MAIN TRUNK SOUTH OF ELEVATOR - -12/8/21 EAST WING AREA C 60' FOOTING EAST SIDE GOING SOUTH - - 12/9/21 EAST WING AREA C 5 PADS EAST OF MAIN TRUNK, EAST EXTERIOR WALL TO SOUTH END OF BLDG - - 12/10/21 EAST WING AREA C WEST EXTERIOR WALL FOOTING GOING SOUTH 20' SHORT OF FIRE RISER LINES - - 12/10/21 EAST WING AREA C 4 PADS WEST OF MAIN TRUNK, COMPLETE FOOTING WEST EXTERIOR & SOUTH EXTERIOR - - 12/13/21 AREA A GRADE BEAMS REBAR PER PLAN- - 12/21/21 AREA B GRADE BEAMS REBAR PER PLAN -
Underslab Electrical Inspection - Commercial Partial 12/21/2021 12/21/2021 12/21/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/13/2021
- 12/13/21 UNDERSLAB CONDUIT KITCHEN ISLANDS, AREA A (2) C1 UNITS, (1) BI UNIT - - 12/21/21 UNDERSLAB CONDUIT KITCHEN ISLANDS AREA B (5) UNITS
Underslab Electrical Inspection - Commercial Partial 12/27/2021 12/27/2021 12/27/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/21/2021
- 12/13/21 UNDERSLAB CONDUIT KITCHEN ISLANDS, AREA A (2) C1 UNITS, (1) BI UNIT - - 12/21/21 UNDERSLAB CONDUIT KITCHEN ISLANDS AREA B (5) UNITS - 12/27/21 BDLG 2 AREA C underslab conduit kitchen islands (5) units -
Documents & Images
Date Uploaded File Type Document Name
10/13/2021 Receipt Receipt for transaction:2021-007975
10/27/2021 Receipt Receipt for transaction:2021-008288
11/03/2021 Letter DS Building Permit
11/09/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/16/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/24/2021 Letter INSPECTION SUMMARY
11/29/2021 Letter INSPECTION SUMMARY
11/29/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/06/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/10/2021 Letter INSPECTION SUMMARY
12/10/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/15/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
05/16/2022 Letter Codes 140 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.