Permit Application Status

PRCOM20211431


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20211431
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW TENANT FINISH
TENANT FINISH FOR PILATES GYM
03/30/2021
05/04/2021
10/11/2021
07/30/2021
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Robert Quintana, Architect, Address:14900 Landmark Blvd Ste 530, Phone:(912) 233-2718  
KELLY CONSTRUCTION GROUP INC, Address:4021 E 143RD ST, Phone:(816) 621-7600  
TEMP-CON LLC, Address:15670 S KEELER ST, Phone:(913) 768-4888  
MC POWER COMPANIES INC, Address:510 NE 291 HWY, Phone:(816) 251-4700  
STINE-NICHOLS PLUMBING INC, Address:318 E 16TH AVE, Phone:(816) 348-3481  
mkorte@buildkelly.com, Address:mkorte@buildkelly.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 06/22/2021 06/22/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/22/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 06/07/2021 06/07/2021
Michael Weissenbach
Building Plan Review Approved 05/05/2021 04/29/2021
Joe Frogge
Miscellaneous Correction
Resolved
04/29/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 4/28/21 - not addressed.
IPC 403.1 Minimum number of fixtures
Resolved
04/28/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide service sink.
IBC 1209.2 Finish materials
Resolved
04/28/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at service sink.
Licensed Contractors Approved 05/05/2021 04/29/2021
Joe Frogge
LC - MEP Subs
Resolved
04/29/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/28/21 - not addressed.
LC - General Contractor
Resolved
04/29/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 4/28/21 - not addressed.
Fire Plan Review Approved with Conditions 05/05/2021 04/28/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/28/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide electronic PE stamped shop drawings for the fire alarm system to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
04/28/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide electronic PE stamped shop drawings for the fire sprinkler system to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
04/28/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 04/27/2021 04/14/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
04/14/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
04/14/2021

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide service sink.
IBC 1209.2 Finish materials
Corrective Action Required
04/14/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at service sink.
Licensed Contractors Rejected 04/14/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
04/14/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
04/14/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
Fire Plan Review Approved with Conditions 04/27/2021 04/13/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/13/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide electronic PE stamped shop drawings for the fire alarm system to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
04/13/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide electronic PE stamped shop drawings for the fire sprinkler system to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
04/13/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $600.00 $600.00 Paid 05/04/2021
7232302-Commercial License Tax Fee $4,350.00 $4,350.00 Paid 05/04/2021
8331507-Sewer Connection Fee $30.00 $30.00 Paid 05/04/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 5/18/2021 5/17/2021 05/17/2021
Miscellaneous Correction
Resolved
05/18/2021
In-wall Inspection Failed 5/18/2021 5/18/2021 05/18/2021
Misc
Corrective Action Required
05/18/2021
SECURE PEX LINES IN RESTROOM
In-wall Inspection Passed 5/19/2021 05/19/2021
Miscellaneous Correction
Resolved
05/19/2021
Rated Assembly Inspection Failed 5/25/2021 05/25/2021
Miscellaneous Correction
Corrective Action Required
05/25/2021
PROVIDE SCREW PATTERN IN BACK OFFICE & BEHIND BEAM
In-wall Inspection Partial 5/25/2021 5/25/2021 05/25/2021
Misc
Informational
05/25/2021
IN WALL WALL AT ENTRY APPROVED
Rated Assembly Inspection Partial 5/28/2021 05/28/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/25/2021
ONE LAYER 5/8 TYPE X DETAIL 2 & 2A
Above Ceiling Inspection Partial 6/18/2021 6/18/2021 06/18/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/18/2021
- HARD LID RESTROOM OK TO ROCK -
Above Ceiling Inspection Passed 7/2/2021 7/2/2021 07/02/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/18/2021
- HARD LID RESTROOM OK TO ROCK -
Alarm Test Passed 7/29/2021 07/29/2021
Occupancy Inspection - Fire Passed 7/29/2021 07/29/2021
Corrective Action Required
07/29/2021
Add one (1) 2A10BC fire extinguisher to the business. Delete business name form fire alarm reporting to just the address.
In-wall Inspection Passed 7/30/2021 07/30/2021
Misc
Informational
05/25/2021
IN WALL WALL AT ENTRY APPROVED
Rated Assembly Inspection Passed 7/30/2021 07/30/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/28/2021
ONE LAYER 5/8 TYPE X DETAIL 2 & 2A
Occupancy Inspection - Codes Commercial Full C of O 7/30/2021 7/30/2021 07/30/2021
Documents & Images
Date Uploaded File Type Document Name
03/30/2021 Application Form Palaties
04/13/2021 Engineer Report/Study lighting compliance-report-20210413_115851_159
04/13/2021 Plans CP STREETS OF WEST PRYOR 4-6
04/13/2021 Letter Fire Building Plan Review
04/14/2021 Letter DS P/R Corrections Document
04/28/2021 Plans CP STREETS OF WEST PRYOR 4-6
04/28/2021 Letter Fire Building Plan Review
04/28/2021 Approved Plans approved - CP STREETS OF WEST PRYOR 4-6 (002)
04/29/2021 Application Form City of LS License Tax Form - Club Pilates 04 29 2021
05/04/2021 Receipt Receipt for transaction:2021-002514
05/04/2021 Letter DS Building Permit
05/17/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/28/2021 Letter INSPECTION SUMMARY
06/07/2021 15060 Summit West Pryor - Tenant Finish
06/07/2021 Letter Fire (Sprinkler) Plan Review
06/18/2021 Letter INSPECTION SUMMARY
06/22/2021 Club Pilates FA 6 10 21 PE Stamp
06/22/2021 Club Pilates FA Calcs PE Stamp
06/22/2021 Product Data
06/22/2021 Letter Fire (Alarm) Plan Review Notice
07/02/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter Fire Loss Reduction Form
07/29/2021 Letter Fire Loss Reduction Form
07/30/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter Field Certificate of Occupancy
07/30/2021 Letter Codes Final Certificate of Occupancy
07/30/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home