Permit Application Status

PRCOM20211647


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20211647
Building Permit - Commercial
Certificate of Occupancy
LMCZ ENTERPRISES LLC
NEW TENANT FINISH
TENANT FINISH FOR NEW VET CLINIC INSIDE NEW PETSUITES BUILDING (PRCOM20210427) Shell has a TCO
04/07/2021
07/20/2021
10/09/2021
06/07/2022
Locations
Contacts
BEAR CONSTRUCTION SERVICES, Address:9218 METCALF #311, Phone:(913) 674-8004  
TOWN & COUNTRY HEATING AND AIR CONDITIONING COMPANY LLC, Address:10674 WIDMER ROAD, Phone:(913) 649-8696  
PRECISE ELECTRIC LLC, Address:3205 STEEL CIR, Phone:(816) 529-1799  
INTEGRITY PLUMBING SERVICES LLC, Address:405 SW Nelson Dr., Phone:(816) 803-9032  
Curran Architecture, Address:5719 Lawton Loop E. Dr. @212, Phone:(317) 288-0681  
Leland Hicks, Address:L.hicks@bearconstructionservices.com, Phone:(913) 238-0081  
LMCZ ENTERPRISES LLC, Address:2400 SW WINTERFIELD CT  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Rejected 03/11/2022 03/11/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
03/11/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide plans stamped by a Missouri licensed P.E. Include equipment specifications. 03/02/2022- Resolved. Stamped plans were provided with minimal changes based on provided comments. Plans are reviewed under the 2018 Edition of the International Fire Code and the 2016 Edition of NFPA 72.
Installation acceptance testing
Corrective Action Required
03/02/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a test.
Miscellaneous Correction
Corrective Action Required
03/02/2022

Remove the exterior notification appliances except for the horn/strobe over the FDC for activation by waterflow only.
Miscellaneous Correction
Corrective Action Required
03/02/2022

Provide audible notification appliances in the boarding and daycare areas. Remove the audible appliances and replace with visual notification only in the surgical areas.
Miscellaneous Correction
Corrective Action Required
03/02/2022

Relays to the ceiling fans are only required unless the are high volume low speed (HVLS) appliances. It is also not reuired under the 2016 Edition of NFPA 72, adopted as the standard by the 2018 IFC.
Miscellaneous Correction
Corrective Action Required
03/02/2022

The Knox Box shall be mounted 6' AFF over the FDC and below the exterior horn/strobe.
Alarm Plan Review Rejected 02/21/2022 02/22/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide plans stamped by a Missouri licensed P.E. Include equipment specifications.
Installation acceptance testing
Corrective Action Required
02/22/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a test.
Miscellaneous Correction
Corrective Action Required
02/22/2022

Heat detection is not required. The same is true with smoke detection except as required by other portions of the code. Smoke deyection in some areas may be problematic due to ambient conditions.
Miscellaneous Correction
Corrective Action Required
02/22/2022

Remove the exterior notification appliances except for the horn/strobe over the FDC for activation by waterflow only.
Miscellaneous Correction
Corrective Action Required
02/22/2022

Provide audible notification appliances in the boarding and daycare areas. Remove the audible appliances and replace with visial notification in the surgical areas.
Miscellaneous Correction
Corrective Action Required
02/22/2022

Relays to the ceiling fans are only required unless the are high volume low speed (HVLS) appliances. It is also not reuired under the 2016 Edition of NFPA 72, adopted as the standard by the 2018 IFC.
Miscellaneous Correction
Corrective Action Required
02/22/2022

The Knox Box shall be mounted 6' AFF over the FDC and below the exterior horn/strobe.
Licensed Contractors Approved 05/03/2021 07/20/2021
Joe Frogge
LC - General Contractor
Resolved
07/20/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 4/26/21 - acknowledged in letter.
LC - MEP Subs
Resolved
07/20/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/26/21 - acknowledged in letter.
Fire Plan Review Approved with Conditions 05/03/2021 04/26/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/26/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Hazardous material identification
Corrective Action Required
04/26/2021

