Summary
PRCOM20200509
Building Permit - Commercial
Final Completion
JAMS LEES BUSTER LLC
REPAIR REPLACE UPGRADE
REPLACEMENT AND ADDITION OF HVAC EQUIPMENT WITH ASSOCIATED GAS AND ELECTRICAL SEE TENANT FINISH **drawing is in plan review file
02/27/2020
05/06/2020
04/05/2022
Locations
Contacts
JAMS LEES BUSTER LLC, Address:605 W 47TH ST STE 200  
NORTON & SCHMIDT, Address:311 E 11TH AVE, Phone:(816) 421-4232  
PRO PLATINUM LLC, Address:6116 ALDEN RD, Phone:(913) 908-3512  
TRADEMARK ELECTRIC INC, Address:8200 NE US 69 HWY, Phone:(816) 442-8101  
SLOCUM & SONS PLUMBING, Address:3804 S MARSHALL CT, Phone:(816) 373-4817  
BGS CONSTRUCTION, Address:34607 E COLBERN RD, Phone:(816) 566-0351  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Rejected 03/05/2020 03/02/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/02/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved with Conditions 03/05/2020 03/02/2020
Joe Frogge
Planning - Screening of rooftop equipment
Corrective Action Required
03/02/2020

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Comment is for informational purposes. Existing parapet is assumed to be adequate. If not, 4 sided screening will be required for both units. To be field verified.
Fire Plan Review Approved 03/05/2020 03/02/2020
Michael Weissenbach
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $300.00 $300.00 Paid 05/06/2020
Outstanding Fees Amount Paid Owing Date Paid
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $0.00 $50.00 Not Paid
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $0.00 $50.00 Not Paid
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $0.00 $50.00 Not Paid
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $0.00 $50.00 Not Paid


$200.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Gas Service Inspection - Commercial Failed 6/22/2020 6/22/2020 06/22/2020
Misc
Corrective Action Required
06/22/2020
no access
Final Electrical Inspection - Commercial Failed 6/22/2020 6/22/2020 06/22/2020
Misc
Corrective Action Required
06/22/2020
no access-
Final Electrical Inspection - Commercial Failed 6/25/2020 6/25/2020 06/25/2020
Misc
Corrective Action Required
06/22/2020
INSTALL BONDING BUSHING ON NEW METER CAN AND DISCONNECT FOR STEEL NIPPLE BETWEEN THE 2. mark.harding@cityofls.net
Final Electrical Inspection - Commercial Failed 7/16/2020 7/16/2020 07/16/2020
Misc
Corrective Action Required
06/25/2020
-INSTALL BONDING BUSHING ON NEW METER CAN AND DISCONNECT FOR STEEL NIPPLE BETWEEN THE 2. -PROVIDE OSHA APPROVED ACCESS TO ROOF TOP UNITS mark.harding@cityofls.net
Final Electrical Inspection - Commercial Passed 7/20/2020 7/20/2020 07/20/2020
Misc
Corrective Action Required
07/16/2020
-INSTALL BONDING BUSHING ON NEW METER CAN AND DISCONNECT FOR STEEL NIPPLE BETWEEN THE 2. -PROVIDE OSHA APPROVED ACCESS TO ROOF TOP UNITS mark.harding@cityofls.net
Gas Service Inspection - Commercial Failed 7/20/2020 7/20/2020 07/20/2020
Misc
Corrective Action Required
06/22/2020
no access - provide approved access to roof for inspection of gas line and 2 new RTU's. 4th inspection fee required.
Gas Service Inspection - Commercial Failed 7/21/2020 7/21/2020 07/21/2020
Misc
Corrective Action Required
07/20/2020
no access - provide approved access to roof for inspection of gas line and 2 new RTU's. 4th inspection fee required. Failed-MARK HARDING 07/21/2020 9:40 AM provide approved ladder to roof top, tie off , provide ladder over side to roof deck. paint gas line to RTU's. Label RTU'Sfor space "D" 1 & 2 or A&B . 4 Re-inspection fee due
Final Inspection - Commercial Passed 04/05/2022
Documents & Images
Date Uploaded File Type Document Name
02/28/2020 Engineer Report/Study structural evaluation
03/02/2020 Letter Fire Building Plan Review
05/06/2020 Plans 2020-0463 MEP
05/06/2020 Plans approved - 2020-0463 MEP
05/06/2020 Application Form application
05/06/2020 Receipt Receipt for transaction:2020-001925
05/06/2020 Letter DS Building Permit
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home