Permit Application Status

PRCOM20214607


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20214607
Building Permit - Commercial
Certificate of Occupancy
NEW MULTI-FAMILY
NEW 6 UNIT TOWNHOMES
09/02/2021
03/18/2022
05/11/2022
02/08/2023
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
nwintjen@brinkmannconstructors.com, Address:nwintjen@brinkmannconstructors.com  
ALDEN PLUMBING & MECHANICAL LLC, Address:5600 W 95TH ST STE307, Phone:(816) 666-8662  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
TRI Architects, Address:9812 Manchester rd, Phone:(314) 395-9750  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 05/19/2022 05/20/2022
Joe Frogge
Building Plan Review Approved 02/24/2022 03/18/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/12/2021

This review represents all 3 buildings currently submitted under phase 1. Action required: comment is for informational purposes.
Project cost
Resolved
03/10/2022

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We need a cost breakdown for each building. 10/1/21 - acknowledged in letter
Engineered truss package
Corrective Action Required
11/12/2021

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral. 10/1/21 - deferred per request
IBC 706.1 Fire and Smoke Protection - General
Resolved
11/15/2021

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3...... Action required: Provide nail/screw patterns at fire rated assemblies. (inspectors do not have access to UL books in field) 10/1/21 - construction details are in Appendix 1 of project manual
Miscellaneous Correction
Corrective Action Required
11/12/2021

2018 IRC 302..2.4 Parapets - exception to item #2 Action required: Comment is for informational purposes. Roof assembly design complies and drawings dictate no penetrations within 4' of separations but plumbing plans show VTRs within that 4'. Understood that drawings are schematic. To be field verified.
Final Development Plan Review Approved 03/18/2022
Joe Frogge
Special Inspections Review Approved 03/10/2022
Joe Frogge
Licensed Contractors Approved 11/19/2021 03/10/2022
Joe Frogge
LC - MEP Subs
Resolved
03/10/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/1/21 - acknowledged in letter
LC - General Contractor
Resolved
03/10/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A , Class B, or Class C license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/1/21 - acknowledged in letter
Building Plan Review Rejected 10/05/2021 10/01/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/28/2021

This review represents all 3 buildings currently submitted under phase 1. Action required: comment is for informational purposes.
Project cost
Corrective Action Required
09/28/2021

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We need a cost breakdown for each building. 10/1/21 - acknowledged in letter
Misc
Resolved
10/01/2021

Designs appear to be designed per IRC but code analysis suggests IBC. Action required: Update code analysis code references including type of construction.
Engineered truss package
Corrective Action Required
09/28/2021

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral. 10/1/21 - deferred per request
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
09/28/2021

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3...... Action required: Provide nail/screw patterns at fire rated assemblies. (inspectors do not have access to UL books in field) 10/1/21 - construction details are in Appendix 1 of project manual
Misc
Resolved
10/01/2021

2018 IRC R310 - emergency escape openings. Action required: Bedroom windows must meet all emergency egress requirements. To be field verified.
Misc
Resolved
10/01/2021

2018 IRC 302.5 Dwelling-garage opening and penetration protection. Action required: Specify self-closing device at doors between dwelling units and garages. Applies to man-door and door leading to under stair storage.
Misc
Resolved
10/01/2021

2018 IRC 302.7 Under-stair protection. Action required: Specify 1/2" gyp board at walls, under-stair, ceiling, etc. under stairs where access is provided.
Misc
Resolved
10/01/2021

2018 IRC 301.2.1 Wind design criteria. Action required: Provide verification that garage doors are designed and will be installed for minimum 90mph wind design zone.
IBC 1803.1 General - geotech
Resolved
10/01/2021

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Structural design criteria conflicts with report. Clarify.
Misc
Resolved
10/01/2021

2018 IRC 302.12 & 502.12 Draftstopping. Action required: Specify draftstopping at floor and roof assemblies.
Misc
Resolved
10/01/2021

HVAC condensing units shown on ground and roof. Action required: Clarify. Also, if on roof, electric outlets are required within 25' of each unit per 2018 IRC R3901.12.
Misc
Resolved
10/01/2021

2018 IRC R2903.3.1 Maximum pressure. Action required: Provide pressure reducing valve at each service.
Miscellaneous Correction
Resolved
10/01/2021