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 5003.5. (Verified At Inspection) Provide labeling for the X-Ray Room and the med gas room.
Construction documents - Fire protection systems
Corrective Action Required
04/26/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net.
Installation acceptance testing
Corrective Action Required
04/26/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Resolved
04/26/2021

(Action Required) Provide specs on amount (cuft.) of oxidizing gases to be stored and used with the manifold system. Amounts over 504 cuft. will be required to be in a one-hour interior room.
Building Plan Review Approved with Conditions 05/03/2021 04/26/2021
Joe Frogge
Misc
Resolved
07/20/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IBC 1606.2 Design dead load - structural
Resolved
04/26/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report (or design) to verify that roof structure will support additional load imposed by Energy Recover Ventilator.
IBC 1209.2 Finish materials
Resolved
04/26/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at mop/janitor sinks. If paint is used it must be epoxy based.
IMC 801.2 Combustion air required
Resolved
04/26/2021

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for water heater combustion air and ventilation systems.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
04/26/2021

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected. 4/26/21 - noted in letter but drawing revisions unclear to me. Field verify.
IBC 427.1 One-hour exterior room - medical gas
Resolved
04/26/2021

2018 427.2.2 One-hour interior room. One-hour interior room. Where an exterior wall cannot be provided for the room, a 1-hour interior room or enclosure shall be provided and separated from the remainder of the building by fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both, with a fire-resistance rating of not less than 1 hour. Openings between the room or enclosure and interior spaces shall be provided with self-closing smoke- and draft-control assemblies having a fire protection rating of not less than 1 hour. An automatic sprinkler system shall be installed within the room. The room shall be exhausted through a duct to the exterior. Supply and exhaust ducts shall be enclosed in a 1-hour rated shaft enclosure from the room to the exterior. Approved mechanical ventilation shall comply with the International Mechanical Code and be provided with a minimum rate of 1 cubic foot per minute per square foot of the area of the room. Modify designs at Tank Room 126A to include the following: - Door must be smoke/draft controlled. - Door must be 1 hour fire rated. - Provide complete ventilation design per IMC 510.6.
Building Plan Review Rejected 04/19/2021 04/12/2021
Joe Frogge
Misc
Corrective Action Required
04/09/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IBC 1606.2 Design dead load - structural
Corrective Action Required
04/12/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report (or design) to verify that roof structure will support additional load imposed by Energy Recover Ventilator.
IBC 1209.2 Finish materials
Corrective Action Required
04/12/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at mop/janitor sinks. If paint is used it must be epoxy based.
IMC 801.2 Combustion air required
Corrective Action Required
04/12/2021

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for water heater combustion air and ventilation systems.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
04/12/2021

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected.
IBC 427.1 One-hour exterior room - medical gas
Corrective Action Required
04/12/2021

2018 427.2.2 One-hour interior room. One-hour interior room. Where an exterior wall cannot be provided for the room, a 1-hour interior room or enclosure shall be provided and separated from the remainder of the building by fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both, with a fire-resistance rating of not less than 1 hour. Openings between the room or enclosure and interior spaces shall be provided with self-closing smoke- and draft-control assemblies having a fire protection rating of not less than 1 hour. An automatic sprinkler system shall be installed within the room. The room shall be exhausted through a duct to the exterior. Supply and exhaust ducts shall be enclosed in a 1-hour rated shaft enclosure from the room to the exterior. Approved mechanical ventilation shall comply with the International Mechanical Code and be provided with a minimum rate of 1 cubic foot per minute per square foot of the area of the room. Modify designs at Tank Room 126A to include the following: - Door must be smoke/draft controlled. - Door must be 1 hour fire rated. - Provide complete ventilation design per IMC 510.6.
Licensed Contractors Rejected 04/19/2021 04/09/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
04/09/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
04/09/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 04/19/2021 04/08/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/08/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Hazardous material identification
Corrective Action Required
04/08/2021

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 5003.5. (Verified At Inspection) Provide labeling for the X-Ray Room and the med gas room.
Construction documents - Fire protection systems
Corrective Action Required
04/08/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net.
Installation acceptance testing
Corrective Action Required
04/08/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
04/08/2021

