Permit Application Status

PRCOM20201280


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20201280
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
ALTERATION COMMERCIAL
CORRIDOR ALTERATION
05/19/2020
06/01/2020
11/15/2020
11/10/2020
Locations
Contacts
CONSTRUCTION DESIGNWORKS LLC, Address:6657 WOODLAND DRIVE, Phone:(913) 745-4727  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
CADSTONE STUDIO ARCHITECTURE, Address:1213 W 32ND ST, Phone:(816) 550-0130  
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
AIR CARE HEATING & COOLING, Address:10332 W 79TH ST, Phone:(913) 362-5274  
MISSION PLUMBING, HEATING AND COOLING, Address:5725 NIEMAN RD STE C, Phone:(913) 631-6506  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 11/05/2020
Michael Weissenbach
Sprinkler Plan Review Released for Construction 06/23/2020
Michael Weissenbach
Misc
Corrective Action Required
06/23/2020

(Informational Purposes) Update records showing NFPA 2016 Edition
Licensed Contractors Approved 06/05/2020 06/01/2020
Joe Frogge
LC - MEP Subs
Resolved
06/01/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed HVAC contractor. 5/29/20 - acknowledged in letter
Building Plan Review Approved 06/05/2020 05/29/2020
Joe Frogge
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
05/29/2020

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of rear exit door.
Misc
Resolved
05/29/2020

Inadequate information to complete review. Actions required: - Specify fire rating of wall - Specify fire rating of new door - Specify hardware for new door - Provide complete UL details including nail/screw patterns.
Fire Plan Review Approved with Conditions 06/05/2020 05/29/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
05/29/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
05/29/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
05/29/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Door operations
Resolved
05/29/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Action Required) Provide fire rating and door hardware for exit door.
Fire Plan Review Rejected 06/01/2020 05/19/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
05/19/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
05/19/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
05/19/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Door operations
Corrective Action Required
05/19/2020

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Action Required) Provide fire rating and door hardware for exit door.
Building Plan Review Rejected 06/01/2020 05/19/2020
Joe Frogge
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
05/19/2020

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at latch side of rear exit door.
Misc
Corrective Action Required
05/19/2020

Inadequate information to complete review. Actions required: - Specify fire rating of wall - Specify fire rating of new door - Specify hardware for new door - Provide complete UL details including nail/screw patterns.
Licensed Contractors Rejected 06/01/2020 05/19/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
05/19/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed HVAC contractor.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $30.00 $30.00 Paid 06/08/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 8/25/2020 8/25/2020 08/25/2020
Alarm Test Passed 11/5/2020 11/05/2020
Occupancy Inspection - Fire Passed 11/5/2020 11/05/2020
Occupancy Inspection - Codes Commercial Full C of O 11/10/2020 11/10/2020 11/10/2020
Documents & Images
Date Uploaded File Type Document Name
05/19/2020 Plans summit fair C102 corridor - permit 042720
05/19/2020 Application Form Permit app
05/19/2020 Letter Fire Building Plan Review
05/19/2020 Letter DS P/R Corrections Document
05/29/2020 Letter City Response letter 052820
05/29/2020 Plans smf c102 corridor permit - rev 1 052720
05/29/2020 Letter Fire Building Plan Review
05/29/2020 Plans Approved drawing
06/01/2020 Application Form Permit appRevised
06/01/2020 Receipt Receipt for transaction:2020-002514
06/01/2020 Letter DS Building Permit
06/08/2020 Receipt Receipt for transaction:2020-002752
06/23/2020 Letter Fire (Sprinkler) Plan Review
08/25/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter Field Certificate of Occupancy
11/10/2020 Letter Codes Final Certificate of Occupancy
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter Codes Plan Review Conditions
11/25/2020 Letter Fire Building Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home