Permit Application Status

PRCOM20214702


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20214702
Building Permit - Commercial
Voided
LBP III LLC
CHANGE OF TENANT
ANESTHESIOLOGY OFFICE AND WAREHOUSE
09/08/2021
03/08/2022
04/02/2024
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
LBP III LLC, Address:3170 NE CARNEGIE DR STE 400  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Rejected 09/20/2021 09/09/2021
Joe Frogge
Project cost
Corrective Action Required
09/09/2021

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
09/09/2021

Insufficient information to complete review. Provide the following: - Wall construction details (fyi - this is a Type IIB building which means wood studs are not allowed) - Describe use of all rooms. (one is labelled just "room" and a lobby this size doesn't make sense with a primarily storage business)
IPC 403.1 Minimum number of fixtures
Corrective Action Required
09/09/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Clarify what is happening with xed out toilet. 2 toilets required unless code analysis justifies an occupant load of 25 or less which is not yet clear.
Licensed Contractors Approved 09/20/2021 09/09/2021
Joe Frogge
Fire Plan Review Rejected 09/20/2021 09/08/2021
Michael Weissenbach
Material safety and data sheets
Corrective Action Required
09/08/2021

2018 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. (Action Required) Provide a plan showing what and how much is being stored on site.
Construction documents for fire alarm systems
Corrective Action Required
09/08/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
09/08/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
09/08/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/08/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Show placement of fire extinguishers.
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
09/08/2021 Application Form doc15187020210908085837
09/08/2021 Application Form Licensetaxcopyrevised
09/08/2021 Drawing PDAfloorplanrevised
09/08/2021 Letter License Tax Bill
09/08/2021 Letter Fire Building Plan Review
09/09/2021 Letter DS P/R Corrections Document
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home