(Action Required) Provide specs on amount (cuft.) of oxidizing gases to be stored and used with the manifold system. Amounts over 504 cuft. will be required to be in a one-hour interior room.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Tenent Finish $1,600.00 $1,600.00 Paid 07/20/2021
8331507-Sewer Connection Fee $660.00 $660.00 Paid 07/20/2021
Commercial Excise Tax Fee $23,947.50 $23,947.50 Paid 05/13/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 7/29/2021 7/29/2021 07/29/2021
THE FOLLOWING AREAS ARE APPROVED
Resolved
05/11/2022
In-wall Inspection Passed 12/27/2021 12/27/2021 12/27/2021
Gas Piping Inspection - Commercial Passed 2/16/2022 02/16/2022
Gas Service Inspection - Commercial Passed 2/16/2022 2/16/2022 02/16/2022
Above Ceiling Inspection Partial 4/4/2022 4/4/2022 04/04/2022
Miscellaneous Correction
Corrective Action Required
04/04/2022
COMPLETE ISOLATION ROOM EXHAUST FAN TO ROOF, OK TO DROP CEILING TILE ALL OTHER AREAS
Above Ceiling Inspection Passed 4/5/2022 4/5/2022 04/05/2022
Miscellaneous Correction
Resolved
04/05/2022
OK TO DROP CEILING TILE
Underslab Plumbing Inspection - Commercial Passed 5/11/2022 05/11/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/29/2021
- PARTIAL SOUTH END UNDERSLAB FOR ANIMAL HOSPITAL -
Occupancy Inspection - Codes Commercial Failed 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/11/2022
Label electrical panels Provide GFCI protection washing machine Provide restroom signage Pay license tax fee
Rated Assembly Inspection Passed 5/11/2022 05/11/2022
Occupancy Inspection - Fire Partial 5/11/2022 5/11/2022 05/11/2022
Corrective Action Required
05/11/2022
Devices to be used to secure the exterior gates need to be in place. Exterior gate locks need to have panic hardware or shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Occupancy Inspection - Fire Passed 6/7/2022 6/7/2022 06/07/2022
Occupancy Inspection - Codes Commercial Full C of O 6/7/2022 6/7/2022 06/07/2022
Misc
Resolved
06/07/2022
Label electrical panels Provide GFCI protection washing machine Provide restroom signage Pay license tax fee
Documents & Images
Date Uploaded File Type Document Name
04/07/2021 Application Form Commercial Permit Application-Lees Summit Animal Hospital build out
04/07/2021 Plans 210095 Lees Summit permit set 4-1-21
04/08/2021 Letter Fire Building Plan Review
04/12/2021 Letter DS P/R Corrections Document
04/26/2021 Letter PRCOM20211647 Response letter
04/26/2021 Engineer Report/Study 210095 Lees Summit Roof Jst Calcs
04/26/2021 Plans 210095 Lees Summit permit comment set 4-23-21
04/26/2021 Approved Plans approved - 210095 Lees Summit permit comment set 4-23-21
04/26/2021 Letter Fire Building Plan Review
07/20/2021 Application Form License Tax - Application LS Animal Hospital North
07/20/2021 Letter License Tax Bill
07/20/2021 Receipt Receipt for transaction:2021-005759
07/20/2021 Letter DS Building Permit
07/27/2021 Approved Plans Approved - Plumbing
07/29/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
02/16/2022 Letter INSPECTION SUMMARY
02/16/2022 Letter INSPECTION SUMMARY
02/22/2022 PetSuites FA-01 Lee's Summit Rev2 Hospital
02/22/2022 PetSuites FA-02 Lee's Summit Rev2 Hospital
02/22/2022 Letter Fire (Alarm) Plan Review Notice
03/02/2022 PetSuites FA-01 Lee's Summit Rev2 Hospital
03/02/2022 PetSuites FA-02 Lee's Summit Rev2 Hospital
03/11/2022 Letter Fire (Alarm) Plan Review Notice
04/04/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter Fire Loss Reduction Form
05/13/2022 Receipt Receipt for transaction:2022-003396
06/07/2022 Letter Codes Final Certificate of Occupancy
06/07/2022 Letter Field Certificate of Occupancy
06/07/2022 Letter Fire Building Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home