Permit Application Status

PRCOM20193506


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20193506
Building Permit - Commercial
Certificate of Occupancy
VAAP RAINTREE LLC
CHANGE OF TENANT
TENANT FINISH FOR CLOTHING STORE
12/03/2019
01/15/2020
07/08/2020
01/17/2023
Locations
Contacts
VAAP RAINTREE LLC, Address:5007 W 147TH ST  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
PORTER ELECTRICAL, Address:114 VETERANS PKWY, Phone:(816) 540-3271  
RITEWAY PLUMBING LLC, Address:2101 SW OSAGE DR, Phone:(816) 813-9849  
BENNETT HOME IMPROVEMENT & BUILDING INC, Address:708 NW R D MIZE RD STE J , Phone:(816) 229-4711  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 03/11/2020
Michael Weissenbach
Misc
Corrective Action Required
03/11/2020

(Informational Purposes) 1. Current annual inspection tag on riser 2. Update records showing NFPA 2016
Building Plan Review Approved with Conditions 01/22/2020 01/14/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
01/14/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 1/10/20 - acknowledged in letter
Project cost
Corrective Action Required
01/14/2020

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 1/10/20 - acknowledged in letter
IBC 1103.1 Where required - accessibility
Corrective Action Required
01/14/2020

2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Comment is for informational purposes. Changing rooms as shown are compliant but the addition/installation of fixed furniture will pose accessibility problems. To be field verified. 1/10/20 - acknowledged in letter - field verify
IBC 1209.2 Finish materials
Corrective Action Required
01/14/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at restrooms and mop sink. If paint is used it must be epoxy based. 1/10/20 - acknowledged in letter - field verify
IPC 403.1 Minimum number of fixtures
Corrective Action Required
01/14/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved equivalent. 1/10/20 - acknowledged in letter as bottled water provided by tenant - field verify
IBC 1016.2 Egress through intervening spaces
Resolved
01/14/2020

Plan review comment added after MEP design provided. 2018 IBC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. Item 5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Remove exit sign directing egress through storage room.
Licensed Contractors Approved 01/14/2020 01/14/2020
Joe Frogge
Fire Plan Review Approved with Conditions 01/22/2020 01/14/2020
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
01/14/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
01/14/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address front and back doors.
Construction documents - Fire protection systems
Corrective Action Required
01/14/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
01/14/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/14/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide one 2A10BC Fire Extinguisher
Egress through intervening spaces.
Corrective Action Required
01/14/2020

2018 IFC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. (Verified At Inspection) Exit sign not required leading into storage area.
Building Plan Review Rejected 01/13/2020 01/10/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
01/06/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 1/10/20 - acknowledged in letter
Project cost
Corrective Action Required
01/06/2020

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 1/10/20 - acknowledged in letter
Miscellaneous Correction
Resolved
01/10/2020

Insufficient information to complete review. Action required: Provide complete MEP designs or detailed scopes of work that addresses all materials and methods.
IBC 1103.1 Where required - accessibility
Corrective Action Required
01/06/2020

2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Comment is for informational purposes. Changing rooms as shown are compliant but the addition/installation of fixed furniture will pose accessibility problems. To be field verified. 1/10/20 - acknowledged in letter - field verify
IBC 1209.2 Finish materials
Corrective Action Required
01/06/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at restrooms and mop sink. If paint is used it must be epoxy based. 1/10/20 - acknowledged in letter - field verify
IPC 403.1 Minimum number of fixtures
Corrective Action Required
01/06/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved equivalent. 1/10/20 - acknowledged in letter as bottled water provided by tenant - field verify
IBC 1016.2 Egress through intervening spaces
Corrective Action Required
01/10/2020

Plan review comment added after MEP design provided. 2018 IBC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. Item 5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. (See code section for additional items and exceptions) Action required: Remove exit sign directing egress through storage room.
Licensed Contractors Approved 01/06/2020 01/06/2020
Joe Frogge
LC - General Contractor
Resolved
01/06/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Fire Plan Review Approved with Conditions 01/13/2020 01/06/2020
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
01/06/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
01/06/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address front and back doors.
Construction documents - Fire protection systems
Corrective Action Required
01/06/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
01/06/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/06/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide one 2A10BC Fire Extinguisher
Egress through intervening spaces.
Corrective Action Required
01/06/2020

2018 IFC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. (Verified At Inspection) Exit sign not required leading into storage area.
Building Plan Review Rejected 12/13/2019 12/04/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
12/04/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
12/04/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
12/04/2019

Insufficient information to complete review. Action required: Provide complete MEP designs or detailed scopes of work that addresses all materials and methods.
IBC 1103.1 Where required - accessibility
Corrective Action Required
12/04/2019

2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Comment is for informational purposes. Changing rooms as shown are compliant but the addition/installation of fixed furniture will pose accessibility problems. To be field verified.
IBC 1209.2 Finish materials
Corrective Action Required
12/04/2019

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at restrooms and mop sink. If paint is used it must be epoxy based.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
12/04/2019

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved equivalent.
Licensed Contractors Rejected 12/13/2019 12/04/2019
Joe Frogge
LC - General Contractor
Resolved
01/06/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Fire Plan Review Approved with Conditions 12/13/2019 12/04/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
12/04/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
Address numbers required
Corrective Action Required
12/04/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address front and back doors.
Construction documents - Fire protection systems
Corrective Action Required
12/04/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
12/04/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
12/04/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide one 2A10BC Fire Extinguisher
Egress through intervening spaces.
Corrective Action Required
12/04/2019

2018 IFC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. (Verified At Inspection) Exit sign not required leading into storage area.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $30.00 $30.00 Paid Not payable online 01/15/2020
$0.00
8331507-Sewer Connection Fee $90.00 $90.00 Paid Not payable online 01/15/2020
7232302-Commercial Excise Tax Fee $3,360.00 $3,360.00 Paid Not payable online 01/14/2020
$3,360.00
Outstanding Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $19.82 $0.00 $19.82 Not Paid
$49.82


$19.82    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 1/24/2020 1/24/2020 01/24/2020
Gas Piping Inspection - Commercial Passed 1/24/2020 1/24/2020 01/24/2020
Electrical Service Inspection Passed 2/12/2020 2/12/2020 02/12/2020
All Rough Inspection - Commercial Passed 2/27/2020 2/27/2020 02/27/2020
Above Ceiling Inspection Passed 4/23/2020 4/23/2020 04/23/2020
Misc
Informational
04/23/2020
- RESTROOM & HALL GRID SUSPENDED CEILING -
Alarm Test Failed 6/3/2020 06/03/2020
Alarm Test Passed 6/4/2020 06/04/2020
Occupancy Inspection - Fire Passed 6/4/2020 06/04/2020
Rough Plumbing Inspection - Commercial Passed 2/27/2020 06/05/2020
In-wall Inspection Passed 2/27/2020 06/05/2020
Rough Mechanical Inspection - Commercial Passed 2/27/2020 06/05/2020
Underslab Electrical Inspection - Commercial Passed 2/27/2020 06/05/2020
Final Mechanical Inspection Passed 6/5/2020 06/05/2020
Occupancy Inspection - Codes Commercial Full C of O 6/5/2020 6/5/2020 06/05/2020
Documents & Images
Date Uploaded File Type Document Name
12/04/2019 Letter Fire Building Plan Review
12/04/2019 Letter DS P/R Corrections Document
01/10/2020 Letter DS P/R Corrections Document
01/14/2020 Simply Threads Code Response 01.14.20
01/15/2020 Receipt Receipt for transaction: 2020-000179
01/15/2020 Letter DS Building Permit
01/15/2020 Letter License Tax Bill
01/24/2020 Letter INSPECTION SUMMARY
01/24/2020 Letter INSPECTION SUMMARY
02/03/2020 cost est
02/12/2020 Letter INSPECTION SUMMARY
02/27/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter Fire (Sprinkler) Plan Review
04/23/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home