2018 IRC 2903.5 Water Hammer. Action required: Provide water hammer device(s) at all appropriate locations. Remove references to air chambers as they are no longer allowed.
Miscellaneous Correction
Corrective Action Required
09/28/2021

2018 IRC 302..2.4 Parapets - exception to item #2 Action required: Comment is for informational purposes. Roof assembly design complies and drawings dictate no penetrations within 4' of separations but plumbing plans show VTRs within that 4'. Understood that drawings are schematic. To be field verified.
Licensed Contractors Rejected 10/05/2021 10/01/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/28/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/1/21 - acknowledged in letter
LC - General Contractor
Corrective Action Required
09/28/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A , Class B, or Class C license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 10/1/21 - acknowledged in letter
Building Plan Review Rejected 09/20/2021 09/15/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/14/2021

This review represents all 3 buildings currently submitted under phase 1. Action required: comment is for informational purposes.
Project cost
Corrective Action Required
09/14/2021

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We need a cost breakdown for each building.
Misc
Corrective Action Required
09/14/2021

Designs appear to be designed per IRC but code analysis suggests IBC. Action required: Update code analysis code references including type of construction.
Engineered truss package
Corrective Action Required
09/15/2021

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request deferral.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
09/15/2021

2018 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3...... Action required: Provide nail/screw patterns at fire rated assemblies. (inspectors do not have access to UL books in field)
Misc
Corrective Action Required
09/15/2021

2018 IRC R310 - emergency escape openings. Action required: Bedroom windows must meet all emergency egress requirements. To be field verified.
Misc
Corrective Action Required
09/15/2021

2018 IRC 302.5 Dwelling-garage opening and penetration protection. Action required: Specify self-closing device at doors between dwelling units and garages. Applies to man-door and door leading to under stair storage.
Misc
Corrective Action Required
09/15/2021

2018 IRC 302.7 Under-stair protection. Action required: Specify 1/2" gyp board at walls, under-stair, ceiling, etc. under stairs where access is provided.
Misc
Corrective Action Required
09/15/2021

2018 IRC 301.2.1 Wind design criteria. Action required: Provide verification that garage doors are designed and will be installed for minimum 90mph wind design zone.
IBC 1803.1 General - geotech
Corrective Action Required
09/15/2021

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Structural design criteria conflicts with report. Clarify.
Misc
Corrective Action Required
09/15/2021

2018 IRC 302.12 & 502.12 Draftstopping. Action required: Specify draftstopping at floor and roof assemblies.
Misc
Corrective Action Required
09/15/2021

HVAC condensing units shown on ground and roof. Action required: Clarify. Also, if on roof, electric outlets are required within 25' of each unit per 2018 IRC R3901.12.
Misc
Corrective Action Required
09/15/2021

2018 IRC R2903.3.1 Maximum pressure. Action required: Provide pressure reducing valve at each service.
Miscellaneous Correction
Corrective Action Required
09/15/2021

2018 IRC 2903.5 Water Hammer. Action required: Provide water hammer device(s) at all appropriate locations. Remove references to air chambers as they are no longer allowed.
Miscellaneous Correction
Corrective Action Required
09/15/2021

2018 IRC 302..2.4 Parapets - exception to item #2 Action required: Comment is for informational purposes. Roof assembly design complies and drawings dictate no penetrations within 4' of separations but plumbing plans show VTRs within that 4'. Understood that drawings are schematic. To be field verified.
Licensed Contractors Rejected 09/17/2021 09/14/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/14/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
09/14/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A , Class B, or Class C license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $8,245.29 $8,245.29 Paid 03/18/2022
8331507-Sewer Connection Fee $1,980.00 $1,980.00 Paid 03/18/2022
7232302-Residential License Tax Fee $3,655.68 $3,655.68 Paid 03/18/2022
8331401-Water Tap Fee $21,930.00 $21,930.00 Paid 03/18/2022
8350015-Water Meter Fee $2,875.44 $2,875.44 Paid 03/18/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 12/09/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/09/2023
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 4/5/2022 (8:45) 4/5/2022 04/05/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/05/2022
NO GRID LINES ON PLANS BLDG # 1 NORTH,SOUTH,EAST & GARAGE FOOTINGS. UFER LOCATED NE CORNER
Footing Inspection - Commercial Passed 4/7/2022 (11:00) 4/7/2022 04/07/2022
THE FOLLOWING AREAS ARE APPROVED
Resolved
04/07/2022
NO GRID LINES ON PLANS BLDG # 1 NORTH,SOUTH,EAST, WEST & GARAGE FOOTINGS. UFER LOCATED NE CORNER
Underslab Plumbing Inspection - Commercial Passed 4/14/2022 4/14/2022 04/14/2022
Underslab Electrical Inspection - Commercial Passed 4/21/2022 4/21/2022 04/21/2022
Misc
Informational
04/21/2022
-Conduit for kitchen islands- all units
Sewer Service Inspection Partial 06/09/2022
Misc
Informational
06/09/2022
This tie in was performed previously. Not known if inspected. 6/9/22 ES
Sewer Service Inspection Passed 08/29/2022
Misc
Informational
06/09/2022
Sewer tie in completed 8/26/22, this tie in runs into the back of a 6”x4” wye via a 6” to 4” reducer. The service line for the building north of it(914 Black Twig) runs into the top of the 4” wye connection and they run into a 6” service line to the main into an 8”x6” wye. Spoke with Brent Dye at water and Amanda Bagwell agreed this was acceptable, and they would not need to remove the existing wye connection for this building. 8/26/22 ES
All Rough Inspection - Commercial Failed 9/12/2022 9/12/2022 09/12/2022
Miscellaneous Correction
Corrective Action Required
09/12/2022
900 Black Twig Cir Nail exterior sheathing behind front door Provide documentation on yellow fire caulk used at upward penetrations Provide anchor bolts within 12" of plate break Anchor bolts garage portal frame ? Nail hold-downs in garage Fire caulk dwv at top plate hall bath Fire caulk upward penetrations at ducts in bedroom closet Provide plumbing nail guards in laundry room Fire caulk bores bottom plate master bathroom Seal upward penetrations master behind vanity at ceiling line Provide grounding at metal boxs front porch light & coach lights garage Provide fire stop every 10' party walls 902 Fire block top plate kitchen Provide vertical fire stop every 10' Strap top plate master bedroom Seal fire blocking master bedroom Seal top plate master bath & hall bath at vanity Fire caulk dwv & ducts in closet 904 Joist hanger above front door 910 black twig Provide ufer ground to disconnect 906 Fire caulk duct dead space in closet Fire caulk upward penetration hall bath 908 Fire blocking 910 Provide ufer access & connect grounding electrode to disconnect Provide H2.5s above stair landing Seal duct work at ceiling in dead space bedroom closet
All Rough Inspection - Commercial Failed 9/14/2022 9/14/2022 09/14/2022
Miscellaneous Correction
Corrective Action Required
09/12/2022
900 Black Twig Cir Anchor bolts garage portal frame ? Fire caulk / fire block 902 Fire block top plate kitchen Seal fire blocking master bedroom Seal top plate master bath & hall bath tub 904 Fire bloxking / fire caulk 906 Fire blocking / fire caulk 908 Fire blocking / fire caulk 910 Provide ufer access & connect grounding electrode to disconnect Complete sec feeders Provide H2.5s above stair landing Seal duct work at ceiling in dead space bedroom closet & above tub
All Rough Inspection - Commercial Passed 9/15/2022 9/15/2022 09/16/2022
Miscellaneous Correction
Resolved
09/16/2022
Rated Assembly Inspection Passed 10/4/2022 10/4/2022 10/04/2022
Electrical Service Inspection Failed 10/27/2022 10/27/2022 10/27/2022
Miscellaneous Correction
Corrective Action Required
10/27/2022
LABLE SERVICE PANELS / MAIN DISCONNECT INSTALL DISCONNECT LAND GROUNDING ELECTRODE ( UFER )
Piers/Caissons Inspection - Commercial Failed 11/2/2022 (8:30) 11/2/2022 11/02/2022
Miscellaneous Correction
Corrective Action Required
11/02/2022
Screw in light pole bases South corner 900 Between 900 & 914 Between 938 & 1000 Between 1008 & 1012 Provide Documentation for grounding, depth Manufacturers installation instructions Each 4 plex 5 plex has individual permit Call In on correct permits
Sidewalk Inspection Partial 11/04/2022
Misc
Informational
11/04/2022
Harbinger concrete was onsite working on all the driveways and sidewalks for this building. They had them framed up with aggregate in and compacted. They had expansion joint along curb line and had more for between header and approach as well. 11/3/22 ES
Driveway Inspection Partial 11/04/2022
Misc
Informational
11/04/2022
Harbinger concrete was onsite working on all the driveways and sidewalks for this building. They had them framed up with aggregate in and compacted. They had expansion joint along curb line and had more for between header and approach as well. 11/3/22 ES
Piers/Caissons Inspection - Commercial Failed 11/8/2022 (1:45) 11/9/2022 11/09/2022
Miscellaneous Correction
Corrective Action Required
11/02/2022
PROVIDE ADDRESS Screw in light pole bases South corner Lowenstein & 900 Between 900 & 914 Between 928 & 932 Between 938 & 1000 Between 1008 & 1012 THE ABOVE HAVE A DRIVEN GROUND ROD BUT STILL REQUIRE BELOW INFORMATION Provide Documentation for grounding, depth Manufacturers installation instructions Each 4 plex 5 plex has individual permit Call In on correct permits
Electrical Service Inspection Passed 12/5/2022 12/5/2022 12/05/2022
Miscellaneous Correction
Informational
12/05/2022
Service for units: 900, 902, 904, 906, 908, 910, & House panel
Occupancy Inspection - Codes Commercial Failed 12/8/2022 12/08/2022
Misc
Corrective Action Required
12/08/2022
-Provide permanent Stop sign at Black Twig and Lowenstein -Throughout all units: -Complete final grade and sod -Provide GFCI protection at dishwasher circuit -Provide spark rings at kitchen receptacles -Provide lockout at hot water heater breaker -Provide 3" screws at front doors per security code -Provide splash blocks, downspout extensions, or other means of drainage away from foundation -Provide weather tight enclosure for rooftop units electrical -Secure ac whips at units 900-garage entry door to self close and latch
Occupancy Inspection - Codes Commercial Failed 12/9/2022 12/9/2022 12/08/2022
Misc
Corrective Action Required
12/08/2022
-Provide permanent Stop sign at Black Twig and Lowenstein -Throughout all units: -Complete final grade and sod -Provide GFCI protection at dishwasher circuit -Provide spark rings at kitchen receptacles -Provide lockout at hot water heater breaker -Provide 3" screws at front doors per security code -Provide splash blocks, downspout extensions, or other means of drainage away from foundation -Provide weather tight enclosure for rooftop units electrical -Secure ac whips at units 900-garage entry door to self close and latch 908-secure secondary lock
Occupancy Inspection - Codes Commercial Ready for Temp CO 12/9/2022 12/9/2022 12/09/2022
Misc
Corrective Action Required
12/08/2022
-Provide permanent Stop sign at Black Twig and Lowenstein -Complete final grade and sod -Provide splash blocks, downspout extensions, or other means of drainage away from foundation
Occupancy Inspection - Codes Commercial Ready for Temp CO 1/9/2023 1/9/2023 01/09/2023
Misc
Corrective Action Required
12/09/2022
-Provide permanent Stop sign at Black Twig and Lowenstein -Complete final grade and sod -Provide splash blocks, downspout extensions, or other means of drainage away from foundation
Sidewalk Inspection Passed 1/24/2023 1/24/2023 01/24/2023
Misc
Informational
11/04/2022
Harbinger concrete was onsite working on all the driveways and sidewalks for this building. They had them framed up with aggregate in and compacted. They had expansion joint along curb line and had more for between header and approach as well. 11/3/22 ES 1-24-23 AN driveway is competed
Driveway Inspection Passed 1/24/2023 1/24/2023 01/24/2023
Misc
Informational
11/04/2022
Harbinger concrete was onsite working on all the driveways and sidewalks for this building. They had them framed up with aggregate in and compacted. They had expansion joint along curb line and had more for between header and approach as well. 11/3/22 ES 1-24-23 AN driveway is competed
Occupancy Inspection - Codes Commercial Failed 2/7/2023 2/7/2023 02/07/2023
Misc
Corrective Action Required
01/09/2023
-Complete final grade and sod
Occupancy Inspection - Codes Commercial Full C of O 2/8/2023 02/08/2023
Misc
Resolved
02/08/2023
-Complete final grade and sod
Rated Assembly Inspection Passed 02/08/2023
Erosion Control Inspection Residential Not Ready 02/08/2023
Erosion Control Inspection Residential Passed 02/08/2023
Documents & Images
Date Uploaded File Type Document Name
09/02/2021 Application Form Comm Permit Application 9.1.2021
09/02/2021 Application Form License Tax 9.1.2021
09/02/2021 Engineer Report/Study Villa Lot 7B Geotechnical Report 082421
09/02/2021 Engineer Report/Study TRI2102 Vanguard Villas Structural Calcs
09/02/2021 Plans 20-078_Vanguard Villas_100% Permit Set_9_2_2021
09/02/2021 Specifications 20-078 Vanguard Villas Project Manual
09/15/2021 Letter DS P/R Corrections Document
09/27/2021 Specifications 087100_Door_Hardware 9_23_2021
09/27/2021 Letter 20-078_Vanguard Villas_code_response letter 9_24_2021
09/27/2021 Plans 20-078_Vanguard Villas_Permit Comments 9_24_2021
11/12/2021 Letter 20-078_Vanguard Villas_Addendum 1 Narrative_11_12_2021
11/12/2021 Engineer Report/Study Appendix 1 _ul spec_11_12_2021
11/12/2021 Plans 20-078_Vanguard Villas_addendum 1_11_12_2021
02/18/2022 Plans 20-078_Vanguard Villas_2_17_2022_Part 2
02/18/2022 Plans 20-078_Vanguard Villas_2_17_2022_Part 1
02/18/2022 Approved Plans approved_Vanguard Villas_2_17_2022_Part 1
02/18/2022 Approved Plans Approved_Vanguard Villas_2_17_2022_Part 2
03/10/2022 Engineer Report/Study CFSE - Vangard Villas Letter of Intent
03/18/2022 Receipt Receipt for transaction:2022-001492
03/18/2022 Letter DS Building Permit
04/05/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter 20-060 Vanguard Villas_Revision 1 Narrative_5_12_2022
05/12/2022 Plans 20-060 Vanguard Villas_Revision 1_5_12_2022
05/12/2022 Approved Plans approved - 20-060 Vanguard Villas_Revision 1_5_12_2022
06/09/2022 Letter INSPECTION SUMMARY
07/20/2022 Plans 20-078_Vanguard Villas_Revision 2_7_20_2022
07/22/2022 Approved Plans approved - 20-078_Vanguard Villas_Revision 2_7_20_2022
08/29/2022 Letter INSPECTION SUMMARY
08/29/2022 Sanitary connection with wye connecting 914 Black Twig also
09/12/2022 Letter INSPECTION SUMMARY
09/13/2022 Vanguard Villas Buildings 1-14 Engineered Truss Package SD
09/13/2022 approved trusses
09/14/2022 Letter INSPECTION SUMMARY
09/15/2022 Letter INSPECTION SUMMARY
10/04/2022 Letter INSPECTION SUMMARY
10/04/2022 Letter INSPECTION SUMMARY
10/27/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/04/2022 Letter INSPECTION SUMMARY
11/04/2022 Letter INSPECTION SUMMARY
11/09/2022 Letter INSPECTION SUMMARY
11/09/2022 Letter INSPECTION SUMMARY
11/11/2022 Approved Plans approved light pole base
12/05/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/09/2022 Letter License Tax Bill
12/09/2022 Letter License Tax Bill
12/09/2022 Certificate/License Codes Temporary Certificate of Occupancy
12/09/2022 Receipt Receipt for transaction:2022-009388
01/06/2023 Substantial Completion and TCO Extension Request_prcom20214607
01/09/2023 Letter License Tax Bill
01/09/2023 Certificate/License Codes Temporary Certificate of Occupancy
01/09/2023 Receipt Receipt for transaction:2023-000100
01/24/2023 Letter INSPECTION SUMMARY
01/24/2023 Letter INSPECTION SUMMARY
02/07/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter Codes Final Certificate of Occupancy
02/08/2023 Letter Field Certificate of Occupancy
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home