Permit Application Status

PRCOM20202284


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20202284
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
REPAIR REPLACE UPGRADE
200 AMP SINGLE PHASE UNDERGROUND TEMP METER AND PANEL FOR JOBSITE POWER.
08/12/2020
08/13/2020
01/05/2021
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BSNAER@LYNNELECTRIC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/12/2020 08/12/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $50.00 $50.00 Paid 08/13/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Passed 8/18/2020 8/18/2020 08/18/2020
Miscellaneous Correction
Informational
08/18/2020
-TEMP POWER
Documents & Images
Date Uploaded File Type Document Name
08/12/2020 Scope of Work IMG_1724
08/13/2020 Letter DS Building Permit
08/18/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter Codes Plan Review Conditions
01/11/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home