Summary
PRCOM20193561
Building Permit - Commercial
Withdrawn
LEES SUMMIT 29197 L L C
NEW COMMERCIAL
NEW FAST FOOD RESTAURANT WITH DRIVE-THRU
12/09/2019
07/11/2020
10/14/2020
Locations
Contacts
LEES SUMMIT 29197 L L C, Address:605 W 47TH ST 100  
LINEAR ARCHITECTURE - MARK GRIFFIN, Address:8951 CYPRESS WATERS BLVD, STE 130, Phone:(469) 299-7056  
  
  
  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Rejected 02/04/2020 01/30/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
01/28/2020

General Contractor: Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 1/10/20 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
01/28/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/10/20 - acknowledged in letter
Building Plan Review Rejected 02/04/2020 01/30/2020
Joe Frogge
Final Development Plan
Corrective Action Required
01/28/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
01/28/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
01/28/2020

A demolition permit must be obtained to remove existing building prior to release of building permit. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
01/28/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
01/28/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
01/28/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral. 1/13/20 - deferred per request
Fire Plan Review Approved with Conditions 02/04/2020 01/29/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
01/28/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 61
Address numbers required
Corrective Action Required
01/28/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Installation acceptance testing
Corrective Action Required
01/28/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Type 1 hood and duct detection will have to pass before a final occupancy inspection can be scheduled.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
01/28/2020

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/28/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC fire extinguisher.
Miscellaneous Correction
Resolved
01/29/2020

(Action Required) IFC 2018 Chapter 53 Provide specs on the CO2 Tank. Markings 5303.4 Security 5303.5 1/10/2020 Gas detection will be required: Piping will be located indoors. Provide specs on the gas detection system.
Duct smoke detectors
Corrective Action Required
01/28/2020

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection)
Panic and fire exit hardware
Corrective Action Required
01/28/2020

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection)
Building Plan Review Rejected 01/16/2020 01/13/2020
Joe Frogge
Final Development Plan
Corrective Action Required
01/09/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
01/09/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
01/09/2020

A demolition permit must be obtained to remove existing building prior to release of building permit. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
01/09/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
01/09/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
01/09/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral. 1/13/20 - deferred per request
IBC 1803.1 General - geotech
Resolved
01/13/2020

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
ICC A117.1 305.3 Clear Floor Space
Resolved
01/13/2020

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. Action required: Update design to reflect larger clear floor space requirements.
ICC A117.1 304.3 Turning Space
Resolved
01/13/2020

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Update design to reflect larger turning space requirements.
IBC 1016.2 Egress through intervening spaces
Resolved
01/13/2020

2018 IBC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. Item 5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Do not direct egress through storage room.
Miscellaneous Correction
Resolved
01/13/2020

Provide pier/foundation designs for Canopy, Menu Boards, Trash Enclosure, etc. Sheets C8 & C9 reference structural design but they were not found in the S series drawings. Action required: Provide complete pier/foundation designs.
IMC 306.5 Equipment on roofs
Resolved
01/13/2020

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanently attached roof access.
Fire Plan Review Rejected 01/16/2020 01/10/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
01/09/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 61
Address numbers required
Corrective Action Required
01/09/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Installation acceptance testing
Corrective Action Required
01/09/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Type 1 hood and duct detection will have to pass before a final occupancy inspection can be scheduled.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
01/09/2020

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/09/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC fire extinguisher.
Miscellaneous Correction
Corrective Action Required
01/09/2020

(Action Required) IFC 2018 Chapter 53 Provide specs on the CO2 Tank. Markings 5303.4 Security 5303.5 1/10/2020 Gas detection will be required: Piping will be located indoors. Provide specs on the gas detection system.
Duct smoke detectors
Corrective Action Required
01/09/2020

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection)
Panic and fire exit hardware
Corrective Action Required
01/09/2020

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection)
Licensed Contractors Rejected 01/09/2020 01/10/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
01/09/2020

General Contractor: Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 1/10/20 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
01/09/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/10/20 - acknowledged in letter
Building Plan Review Rejected 12/23/2019 12/16/2019
Joe Frogge
Final Development Plan
Corrective Action Required
12/16/2019

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
12/16/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
12/16/2019

A demolition permit must be obtained to remove existing building prior to release of building permit. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
12/16/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
12/16/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
12/16/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral.
IBC 1803.1 General - geotech
Corrective Action Required
12/16/2019

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
12/16/2019

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. Action required: Update design to reflect larger clear floor space requirements.
ICC A117.1 304.3 Turning Space
Corrective Action Required
12/16/2019

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Update design to reflect larger turning space requirements.
IBC 1016.2 Egress through intervening spaces
Corrective Action Required
12/16/2019

2018 IBC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. Item 5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Do not direct egress through storage room.
Miscellaneous Correction
Corrective Action Required
12/16/2019

Provide pier/foundation designs for Canopy, Menu Boards, Trash Enclosure, etc. Sheets C8 & C9 reference structural design but they were not found in the S series drawings. Action required: Provide complete pier/foundation designs.
IMC 306.5 Equipment on roofs
Corrective Action Required
12/16/2019

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanently attached roof access.
Licensed Contractors Rejected 12/23/2019 12/16/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
12/16/2019

General Contractor: Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
12/16/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 12/23/2019 12/12/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
12/12/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 61
Address numbers required
Corrective Action Required
12/12/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Installation acceptance testing
Corrective Action Required
12/12/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Type 1 hood and duct detection will have to pass before a final occupancy inspection can be scheduled.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
12/12/2019

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
12/12/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC fire extinguisher.
Miscellaneous Correction
Corrective Action Required
12/12/2019

(Action Required) IFC 2018 Chapter 53 Provide specs on the CO2 Tank. Markings 5303.4 Security 5303.5
Duct smoke detectors
Corrective Action Required
12/12/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection)
Panic and fire exit hardware
Corrective Action Required
12/12/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection)
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
12/12/2019 Letter Fire Building Plan Review
12/16/2019 Letter DS P/R Corrections Document
01/10/2020 Letter Fire Building Plan Review
01/13/2020 Letter DS P/R Corrections Document
01/29/2020 Letter Fire Building Plan Review
10/14/2020 Email RE 711 SE M 291 Hwy Wendy's
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: